Permit Application Status

PRCOM20151897


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20151897
Building Permit - Commercial
Certificate of Occupancy
SWAMI HOTELS LLC
NEW COMMERCIAL
HOLIDAY INN EXPRESS - NEW 4 STORY 90 ROOM HOTEL Certified letter sent on 11/30/2017 - 7016 1370 0002 4445 4563
08/17/2015
03/01/2016
05/09/2016
12/04/2017
Locations
Contacts
LEVEL BUILDERS LLC, Address:P O BOX 29145, Phone:(816) 541-4204  
EEI, Address:P O BOX 272, Phone:(816) 682-7288  
M & S ELECTRIC, Address:PO BOX 1147, Phone:(816) 427-5913  
S & S PLUMBING AND HEATING CO INC, Address:34831 187TH ST, Phone:(913) 651-6396  
CHASE B. GARRETT ARCHITECTS, PLLC, Address:PO BOX 8336, Phone:(479) 652-0175  
SWAMI HOTELS LLC, Address:1024 SW WANAMAKER RD  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
REORGANIZED SCHOOL DISTRICT NO 7, Address:301 NE TUDOR RD  
SWAMI HOTELS LLC, Address:9745 SUNSET CIR  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 09/16/2016
Joe Dir
Installation acceptance testing
Corrective Action Required
09/16/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACCEPTANCE TESTING FOR THE FIRE ALARM SYSTEM WILL BE REQUIRED PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300
Licensed Contractors Approved 03/01/2016
Mike Weisenborn
LC - MEP Subs
Resolved
03/01/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Final Development Plan Review Approved 05/09/2016 03/01/2016
Mike Weisenborn
Special Inspections Review Approved 01/28/2016
Mike Weisenborn
Sprinkler Plan Review Released for Construction 12/31/2015
Joe Dir
Fire Plan Review Approved with Conditions 12/01/2015 11/25/2015
Joe Dir
Misc
Corrective Action Required
11/20/2015

506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). To obtain a Knox box application contact the fire department 816-969-1300 ADDRESSED IN RESUB LETTER / PLANS
Construction documents for fire alarm systems
Corrective Action Required
11/20/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for the fire alarm system. ADDRESSED IN RESUB LETTER
Address numbers required
Corrective Action Required
11/20/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified on inspection. ADDRESSED IN RESUB LETTER
Knox box required
Corrective Action Required
11/20/2015

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. to obtain a Knox Box application contact the fire department at 816-969-1300 ADDRESSED IN RESUB LETTER / PLANS
Construction documents - Fire protection systems
Corrective Action Required
11/20/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for the fire supression/sprinkler system. ADDRESSED IN RESUB LETTER
Installation acceptance testing
Corrective Action Required
11/20/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing required for the alarm system and supression system. To schedule a test prior to final occupancy inspection contact the fire department 816-969-1300 ADDRESSED IN RESUB LETTER
Misc
Corrective Action Required
11/20/2015

912.2 Location. With respect to hydrants, driveways, buildings and landscaping, fire department connections shall be so located that fire apparatus and hose connected to supply the system will not obstruct access to the buildings for other fire apparatus. The location of fire department connections shall be approved by the fire chief. 912.2.1 Visible location. Fire department connections shall be located on the street side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire chief. Drawings did not show a FDC on the building. FDC shall be located within 100' of a hydrant. ADDRESSED IN RESUB LETTER/ PLANS
Misc
Corrective Action Required
11/20/2015

[B] 1011.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1011.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1011.5. The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 12 inches (305 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. [B] 1011.5 Internally illuminated exit signs. Electrically powered, self-luminous and photoluminescent exit signs shall be listed and labeled in accordance with UL 924 and shall be installed in accordance with the manufacturer’s instructions and Chapter 27 of the International Building Code. Exit signs shall be illuminated at all times. Verified at inspection ADDRESSED IN RESUB LETTER / PLANS
Misc
Corrective Action Required
11/20/2015

D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. Fire apparatus access roadway shall meet the above conditions. Information purposes. ADDRESSED IN RESUB LETTER / PLANS
Building Plan Review Approved with Conditions 12/01/2015 11/24/2015
Joe Frogge
Final Development Plan
Resolved
03/03/2016

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Misc
Resolved
01/28/2016

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 11/11/15 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
11/20/2015

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
11/20/2015

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
11/20/2015

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Health Dept Inspection
Resolved
12/04/2015

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Engineered truss package
Corrective Action Required
11/20/2015

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package(s) or request deferral to construction. 11/11/15 - deferred per request
Gen - Submittal documents 7-137
Resolved
11/24/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: 1. Provide finish material schedule or 2 copies of Specifications (sealed/signed) in order to verify compliance. 2. Provide detailed construction requirements for fire rated UL assemblies. 11/11/15 - Item 1 is referring to interior finish materials; carpet, paint, tile, etc. especially as concerns code relevant areas. (restrooms & use of textiles) Item 2 - details on A508 reference UL#s only with no construction details (nail patterns, etc). Our inspectors do not have access to UL documnts in field. Details on A509, A510 & A511 are for penetrations 11/24/15 - provided
NEC - Grounding electrode System
Resolved
11/24/2015

2011 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Provide detailed design for grounding electrode system at MDP. 11/11/15 - Grounding system is a required part of wiring diagram. Update diagram with GEC wire sizes and locations. 11/24/15 - detail provided
Miscellaneous Correction
Corrective Action Required
11/20/2015

2011 NEC 680.26 Equipotential Bonding. (A) Performance. The equipotential bonding required by this section shall be installed to reduce voltage gradients in the pool area. 2011 NEC 680.26 (7) Fixed Metal Parts. All fixed metal parts shall be bonded including, but not limited to, metal-sheathed cables and raceways, metal piping, metal awnings, metal fences, and metal door and window frames. Action required: Comment is for informational purposes. To be field verified. 11/11/15 - acknowledged in letter
Health Department Review Approved 05/09/2016 11/20/2015
Joe Frogge
Building Plan Review Rejected 11/13/2015 11/11/2015
Joe Frogge
Final Development Plan
Corrective Action Required
11/06/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Misc
Corrective Action Required
11/06/2015

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 11/11/15 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
11/06/2015

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
11/06/2015

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
11/06/2015

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Code analysis required
Resolved
11/11/2015

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis to reflect correct numbers. Looks as though building was evaluated as IIB but changed to VA? Clarify. 11/11/15 - drawing updated
Health Dept Inspection
Corrective Action Required
11/06/2015

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/11/15 - acknowledged in letter
Health Dept Review
Resolved
11/20/2015

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/11/15 - Jackson County Health Department approval not yet received.
Misc
Resolved
11/11/2015

2012 IBC 1107.6.1.1 Accessible units. Accessible dwelling units and sleeping units shall be provided in accordance with Table 1107.6.1.1. All dwelling units and sleeping units on a site shall be considered to determine the total number of Accessible units. Accessible units shall be dispersed among the various classes of units. Roll-in showers provided in Accessible units shall include a permanently mounted folding shower seat. Action required: Provide additional Accessible Unit per Total Number Of Required Accessible Units column of Table 1107.6.1.1. 11/11/15 - clarified in letter
Misc
Resolved
11/11/2015

2012 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Bottoms of footings/pads appear to not reach the minimum of 36" below grade. Revise details on Sheet A2 or clarify. 11/11/15 - drawings revised
Engineered truss package
Corrective Action Required
11/06/2015

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package(s) or request deferral to construction. 11/11/15 - deferred per request
Misc
Resolved
11/11/2015

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Handrail at roof hatch must extend 30" above roof edge. Modify detail 5/A105.1. 11/11/15 - drawings revised
Misc
Resolved
11/11/2015

2012 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Modify drawings to show how relevant structural elements of the porte cochere will be protected. 11/11/15 - drawings revised
Accessibility - Dining surface height 902.4
Resolved
11/11/2015

ICC A117.1-2009 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Modify height of self-serve coffee cabinetry to comply. 11/11/15 - details revised
Gen - Submittal documents 7-137
Corrective Action Required
11/06/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: 1. Provide finish material schedule or 2 copies of Specifications (sealed/signed) in order to verify compliance. 2. Provide detailed construction requirements for fire rated UL assemblies. 11/11/15 - Item 1 is referring to interior finish materials; carpet, paint, tile, etc. especially as concerns code relevant areas. (restrooms & use of textiles) Item 2 - details on A508 reference UL#s only with no construction details (nail patterns, etc). Our inspectors do not have access to UL documnts in field. Details on A509, A510 & A511 are for penetrations
Misc
Resolved
11/11/2015

2012 IBC 718.3 Draftstopping in floors. In combustible construction, draftstopping shall be installed to subdivide floor/ceiling assemblies in the locations prescribed in Sections 718.3.2 through 718.3.3 2012 IBC 718.4 Draftstopping in attics. In combustible construction, draftstopping shall be installed to subdivide attic spaces and concealed roof spaces in the locations prescribed in Sections 718.4.2 and 718.4.3. Ventilation of concealed roof spaces shall be maintained in accordance with Section 1203.2 Action required: Provide draftstopping in floors and attic or provide verification that automatic sprinkler system will be installed to protect these spaces. 11/11/15 - clarified
Plumb - Minimum number of fixtures 403.1
Resolved
11/11/2015

2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code. Action required: Provide plumbing fixture calculations for this project. Be sure to include both the rooms and common/meeting areas. 11/11/15 - clarified
Misc
Resolved
11/11/2015

110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: Both doors at electrical equipment room must open in direction of travel and be equipped with panic hardware. 11/11/15 - drawings revised
Misc
Resolved
11/11/2015

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide electrical receptacle to serve new roof mounted HVAC. 11/11/15 - no longer relevant as equipment relocated to not be on roof
NEC - Grounding electrode System
Corrective Action Required
11/06/2015

2011 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Provide detailed design for grounding electrode system at MDP. 11/11/15 - Grounding system is a required part of wiring diagram. Update diagram with GEC wire sizes and locations.
Miscellaneous Correction
Corrective Action Required
11/06/2015

2011 NEC 680.26 Equipotential Bonding. (A) Performance. The equipotential bonding required by this section shall be installed to reduce voltage gradients in the pool area. 2011 NEC 680.26 (7) Fixed Metal Parts. All fixed metal parts shall be bonded including, but not limited to, metal-sheathed cables and raceways, metal piping, metal awnings, metal fences, and metal door and window frames. Action required: Comment is for informational purposes. To be field verified. 11/11/15 - acknowledged in letter
Miscellaneous Correction
Resolved
11/11/2015

The plumbing plans indicate that the backflow on the fire line is located inside the building. The fire line backflow on this project will be located on the exterior of the building in a vault. Action required: Make needed corrections to the plumbing plans. 11/11/15 - Backflow clarified to be in yard only even though there is still a detail showing in-building installation. Approving based on the fact that not all details are required to be used.
Licensed Contractors Rejected 11/06/2015 11/11/2015
Joe Frogge
LC - General Contractor
Resolved
11/11/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
11/06/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 11/13/2015 11/10/2015
Joe Dir
Misc
Corrective Action Required
11/06/2015

506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). To obtain a Knox box application contact the fire department 816-969-1300 ADDRESSED IN RESUB LETTER / PLANS
Construction documents for fire alarm systems
Corrective Action Required
11/06/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for the fire alarm system. ADDRESSED IN RESUB LETTER
Address numbers required
Corrective Action Required
11/06/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified on inspection. ADDRESSED IN RESUB LETTER
Knox box required
Corrective Action Required
11/06/2015

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. to obtain a Knox Box application contact the fire department at 816-969-1300 ADDRESSED IN RESUB LETTER / PLANS
Construction documents - Fire protection systems
Corrective Action Required
11/06/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for the fire supression/sprinkler system. ADDRESSED IN RESUB LETTER
Installation acceptance testing
Corrective Action Required
11/06/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing required for the alarm system and supression system. To schedule a test prior to final occupancy inspection contact the fire department 816-969-1300 ADDRESSED IN RESUB LETTER
Misc
Corrective Action Required
11/06/2015

912.2 Location. With respect to hydrants, driveways, buildings and landscaping, fire department connections shall be so located that fire apparatus and hose connected to supply the system will not obstruct access to the buildings for other fire apparatus. The location of fire department connections shall be approved by the fire chief. 912.2.1 Visible location. Fire department connections shall be located on the street side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire chief. Drawings did not show a FDC on the building. FDC shall be located within 100' of a hydrant. ADDRESSED IN RESUB LETTER/ PLANS
Misc
Corrective Action Required
11/06/2015

[B] 1011.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1011.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1011.5. The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 12 inches (305 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. [B] 1011.5 Internally illuminated exit signs. Electrically powered, self-luminous and photoluminescent exit signs shall be listed and labeled in accordance with UL 924 and shall be installed in accordance with the manufacturer’s instructions and Chapter 27 of the International Building Code. Exit signs shall be illuminated at all times. Verified at inspection ADDRESSED IN RESUB LETTER / PLANS
Misc
Corrective Action Required
11/06/2015

D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. Fire apparatus access roadway shall meet the above conditions. Information purposes. ADDRESSED IN RESUB LETTER / PLANS
Building Plan Review Rejected 08/31/2015 08/25/2015
Joe Frogge
License Tax Application
Resolved
10/20/2015

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. received - 10/20/15
Final Development Plan
Corrective Action Required
08/25/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
08/25/2015

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Certificate of Inspection
Corrective Action Required
08/25/2015

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
08/25/2015

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
08/25/2015

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Code analysis required
Corrective Action Required
08/25/2015

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis to reflect correct numbers. Looks as though building was evaluated as IIB but changed to VA? Clarify.
Health Dept Inspection
Corrective Action Required
08/25/2015

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
08/25/2015

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
08/25/2015

2012 IBC 1107.6.1.1 Accessible units. Accessible dwelling units and sleeping units shall be provided in accordance with Table 1107.6.1.1. All dwelling units and sleeping units on a site shall be considered to determine the total number of Accessible units. Accessible units shall be dispersed among the various classes of units. Roll-in showers provided in Accessible units shall include a permanently mounted folding shower seat. Action required: Provide additional Accessible Unit per Total Number Of Required Accessible Units column of Table 1107.6.1.1.
Misc
Corrective Action Required
08/25/2015

2012 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Bottoms of footings/pads appear to not reach the minimum of 36" below grade. Revise details on Sheet A2 or clarify.
Engineered truss package
Corrective Action Required
08/25/2015

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package(s) or request deferral to construction.
Misc
Corrective Action Required
08/25/2015

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Handrail at roof hatch must extend 30" above roof edge. Modify detail 5/A105.1.
Misc
Corrective Action Required
08/25/2015

2012 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Modify drawings to show how relevant structural elements of the porte cochere will be protected.
Accessibility - Dining surface height 902.4
Corrective Action Required
08/25/2015

ICC A117.1-2009 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Modify height of self-serve coffee cabinetry to comply.
Gen - Submittal documents 7-137
Corrective Action Required
08/25/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: 1. Provide finish material schedule or 2 copies of Specifications (sealed/signed) in order to verify compliance. 2. Provide detailed construction requirements for fire rated UL assemblies.
Misc
Corrective Action Required
08/25/2015

2012 IBC 718.3 Draftstopping in floors. In combustible construction, draftstopping shall be installed to subdivide floor/ceiling assemblies in the locations prescribed in Sections 718.3.2 through 718.3.3 2012 IBC 718.4 Draftstopping in attics. In combustible construction, draftstopping shall be installed to subdivide attic spaces and concealed roof spaces in the locations prescribed in Sections 718.4.2 and 718.4.3. Ventilation of concealed roof spaces shall be maintained in accordance with Section 1203.2 Action required: Provide draftstopping in floors and attic or provide verification that automatic sprinkler system will be installed to protect these spaces.
Plumb - Minimum number of fixtures 403.1
Corrective Action Required
08/25/2015

2012 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code. Action required: Provide plumbing fixture calculations for this project. Be sure to include both the rooms and common/meeting areas.
Misc
Corrective Action Required
08/25/2015

110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: Both doors at electrical equipment room must open in direction of travel and be equipped with panic hardware.
Misc
Corrective Action Required
08/25/2015

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide electrical receptacle to serve new roof mounted HVAC.
NEC - Grounding electrode System
Corrective Action Required
08/25/2015

2011 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Provide detailed design for grounding electrode system at MDP.
Miscellaneous Correction
Corrective Action Required
08/25/2015

2011 NEC 680.26 Equipotential Bonding. (A) Performance. The equipotential bonding required by this section shall be installed to reduce voltage gradients in the pool area. 2011 NEC 680.26 (7) Fixed Metal Parts. All fixed metal parts shall be bonded including, but not limited to, metal-sheathed cables and raceways, metal piping, metal awnings, metal fences, and metal door and window frames. Action required: Comment is for informational purposes. To be field verified.
Miscellaneous Correction
Corrective Action Required
08/28/2015

The plumbing plans indicate that the backflow on the fire line is located inside the building. The fire line backflow on this project will be located on the exterior of the building in a vault. Action required: Make needed corrections to the plumbing plans.
Licensed Contractors Rejected 10/30/2015 08/25/2015
Joe Frogge
LC - General Contractor
Corrective Action Required
08/25/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/25/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 08/31/2015 08/24/2015
Joe Dir
Misc
Corrective Action Required
08/24/2015

506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). To obtain a Knox box application contact the fire department 816-969-1300
Construction documents for fire alarm systems
Corrective Action Required
08/24/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for the fire alarm system.
Address numbers required
Corrective Action Required
08/24/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Verified on inspection.
Knox box required
Corrective Action Required
08/24/2015

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. to obtain a Knox Box application contact the fire department at 816-969-1300
Construction documents - Fire protection systems
Corrective Action Required
08/24/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for the fire supression/sprinkler system.
Installation acceptance testing
Corrective Action Required
08/24/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing required for the alarm system and supression system. To schedule a test prior to final occupancy inspection contact the fire department 816-969-1300
Misc
Corrective Action Required
08/24/2015

912.2 Location. With respect to hydrants, driveways, buildings and landscaping, fire department connections shall be so located that fire apparatus and hose connected to supply the system will not obstruct access to the buildings for other fire apparatus. The location of fire department connections shall be approved by the fire chief. 912.2.1 Visible location. Fire department connections shall be located on the street side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire chief. Drawings did not show a FDC on the building. FDC shall be located within 100' of a hydrant.
Misc
Corrective Action Required
08/24/2015

[B] 1011.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1011.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1011.5. The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 12 inches (305 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. [B] 1011.5 Internally illuminated exit signs. Electrically powered, self-luminous and photoluminescent exit signs shall be listed and labeled in accordance with UL 924 and shall be installed in accordance with the manufacturer’s instructions and Chapter 27 of the International Building Code. Exit signs shall be illuminated at all times. Verified at inspection
Misc
Corrective Action Required
08/24/2015

D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. Fire apparatus access roadway shall meet the above conditions. Information purposes.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $19,855.00 $19,855.00 Paid 03/01/2016
Right of Way Permit Fee $75.00 $75.00 Paid 03/01/2016
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 03/01/2016
Water Tap Fee $21,427.00 $21,427.00 Paid 03/01/2016
Water Meter Fee $2,816.73 $2,816.73 Paid 03/01/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 4/5/2016 04/05/2016
Misc
Partial Correction
04/05/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Footing Inspection - Commercial Not Ready 4/7/2016 (10:00) 4/7/2016 04/07/2016
Misc
Partial Correction
04/05/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Corrective Action Required
04/07/2016
ELEVATOR PIT SLAB RE-BAR NOT READY FOR INSPECTION.
Footing Inspection - Commercial Failed 4/8/2016 (10:00) 4/8/2016 04/08/2016
Misc
Partial Correction
04/07/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Corrective Action Required
04/07/2016
ELEVATOR PIT SLAB RE-BAR: 3" CLEARANCE REQUIRED.
Footing Inspection - Commercial Partial 4/8/2016 (4:30) 4/8/2016 04/08/2016
Misc
Partial Correction
04/08/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Partial Correction
04/08/2016
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Partial 4/12/2016 04/12/2016
Misc
Partial Correction
04/12/2016
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING: 6" PVC MAIN BUILDING DRAIN TO OUTSIDE BUILDING LINE + 4" STUB-UPS; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Footing Inspection - Commercial Partial 4/12/2016 (3:00) 4/12/2016 04/12/2016
Misc
Partial Correction
04/08/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Partial Correction
04/08/2016
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Partial Correction
04/12/2016
OK TO POUR WHEN READY WALL FOOTINGS & INTEGRAL COLUMN FOOTINGS: FROM e/4.5 TO e/1 TO b/1 TO a/5 TO a/10 TO b/10 TO b/19 TO e/19 TO e/10.5; UFER GROUNDING JUMPER IS IN PLACE AT SOUTHEAST.
Footing Inspection - Commercial Partial 4/15/2016 04/15/2016
Misc
Partial Correction
04/15/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Partial Correction
04/15/2016
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Misc
Partial Correction
04/15/2016
OK TO POUR WHEN READY WALL FOOTINGS & INTEGRAL COLUMN FOOTINGS: FROM e/4.5 TO e/1 TO b/1 TO a/5 TO a/10 TO b/10 TO b/19 TO e/19 TO e/10.5; e/4.5 TO e/10.5 TO COMPLETE PERIMETER UFER GROUNDING JUMPER IS IN PLACE AT SOUTHEAST.
Electrical Service Inspection Passed 5/9/2016 5/9/2016 05/09/2016
Misc
Partial Correction
05/09/2016
400 AMP TEMPORARY SERVICE APPROVED
Foundation Inspection - Commercial Partial 5/13/2016 (1:00) 5/13/2016 05/13/2016
Misc
Partial Correction
05/13/2016
ELEVATOR PIT WALLS: ENSURE WATER STOP IS CLEAR AND CLEAN BEFORE POUR. NO ISSUES FOUND ON RE-BAR IN PLACE. OK TO POUR WHEN READY.
Underslab Electrical Inspection - Commercial Partial 5/17/2016 05/17/2016
Misc
Partial Correction
05/17/2016
OK TO COVER WHEN READY UNDER-SLAB ELECTRICAL CONDUIT & BOXES MATERIAL & WORKMANSHIP: FROM (10) TO WEST B/L; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT.
Underslab Plumbing Inspection - Commercial Partial 5/17/2016 05/17/2016
Misc
Partial Correction
04/12/2016
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING: 6" PVC MAIN BUILDING DRAIN TO OUTSIDE BUILDING LINE + 4" STUB-UPS; UPPER LIFT FROM (10) TO WEST B/L; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Footing Inspection - Commercial Partial 5/19/2016 (1:00) 5/19/2016 05/19/2016
Misc
Partial Correction
04/15/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Partial Correction
04/15/2016
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Misc
Partial Correction
04/15/2016
OK TO POUR WHEN READY WALL FOOTINGS & INTEGRAL COLUMN FOOTINGS: FROM e/4.5 TO e/1 TO b/1 TO a/5 TO a/10 TO b/10 TO b/19 TO e/19 TO e/10.5; e/4.5 TO e/10.5 TO COMPLETE PERIMETER UFER GROUNDING JUMPER IS IN PLACE AT SOUTHEAST.
Misc
Partial Correction
05/19/2016
ENSURE TOP OF PREVIOUSLY-POURED PERIMETER GRADE BEAM IS CLEANED PRIOR TO SLAB POUR. THEN OK TO POUR WHEN READY THICKENED SLAB FROM (10) TO WEST B/L; PULL RE-MESH TO MID-DEPTH OF SLAB AS POUR PROGRESSES.
Underslab Plumbing Inspection - Commercial Passed 5/20/2016 5/20/2016 05/20/2016
Misc
Resolved
05/20/2016
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING: 6" PVC MAIN BUILDING DRAIN TO OUTSIDE BUILDING LINE + 4" STUB-UPS; UPPER LIFT FROM (10) TO WEST B/L; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Footing Inspection - Commercial Partial 5/25/2016 (3:00) 5/25/2016 05/25/2016
Misc
Partial Correction
04/12/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Footing Inspection - Commercial Partial 5/25/2016 05/25/2016
Misc
Partial Correction
04/15/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Footing Inspection - Commercial Partial 5/25/2016 05/25/2016
Misc
Partial Correction
05/25/2016
OK TO POUR WHEN READY WALL FOOTINGS & INTEGRAL COLUMN FOOTINGS: FROM e/4.5 TO e/1 TO b/1 TO a/5 TO a/10 TO b/10 TO b/19 TO e/19 TO e/10.5; e/4.5 TO e/10.5 TO COMPLETE PERIMETER UFER GROUNDING JUMPER IS IN PLACE AT SOUTHEAST.
Misc
Partial Correction
05/25/2016
ENSURE TOP OF PREVIOUSLY-POURED PERIMETER GRADE BEAM IS CLEANED PRIOR TO SLAB POUR. THEN OK TO POUR WHEN READY THICKENED SLAB FROM (10) TO WEST B/L; OK TO POUR WHEN READY THICKENED SLAB FROM (10) TO EAST B/L; PULL RE-MESH TO MID-DEPTH OF SLAB AS POUR PROGRESSES.
Misc
Partial Correction
05/25/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Partial Correction
05/25/2016
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Pool Steel/Bonding - Commercial Partial 8/17/2016 8/17/2016 08/17/2016
Misc
Partial Correction
08/17/2016
OK TO COVER WHEN READY BONDING OF POOL ELEMENTS: LIGHT NICHE EXTERIOR LUG TO POOL SHELL RE-BAR;
All Rough Inspection - Commercial Partial 9/13/2016 9/13/2016 09/13/2016
Misc
Partial Correction
09/13/2016
OK TO COVER WHEN READY EXTERIOR WALL SHEAR SHEATHING: UP TO ELEVATION OF HEAD OF 2ND FLOOR WINDOWS;
Rough Framing Inspection - Commercial Not Ready 9/16/2016 09/16/2016
Misc
Corrective Action Required
09/16/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Rough Framing Inspection - Commercial Not Ready 9/20/2016 09/20/2016
Misc
Corrective Action Required
09/16/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Rough Framing Inspection - Commercial Partial 9/22/2016 9/22/2016 09/22/2016
Misc
Partial Correction
09/22/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER: FROM BOTTOM UP TO HEAD OF 2ND FLOOR WINDOWS; REMAINDER TO TOP AT NORTH ELEVATION, EAST ELEVATION; SOUTH ELEVATION EAST 40%;
Misc
Corrective Action Required
09/22/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Rough Framing Inspection - Commercial Partial 9/23/2016 09/23/2016
Misc
Partial Correction
09/22/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER ALL ELEVATIONS -- FULL HEIGHT.
Misc
Corrective Action Required
09/22/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Rough Electrical Inspection - Commercial Partial 9/27/2016 09/27/2016
Misc
Informational
09/27/2016
CONFERRED W/ JF TO ANSWER QUESTION FROM E.C.: GUEST ROOMS ARE NOT RESIDENSE UNITS; THEREFORE AFCI PROTECTION NOT REQUIRED.
Rough Framing Inspection - Commercial Partial 10/11/2016 10/11/2016
Misc
Partial Correction
09/23/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER ALL ELEVATIONS -- FULL HEIGHT.
Misc
Corrective Action Required
09/23/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Misc
Partial Correction
10/11/2016
FLOOR JOIST FRAMING ABOVE MAIN CORRIDORS @ 3RD FLOOR: OK TO COVER WHEN READY 2ND FLOOR: REPLACE SEVERAL CRACKED JOISTS 1ST FLOOR: REPLACE THREE CRACKED JOISTS
Rough Framing Inspection - Commercial Partial 10/12/2016 10/12/2016 10/12/2016
Misc
Partial Correction
10/11/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER ALL ELEVATIONS -- FULL HEIGHT.
Misc
Corrective Action Required
10/11/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Misc
Partial Correction
10/11/2016
FLOOR JOIST FRAMING ABOVE MAIN CORRIDORS @ 4TH FLOOR: NOT READY FOR INSPECTION -- WIP 3RD FLOOR: OK TO COVER WHEN READY 2ND FLOOR: OK TO COVER WHEN READY 1ST FLOOR: REPLACE ONE JOIST NOT FULL THICKNESS; THEN OK TO COVER WHEN READY
Rough Framing Inspection - Commercial Partial 10/18/2016 10/18/2016 10/18/2016
Misc
Partial Correction
10/12/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER ALL ELEVATIONS -- FULL HEIGHT.
Misc
Corrective Action Required
10/12/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Misc
Partial Correction
10/12/2016
FRAMING & WIRING ABOVE MAIN CORRIDORS @ 4TH FLOOR: OK TO COVER WHEN READY 3RD FLOOR: OK TO COVER WHEN READY 2ND FLOOR: OK TO COVER WHEN READY 1ST FLOOR: OK TO COVER WHEN READY
Footing Inspection - Commercial Partial 10/20/2016 (9:15) 10/20/2016 10/20/2016
Misc
Partial Correction
05/25/2016
OK TO POUR WHEN READY WALL FOOTINGS & INTEGRAL COLUMN FOOTINGS: FROM e/4.5 TO e/1 TO b/1 TO a/5 TO a/10 TO b/10 TO b/19 TO e/19 TO e/10.5; e/4.5 TO e/10.5 TO COMPLETE PERIMETER UFER GROUNDING JUMPER IS IN PLACE AT SOUTHEAST.
Misc
Partial Correction
05/25/2016
ENSURE TOP OF PREVIOUSLY-POURED PERIMETER GRADE BEAM IS CLEANED PRIOR TO SLAB POUR. THEN OK TO POUR WHEN READY THICKENED SLAB FROM (10) TO WEST B/L; OK TO POUR WHEN READY THICKENED SLAB FROM (10) TO EAST B/L; PULL RE-MESH TO MID-DEPTH OF SLAB AS POUR PROGRESSES.
Misc
Partial Correction
05/25/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Partial Correction
05/25/2016
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Misc
Partial Correction
10/20/2016
TRASH ENCLOSURE WALL FOOTING PREP NOT PER APPROVED DRAWING: 12" WIDE TRENCH WITH TWO #4 LONGITUDINAL BARS TIED TO #4 VERTICALS @ 12" O/C. IF POUR, AT RISK PENDING A/E APPROVAL OF REVISION.
Rough Framing Inspection - Commercial Partial 10/28/2016 10/28/2016
Misc
Partial Correction
10/18/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER ALL ELEVATIONS -- FULL HEIGHT.
Misc
Corrective Action Required
10/18/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Misc
Partial Correction
10/18/2016
FRAMING & WIRING ABOVE MAIN CORRIDORS @ 4TH FLOOR: OK TO COVER WHEN READY 3RD FLOOR: OK TO COVER WHEN READY 2ND FLOOR: OK TO COVER WHEN READY 1ST FLOOR: OK TO COVER WHEN READY
Rough Framing Inspection - Commercial Partial 10/31/2016 10/31/2016
Misc
Partial Correction
10/28/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER ALL ELEVATIONS -- FULL HEIGHT.
Misc
Corrective Action Required
10/28/2016
PRELIMINARY OBSERVATIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS AT FIRST FLOOR. SHEAR WALLS ARE INCOMPLETE AND ARE NOT READY FOR FULL INSPECTION AT FIRST FLOOR.
Misc
Partial Correction
10/28/2016
FRAMING & WIRING ABOVE MAIN CORRIDORS @ 4TH FLOOR: OK TO COVER WHEN READY 3RD FLOOR: OK TO COVER WHEN READY 2ND FLOOR: OK TO COVER WHEN READY 1ST FLOOR: OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 11/1/2016 11/1/2016 11/01/2016
Misc
Partial Correction
11/01/2016
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM L.P. #1 TO #2 TO #3; #1 TO #2 TO #3; #11 TO #4 TO #5;
Rough Framing Inspection - Commercial Partial 11/1/2016 11/01/2016
Misc
Partial Correction
10/31/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER ALL ELEVATIONS -- FULL HEIGHT.
Misc
Corrective Action Required
10/31/2016
INSPECTIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS. FASTENER PATTERN IS SUBSTANTIALLY IN CONFORMANCE WITH 4" x 12" MAXIMUM SPACING REQUIRED BY DRAWINGS / SPECIFICATIONS. SHEAR WALL CAVITIES NOT APPROVED TO BE CLOSED UNTIL ROUGH-IN INSPECTION IS REQUESTED AND APPROVED.
Misc
Partial Correction
10/31/2016
FRAMING & WIRING ABOVE MAIN CORRIDORS @ 4TH FLOOR: OK TO COVER WHEN READY 3RD FLOOR: OK TO COVER WHEN READY 2ND FLOOR: OK TO COVER WHEN READY 1ST FLOOR: OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 10/28/2016 11/2/2016 11/02/2016
Misc
Partial Correction
09/13/2016
OK TO COVER WHEN READY NORTH & SOUTH EXTERIOR WALLS AT UNITS ONLY AT 4TH, 3RD, AND 2ND FLOORS AFTER... - PATCH HOLE IN EXTERIOR SHEATHING AT 2ND FLOOR UNIT POINTED OUT - FIRE-BLOCK TEMP CONTROL BORES OF PLATES
Rough Electrical Inspection - Commercial Partial 11/3/2016 11/03/2016
Misc
Informational
09/27/2016
CONFERRED W/ JF TO ANSWER QUESTION FROM E.C.: GUEST ROOMS ARE NOT RESIDENSE UNITS; THEREFORE AFCI PROTECTION NOT REQUIRED.
Misc
Partial Correction
11/03/2016
ELECTRCIAL BOX & WIRING PRESENTLY ADDED AT NORTH/SOUTH EXTERIOR WALLS AT UNITS 414, 404, 324, 304, 224 OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 11/4/2016 11/4/2016 11/04/2016
Misc
Partial Correction
11/01/2016
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM L.P. #1 TO #2 TO #3; #1 TO #2 TO #3; #11 TO #4 TO #5; (A) TO #10 TO #1; (B) TO #9;
Rated Assembly Inspection Partial 11/9/2016 11/9/2016 11/09/2016
Misc
Partial Correction
11/09/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER;
Rated Assembly Inspection Partial 11/9/2016 11/09/2016
Misc
Partial Correction
11/09/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER;
Misc
Partial Correction
11/09/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: SPACE 316 WEST WALL ONE LAYER OK TO TAPE, MUD, AND FIRE-STOP;
Rated Assembly Inspection Partial 11/10/2016 11/10/2016
Misc
Partial Correction
11/09/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER;
Misc
Partial Correction
11/09/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: SPACE 316 WEST WALL ONE LAYER OK TO TAPE, MUD, AND FIRE-STOP;
All Rough Inspection - Commercial Failed 11/15/2016 11/15/2016 11/15/2016
Misc
Corrective Action Required
11/15/2016
4TH FLOOR WALLS AND CEILINGS: FIRE-BLOCK TOPS OF ALL CHASES / DEAD SPACES ELEVATOR SHAFT NOT READY FOR INSPECTION
All Rough Inspection - Commercial Partial 11/16/2016 11/16/2016
Misc
Partial Correction
11/16/2016
4TH FLOOR WALLS AND CEILINGS: OK TO COVER WHEN READY EXCEPT AT 404, 407, 410, 414, 427, AND 432 COMPLETE FIRE-BLOCK TOPS OF ALL CHASES / DEAD SPACES AS POINTED OUT TO CONTRACTOR PERSONNEL ON JOBSITE 11/16 ALSO, ELEVATOR SHAFT NOT READY FOR INSPECTION
All Rough Inspection - Commercial Partial 11/21/2016 11/21/2016
Misc
Partial Correction
11/16/2016
4TH FLOOR WALLS AND CEILINGS: OK TO COVER WHEN READY INCLUDING 404, 407, 410, 414, 427, AND 432 ELEVATOR SHAFT NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 11/21/2016 11/21/2016
Misc
Partial Correction
11/10/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER INCLUDING AT PVC PLUMBING PIPING AT WEST END;
Misc
Partial Correction
11/10/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Underground Electrical Inspection - Commercial Partial 11/23/2016 11/23/2016 11/23/2016
Misc
Partial Correction
11/04/2016
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM L.P. #1 TO #2 TO #3; #1 TO #2 TO #3; #11 TO #4 TO #5; (A) TO #10 TO #1; (B) TO #9;
Misc
Partial Correction
11/23/2016
2 BASES SW CORNER OF BUILDING. 2 AT NORTH END 1 A NW OF BUILDING APAPROVED
Rated Assembly Inspection Partial 11/29/2016 11/29/2016
Misc
Partial Correction
11/21/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER INCLUDING AT PVC PLUMBING PIPING AT WEST END;
Misc
Partial Correction
11/21/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
11/29/2016
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Rated Assembly Inspection Partial 11/30/2016 11/30/2016
Misc
Partial Correction
11/29/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER INCLUDING AT PVC PLUMBING PIPING AT WEST END;
Misc
Partial Correction
11/29/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
11/29/2016
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
All Rough Inspection - Commercial Partial 12/1/2016 12/1/2016 12/01/2016
Misc
Partial Correction
11/21/2016
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR AFTER SRINKLER PIPE IS PROTECTED WITH BOCA PLATES AT PENETRATIONS OF TOP WALL PLATES; ELEVATOR SHAFT AND STAIRWELLS NOT READY FOR INSPECTION
All Rough Inspection - Commercial Partial 12/5/2016 12/5/2016 12/05/2016
Misc
Partial Correction
12/01/2016
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR AFTER SRINKLER PIPE IS PROTECTED WITH BOCA PLATES AT PENETRATIONS OF TOP WALL PLATES; 116 E&S WALLS; ELEVATOR SHAFT AND STAIRWELLS NOT READY FOR INSPECTION
All Rough Inspection - Commercial Partial 12/6/2016 12/06/2016
Misc
Partial Correction
12/05/2016
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR AFTER TOPS OF PRE-ROCK AT BATHROOMS ARE SEALED; 116 E&S WALLS; ELEVATOR SHAFT AND STAIRWELLS NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 12/7/2016 12/07/2016
Misc
Partial Correction
11/30/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER INCLUDING AT PVC PLUMBING PIPING AT WEST END;
Misc
Partial Correction
11/30/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
11/30/2016
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
12/07/2016
OK TO COVER WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR;
All Rough Inspection - Commercial Partial 12/8/2016 12/08/2016
Misc
Partial Correction
12/06/2016
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; ELEVATOR SHAFT AND STAIRWELLS NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 12/8/2016 12/08/2016
Misc
Partial Correction
12/07/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER INCLUDING AT PVC PLUMBING PIPING AT WEST END;
Misc
Partial Correction
12/07/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
12/07/2016
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
12/07/2016
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116;
Footing Inspection - Commercial Passed 12/12/2016 12/12/2016 12/12/2016
Misc
Resolved
12/12/2016
OK TO POUR WHEN READY WALL FOOTINGS & INTEGRAL COLUMN FOOTINGS: FROM e/4.5 TO e/1 TO b/1 TO a/5 TO a/10 TO b/10 TO b/19 TO e/19 TO e/10.5; e/4.5 TO e/10.5 TO COMPLETE PERIMETER UFER GROUNDING JUMPER IS IN PLACE AT SOUTHEAST.
Misc
Resolved
12/12/2016
ENSURE TOP OF PREVIOUSLY-POURED PERIMETER GRADE BEAM IS CLEANED PRIOR TO SLAB POUR. THEN OK TO POUR WHEN READY THICKENED SLAB FROM (10) TO WEST B/L; OK TO POUR WHEN READY THICKENED SLAB FROM (10) TO EAST B/L; PULL RE-MESH TO MID-DEPTH OF SLAB AS POUR PROGRESSES.
Misc
Resolved
12/12/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS: FOUR TYPE F8; NINE TYPE F6A
Misc
Resolved
12/12/2016
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Misc
Resolved
12/12/2016
TRASH ENCLOSURE WALL FOOTING PREP NOT PER APPROVED DRAWING: 12" WIDE TRENCH WITH TWO #4 LONGITUDINAL BARS TIED TO #4 VERTICALS @ 12" O/C. IF POUR, AT RISK PENDING A/E APPROVAL OF REVISION.
All Rough Inspection - Commercial Partial 12/16/2016 12/16/2016 12/16/2016
Misc
Partial Correction
12/08/2016
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR EXCEPT 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT AND STAIRWELLS NOT READY FOR INSPECTION
All Rough Inspection - Commercial Partial 12/20/2016 12/20/2016 12/20/2016
Misc
Partial Correction
12/16/2016
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT AND STAIRWELLS NOT READY FOR INSPECTION
Rated Assembly Inspection Failed 12/27/2016 12/27/2016 12/27/2016
Misc
Partial Correction
12/08/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER INCLUDING AT PVC PLUMBING PIPING AT WEST END;
Misc
Partial Correction
12/08/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
12/08/2016
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
12/08/2016
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116;
Misc
Corrective Action Required
12/27/2016
RATED CEILING AT 3RD FLOOR: COMPLETE SCREWS AT LOCATIONS LISTED BY G.C.
Pool Steel/Bonding - Commercial Failed 12/27/2016 12/27/2016 12/27/2016
Misc
Partial Correction
08/17/2016
OK TO COVER WHEN READY BONDING OF POOL ELEMENTS: LIGHT NICHE EXTERIOR LUG TO POOL SHELL RE-BAR;
Misc
Corrective Action Required
12/27/2016
TERMINATE BONDING CONDUCTOR AT EVERY CAST-IN INSERT. BONDING LUGS NOT FOUND TO BE TIGHTENED AT RE-MISH
Rated Assembly Inspection Partial 12/28/2016 12/28/2016
Misc
Partial Correction
12/27/2016
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR;
Misc
Partial Correction
12/27/2016
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
12/27/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
12/27/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER INCLUDING AT PVC PLUMBING PIPING AT WEST END;
Misc
Corrective Action Required
12/27/2016
RATED CEILING AT 3RD FLOOR: COMPLETE SCREWS AT LOCATIONS LISTED BY G.C.
Rated Assembly Inspection Not Ready 12/29/2016 12/29/2016
Misc
Partial Correction
12/28/2016
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR;
Misc
Partial Correction
12/28/2016
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
12/28/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
12/28/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CORRIDOR CEILING ASSEMBLY AT: 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER INCLUDING AT PVC PLUMBING PIPING AT WEST END;
Misc
Corrective Action Required
12/28/2016
RATED CEILING AT 3RD FLOOR: COMPLETE SCREWS AT LOCATIONS LISTED BY G.C.
All Rough Inspection - Commercial Partial 1/4/2017 1/4/2017 01/04/2017
Misc
Partial Correction
12/20/2016
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114;
Rated Assembly Inspection Partial 1/4/2017 01/04/2017
Misc
Partial Correction
12/29/2016
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR;
Misc
Partial Correction
12/29/2016
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
12/29/2016
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
12/29/2016
OK TO COVER WHEN READY COMPONENTS OF RATED CEILING ASSEMBLY AT: CORRIDORS; 4TH FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 1/11/2017 1/11/2017 01/11/2017
Misc
Partial Correction
01/04/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR; 2ND FLOOR EXLUDING LAUNDRY, ELEVATOR LOBBY/BACK OF HOUSE, AND 228 BR; ELEVATOR SHAFT & STAIRWELLS NOR READY ALL FLOORS
Misc
Partial Correction
01/04/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
01/04/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
01/04/2017
OK TO COVER WHEN READY COMPONENTS OF RATED CEILING ASSEMBLY AT: CORRIDORS; 4TH FLOOR; 3RD FLOOR;
Gas Service Inspection - Commercial Not Ready 1/12/2017 01/12/2017
Misc
Corrective Action Required
01/12/2017
GAS SUPPLY PIPING DRAWING INCOMPLETE. NO GAS PIPING SHOWN TO SWIMMING POOL EQUIPMENT.
Above Ceiling Inspection Partial 11/29/2016 1/12/2017 01/12/2017
Misc
Partial Correction
01/12/2017
OK TO COVER WHEN READY SYSTEMS ABOVE LOWER GWB CEILINGS AT: 4TH FLOOR; 3RD FLOOR;
Above Ceiling Inspection Partial 1/23/2017 1/23/2017 01/23/2017
Misc
Partial Correction
01/12/2017
OK TO COVER WHEN READY SYSTEMS ABOVE LOWER CEILINGS AT: 4TH FLOOR; 3RD FLOOR;
Misc
Partial Correction
01/23/2017
OK FOR INSTALLATION OF RESILIENT FURRING AT: PORTIONS OF 1ST FLOOR; 3RD FLR, 2ND FLR, 1ST FLOOR LANDINGS IN STAIRWELLS;
Rated Assembly Inspection Not Ready 1/23/2017 1/23/2017 01/23/2017
Misc
Partial Correction
01/11/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR; 2ND FLOOR EXLUDING LAUNDRY, ELEVATOR LOBBY/BACK OF HOUSE, AND 228 BR; ELEVATOR SHAFT & STAIRWELLS NOR READY ALL FLOORS
Misc
Partial Correction
01/11/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
01/11/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: OK TO TAPE, MUD, AND FIRE-STOP ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
01/11/2017
OK TO COVER WHEN READY COMPONENTS OF RATED CEILING ASSEMBLY AT: CORRIDORS; 4TH FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 1/26/2017 1/24/2017 01/25/2017
Misc
Partial Correction
01/23/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR; 2ND FLOOR EXLUDING LAUNDRY, ELEVATOR LOBBY/BACK OF HOUSE, AND 228 BR;
Misc
Partial Correction
01/23/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
01/23/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
01/23/2017
OK TO COVER WHEN READY COMPONENTS OF RATED CEILING ASSEMBLY AT: CORRIDORS; 4TH FLOOR; 3RD FLOOR;
Misc
Partial Correction
01/25/2017
ELEVATOR SHAFT 1ST LAYER 5/8" TYPE X GWB AT LID 1ST LAYER 5/8" TYPE X GWB AT N,E,S WALLS
Misc
Partial Correction
01/25/2017
STAIRWELLS: 1ST LAYER AT WALLS
Rated Assembly Inspection Partial 1/26/2017 01/26/2017
Misc
Partial Correction
01/25/2017
OK TO COVER WHEN READY COMPONENTS OF RATED CEILING ASSEMBLY AT: CORRIDORS; 4TH FLOOR; 3RD FLOOR;
Misc
Partial Correction
01/25/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR; 2ND FLOOR EXLUDING LAUNDRY, ELEVATOR LOBBY/BACK OF HOUSE, AND 228 BR;
Misc
Partial Correction
01/25/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
01/25/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
01/25/2017
ELEVATOR SHAFT 2 LAYERA 5/8" TYPE X GWB AT LID 1ST LAYER 5/8" TYPE X GWB AT N,E,S WALLS
Misc
Partial Correction
01/25/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING AT LANDING CEILINGS
Rated Assembly Inspection Partial 1/30/2017 01/30/2017
Misc
Partial Correction
01/26/2017
OK TO COVER WHEN READY COMPONENTS OF RATED CEILING ASSEMBLY AT: CORRIDORS; 4TH FLOOR; 3RD FLOOR;
Misc
Partial Correction
01/26/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR INCLUDING ELECTRICAL ROOM & BACK OF HOUSE; 2ND FLOOR INCLUDING ELECTRICAL ROOM;
Misc
Partial Correction
01/26/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
01/26/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
01/26/2017
ELEVATOR SHAFT 3 LAYERS 5/8" TYPE X GWB AT LID 1ST LAYER 5/8" TYPE X GWB AT N,E,S WALLS
Misc
Partial Correction
01/26/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Above Ceiling Inspection Partial 1/24/2017 02/02/2017
Misc
Partial Correction
01/12/2017
OK TO COVER WHEN READY SYSTEMS ABOVE LOWER GWB CEILINGS AT: 4TH FLOOR; 3RD FLOOR;
Above Ceiling Inspection Partial 2/2/2017 02/02/2017
Misc
Partial Correction
02/02/2017
OK TO COVER WHEN READY SYSTEMS ABOVE LOWER GWB CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR EXCEPT ELEVATOR LOBBY AND BACK OF HOUSE;
All Rough Inspection - Commercial Partial 2/2/2017 02/02/2017
Misc
Partial Correction
01/04/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114;
Misc
Partial Correction
02/02/2017
OK TO COVER WHEN READY RESILIENT CHANNEL AT CEILINGS AND WALLS AT: CEILINGS ONLY AT 101 - 112, 116, 118, 127, 129, 131, 133, 152;
Rated Assembly Inspection Partial 1/30/2017 02/06/2017
Misc
Resolved
02/06/2017
OK TO COVER WHEN READY COMPONENTS OF RATED CEILING ASSEMBLY AT: CORRIDORS; 4TH FLOOR; 3RD FLOOR;
Misc
Partial Correction
01/30/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR ; 2ND FLOOR;
Misc
Partial Correction
01/30/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Misc
Partial Correction
01/30/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
01/30/2017
ELEVATOR SHAFT 3 LAYERS 5/8" TYPE X GWB AT LID 1ST LAYER 5/8" TYPE X GWB AT N,E,S WALLS
Misc
Partial Correction
01/30/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Rated Assembly Inspection Partial 1/30/2017 02/06/2017
Misc
Partial Correction
02/02/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 2ND FLOOR ELEVATOR + B/O HOUSE;
Misc
Partial Correction
02/02/2017
Rated Assembly Inspection Partial 2/6/2017 02/06/2017
Misc
Partial Correction
02/06/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
02/06/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS
Misc
Partial Correction
02/06/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Resolved
02/06/2017
OK TO COVER WHEN READY COMPONENTS OF RATED CEILING ASSEMBLY AT: CORRIDORS; 4TH FLOOR; 3RD FLOOR;
Misc
Partial Correction
02/06/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR INCLUDING ELECTRICAL ROOM & BACK OF HOUSE; 2ND FLOOR INCLUDING ELECTRICAL ROOM; CORRIDORS; 2ND FLOOR ELEVATOR LOBBY
Misc
Resolved
02/06/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432;
Foundation Inspection - Commercial Passed 5/13/2016 02/06/2017
Misc
Resolved
02/06/2017
ELEVATOR PIT WALLS: ENSURE WATER STOP IS CLEAR AND CLEAN BEFORE POUR. NO ISSUES FOUND ON RE-BAR IN PLACE. OK TO POUR WHEN READY.
Rough Electrical Inspection - Commercial Passed 11/3/2016 02/06/2017
Misc
Informational
11/03/2016
CONFERRED W/ JF TO ANSWER QUESTION FROM E.C.: GUEST ROOMS ARE NOT RESIDENSE UNITS; THEREFORE AFCI PROTECTION NOT REQUIRED.
Misc
Resolved
02/06/2017
ELECTRCIAL BOX & WIRING PRESENTLY ADDED AT NORTH/SOUTH EXTERIOR WALLS AT UNITS 414, 404, 324, 304, 224 OK TO COVER WHEN READY
Rough Framing Inspection - Commercial Passed 11/1/2016 02/06/2017
Misc
Resolved
02/06/2017
INSPECTIONS WITH FRAMING CONTRACTOR OF EXTERIOR SHEAR WALLS. OK TO COVER ALL ELEVATIONS -- FULL HEIGHT.
Misc
Resolved
02/06/2017
INSPECTIONS WITH FRAMING CONTRACTOR OF INTERIOR SHEAR WALLS. FASTENER PATTERN IS SUBSTANTIALLY IN CONFORMANCE WITH 4" x 12" MAXIMUM SPACING REQUIRED BY DRAWINGS / SPECIFICATIONS. SHEAR WALL CAVITIES NOT APPROVED TO BE CLOSED UNTIL ROUGH-IN INSPECTION IS REQUESTED AND APPROVED.
Misc
Resolved
02/06/2017
FRAMING & WIRING ABOVE MAIN CORRIDORS @ 4TH FLOOR: OK TO COVER WHEN READY 3RD FLOOR: OK TO COVER WHEN READY 2ND FLOOR: OK TO COVER WHEN READY 1ST FLOOR: OK TO COVER WHEN READY
Underslab Electrical Inspection - Commercial Passed 5/17/2016 02/06/2017
Misc
Partial Correction
05/17/2016
OK TO COVER WHEN READY UNDER-SLAB ELECTRICAL CONDUIT & BOXES MATERIAL & WORKMANSHIP: FROM (10) TO WEST B/L; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT.
Rough Electrical Inspection - Commercial Partial 2/8/2017 02/08/2017
Misc
Corrective Action Required
02/08/2017
SERVICE AND FEEDER CONDUCTORS ARE ALUMINUM VS. COPPER. IF APPROVED BY A/E, MUST SUBMIT BE SUBMITTED TO LS PLAN REVIEWER.
Rated Assembly Inspection Partial 2/8/2017 02/08/2017
Misc
Partial Correction
02/06/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
02/06/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED
Misc
Partial Correction
02/06/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
02/06/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR INCLUDING ELECTRICAL ROOM & BACK OF HOUSE; 2ND FLOOR INCLUDING ELECTRICAL ROOM; CORRIDORS; 2ND FLOOR ELEVATOR LOBBY
Pool Steel/Bonding - Commercial Passed 2/8/2017 02/08/2017
Misc
Resolved
02/08/2017
OK TO COVER WHEN READY BONDING OF POOL ELEMENTS: LIGHT NICHE EXTERIOR LUG TO POOL SHELL RE-BAR;
Misc
Resolved
02/08/2017
BONDING CONDUCTORS CONNECTED TO RE-MESH CAST-IN INSERTS
All Rough Inspection - Commercial Partial 2/8/2017 02/08/2017
Misc
Partial Correction
02/06/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114;
Misc
Partial Correction
02/06/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432; 3RD FLOOR; 2ND FLOOR; 101; 103; 105; 107; 109; 111; 112, 116, 118, 127, 129, 131, 133, 152;
Gas Service Inspection - Commercial Not Ready 2/8/2017 2/8/2017 02/08/2017
Misc
Corrective Action Required
01/12/2017
GAS SUPPLY PIPING DRAWINGS DO NOT REFLECT EQUIPMENT AND PIPING AS INSTALLED. DRAWING REVISIONS REQUIRED TO BE SUBMITTED TO LS PLAN REVIEW FOR APPROVA.
Misc
Partial Correction
02/08/2017
GAS PIPING PRESSURE TEST HELD STEADY AT >10 PSI FOR >10 MINUTES.
All Rough Inspection - Commercial Partial 2/10/2017 02/10/2017
Misc
Partial Correction
02/08/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114;
Misc
Partial Correction
02/08/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432; 3RD FLOOR; 2ND FLOOR; 101; 103; 105; 107; 109; 111; 112, 116, 118, 127, 129, 131, 133, 152;
Rated Assembly Inspection Partial 2/13/2017 02/13/2017
Misc
Partial Correction
02/08/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
02/08/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED
Misc
Partial Correction
02/08/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
02/08/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR INCLUDING ELECTRICAL ROOM & BACK OF HOUSE; 2ND FLOOR INCLUDING ELECTRICAL ROOM; CORRIDORS; 2ND FLOOR ELEVATOR LOBBY
Misc
Partial Correction
02/13/2017
LAUNDRY CHUTE -- OK TO COVER WHEN READY: 1ST LAYER 5/8" TYPE X GWB;
All Rough Inspection - Commercial Partial 2/13/2017 02/13/2017
Misc
Partial Correction
02/10/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 117 STOR W WALL; CONF W WALL; 106 & 150 W WALL;
Misc
Partial Correction
02/10/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432; 3RD FLOOR; 2ND FLOOR; 101; 103; 105; 107; 109; 111; 112, 116, 118, 127, 129, 131, 133, 152;
All Rough Inspection - Commercial Partial 2/14/2017 02/14/2017
Misc
Partial Correction
02/13/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 106 & 150 W WALL; CONF RM; 115; 117;
Misc
Partial Correction
02/13/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432; 3RD FLOOR; 2ND FLOOR; 101; 103; 105; 107; 109; 111; 112, 116, 118, 127, 129, 131, 133, 152;
All Rough Inspection - Commercial Partial 2/16/2017 02/16/2017
Misc
Partial Correction
02/14/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 106 & 150 W WALL; 115; 117; CONF RM; SWIMMING POOL - PARTIAL AT CENTER; PANTRY; KITCHEN; LINEN 119/MECH; 118; 116 N WALL;
Misc
Partial Correction
02/14/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432; 3RD FLOOR; 2ND FLOOR; 101; 103; 105; 107; 109; 111; 112, 116, 118, 127, 129, 131, 133, 152;
Underground Electrical Inspection - Commercial Partial 2/16/2017 02/16/2017
Misc
Partial Correction
11/23/2016
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM L.P. #1 TO #2 TO #3; #1 TO #2 TO #3; #11 TO #4 TO #5; (A) TO #10 TO #1; (B) TO #9; AROUND N ENTRANCE;
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS: 2 BASES SW CORNER OF BUILDING; 2 AT NORTH END; 1 AT NW OF BUILDING;
Rated Assembly Inspection Partial 2/16/2017 02/16/2017
Misc
Partial Correction
02/13/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
02/13/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED
Misc
Partial Correction
02/13/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
02/13/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 116; 3RD FLOOR INCLUDING ELECTRICAL ROOM & BACK OF HOUSE; 2ND FLOOR INCLUDING ELECTRICAL ROOM; CORRIDORS; 2ND FLOOR ELEVATOR LOBBY
Misc
Partial Correction
02/13/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: 1ST LAYER 5/8" TYPE X GWB;
Underground Electrical Inspection - Commercial Partial 2/22/2017 2/22/2017 02/22/2017
Misc
Partial Correction
02/16/2017
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM L.P. #1 TO #2 TO #3; #1 TO #2 TO #3; #11 TO #4 TO #5; (A) TO #10 TO #1; (B) TO #9; AROUND N ENTRANCE;
Misc
Partial Correction
02/16/2017
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS: 2 BASES SW CORNER OF BUILDING; 2 AT NORTH END; 1 AT NW OF BUILDING; PRINT L.P. MARKS #1 THRU #6;
All Rough Inspection - Commercial Partial 2/22/2017 02/22/2017
Misc
Partial Correction
02/16/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432; 3RD FLOOR; 2ND FLOOR; 1ST FLR: 101; 103; 105; 107; 109; 111; 112, 116, 118, 127, 129, 131, 133, 152; POOL E WALL; POOL CORRIDOR; PANTRY; KITCHEN; LINEN STOR / MECH; HOUSEKEEPING 118; CORRIDOR;
Misc
Partial Correction
02/16/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 106 & 150 W WALL; 115; 117; CONF RM; SWIMMING POOL - PARTIAL AT CENTER; PANTRY; KITCHEN; LINEN 119/MECH; 118; 116 N WALL;
All Rough Inspection - Commercial Partial 2/22/2017 02/22/2017
Misc
Partial Correction
02/22/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432; 3RD FLOOR; 2ND FLOOR; 1ST FLR: 101; 103; 105; 107; 109; 111; 112, 116, 118, 127, 129, 131, 133, 152; POOL E WALL; POOL CORRIDOR; PANTRY; KITCHEN; LINEN STOR / MECH; HOUSEKEEPING 118; CORRIDOR;
Misc
Partial Correction
02/22/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 106 & 150 W WALL; 115; 117; CONF RM; SWIMMING POOL - PARTIAL AT CENTER; PANTRY; KITCHEN; LINEN 119/MECH; 118; 116 N WALL; CHASES FIRE-BLOCKED AT SHOWERS IN 101; 103; 105; 107; 109; 111
Underground Electrical Inspection - Commercial Passed 2/23/2017 02/23/2017
Misc
Resolved
02/23/2017
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL AT FOLLOWING LOCATIONS: FROM L.P. #1 TO #2 TO #3; #1 TO #2 TO #3; #11 TO #4 TO #5; (A) TO #10 TO #1; (B) TO #9; AROUND N ENTRANCE;
Misc
Resolved
02/23/2017
OK TO POUR WHEN READY LIGHT POLE BASES AT FOLLOWING LOCATIONS: 2 BASES SW CORNER OF BUILDING; 2 AT NORTH END; 1 AT NW OF BUILDING; PRINT L.P. MARKS #1 THRU #6;
Rated Assembly Inspection Partial 2/27/2017 02/27/2017
Misc
Resolved
02/27/2017
OK TO COVER WHEN READY COMPONENTS OF RATED WALL ASSEMBLY AT: ONE LAYER 5/8" TYPE C GWB PRE-ROCK FOR ELECTRICAL PANELS AT SPACES 316; 216; ENSURE MAX 1/8" MARGINS AT ELECT BOX CUT-OUTS.
Misc
Partial Correction
02/16/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED
Misc
Partial Correction
02/16/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
02/16/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR INCLUDING ELECTRICAL ROOM & BACK OF HOUSE; 2ND FLOOR INCLUDING ELECTRICAL ROOM; CORRIDORS, ELEVATOR LOBBY; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER;
Misc
Partial Correction
02/16/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: 1ST LAYER 5/8" TYPE X GWB;
Rated Assembly Inspection Partial 3/2/2017 03/02/2017
Misc
Partial Correction
02/27/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED
Misc
Partial Correction
02/27/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
02/27/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER; MEETING ROOM; POOL (2ND LAYER AT W WALL);
Misc
Partial Correction
02/27/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: 1ST LAYER 5/8" TYPE X GWB;
Rated Assembly Inspection Partial 3/3/2017 03/03/2017
Misc
Partial Correction
03/02/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED
Misc
Partial Correction
03/02/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
03/02/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER; MEETING ROOM; POOL (2ND LAYER AT W WALL); {104; 111; 112; 116; 118; 119; 126; 127; 128; 129; 131; 133; 144; 145; 146; 152;
Misc
Partial Correction
03/02/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: 1ST LAYER 5/8" TYPE X GWB;
Above Ceiling Inspection Partial 3/9/2017 3/9/2017 03/09/2017
Misc
Partial Correction
02/02/2017
OK TO COVER WHEN READY SYSTEMS ABOVE LOWER GWB CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR EXCEPT ELEVATOR LOBBY AND BACK OF HOUSE;
Misc
Partial Correction
03/09/2017
LOBBY AND MEETING ROOMS 1ST FLOOR, CHANNEL INSTALLED 16" O.C. AND FIRECAULK PENETRATIONS APPROVED TO COVER.
Rated Assembly Inspection Partial 3/16/2017 3/16/2017 03/16/2017
Misc
Partial Correction
03/03/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED
Misc
Partial Correction
03/03/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
03/03/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER; MEETING ROOM; POOL (2ND LAYER AT W WALL); 104; 111; 112; 116; 118; 119; 126; 127; 128; 129; 131; 133; 144; 145; 146; 152; CEILINGS ONLY AT: 119/121/123/125; 122; 124; 110; 140; 142; 122 W WALL 1ST LAYER;
Misc
Partial Correction
03/03/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: INTERIOR 1ST LAYER 5/8" TYPE X GWB; EXTERIOR: INFILL AT DOOR OPENINGS AT 4TH & 3RD FLOORS; SOUTH WALL 1ST LAYER AT 4TH & 3RD FLOORS;
Above Ceiling Inspection Not Ready 3/22/2017 3/22/2017 03/22/2017
Misc
Partial Correction
03/09/2017
OK TO COVER WHEN READY SYSTEMS ABOVE LOWER GWB CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR EXCEPT ELEVATOR LOBBY AND BACK OF HOUSE;
Misc
Partial Correction
03/09/2017
LOBBY AND MEETING ROOMS 1ST FLOOR, CHANNEL INSTALLED 16" O.C. AND FIRECAULK PENETRATIONS APPROVED TO COVER.
Rated Assembly Inspection Partial 3/22/2017 3/22/2017 03/22/2017
Misc
Partial Correction
03/16/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
03/16/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER; MEETING ROOM; POOL (2ND LAYER AT W WALL); 104; 111; 112; 116; 118; 119; 126; 127; 128; 129; 131; 133; 144; 145; 146; 152; CEILINGS ONLY AT: 119/121/123/125; 122; 124; 110; 140; 142; 122 W WALL 1ST LAYER;
Misc
Partial Correction
03/16/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: INTERIOR 1ST LAYER 5/8" TYPE X GWB; EXTERIOR: INFILL AT DOOR OPENINGS AT 4TH & 3RD FLOORS; SOUTH WALL 1ST LAYER AT 4TH & 3RD FLOORS;
Misc
Partial Correction
03/16/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED 1st FLOOR SOUTH SIDE ELEVATOR SHAFT 2ND LAYER APPROVED
Rated Assembly Inspection Partial 3/23/2017 03/23/2017
Misc
Partial Correction
03/22/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
03/22/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER; MEETING ROOM; POOL (2ND LAYER AT W WALL); 104; 111; 112; 116; 118; 119; 126; 127; 128; 129; 131; 133; 144; 145; 146; 152; CEILINGS ONLY AT: 119/121/123/125; 122; 124; 110; 140; 142; 122 W WALL 1ST LAYER;
Misc
Partial Correction
03/22/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: INTERIOR 1ST LAYER 5/8" TYPE X GWB; EXTERIOR: INFILL AT DOOR OPENINGS AT 4TH & 3RD FLOORS; SOUTH WALL 1ST LAYER AT 4TH & 3RD FLOORS;
Misc
Partial Correction
03/22/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED 1st FLOOR SOUTH SIDE ELEVATOR SHAFT 2ND LAYER APPROVED
Misc
Partial Correction
03/23/2017
1ST FLOOR CEILING PENETRATIONS FIRE-STOPPED PRE-GRID AT: LAUNDRY ROOM NORTH; COMMONS SPACE & EAST CORRIDOR;
Above Ceiling Inspection Partial 3/23/2017 3/23/2017 03/23/2017
Misc
Partial Correction
03/23/2017
OK TO COVER WHEN READY SYSTEMS ABOVE LOWER GWB CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR EXCEPT ELEVATOR LOBBY AND BACK OF HOUSE;
Misc
Partial Correction
03/23/2017
LOBBY AND MEETING ROOMS 1ST FLOOR, CHANNEL INSTALLED 16" O.C. AND FIRECAULK PENETRATIONS APPROVED TO COVER.
Misc
Partial Correction
03/23/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SWIMMING POOL;
Rated Assembly Inspection Partial 4/4/2017 04/04/2017
Misc
Partial Correction
03/23/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
03/23/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER; MEETING ROOM; POOL (2ND LAYER AT W WALL); 104; 111; 112; 116; 118; 119; 126; 127; 128; 129; 131; 133; 144; 145; 146; 152; CEILINGS ONLY AT: 119/121/123/125; 122; 124; 110; 140; 142; 122 W WALL 1ST LAYER;
Misc
Partial Correction
03/23/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: INTERIOR 1ST LAYER 5/8" TYPE X GWB; EXTERIOR: INFILL AT DOOR OPENINGS AT 4TH & 3RD FLOORS; SOUTH WALL 1ST LAYER AT 4TH & 3RD FLOORS; 2ND FLOOR SOUTH FACE 2 LAYERS
Misc
Partial Correction
03/23/2017
ELEVATOR SHAFT 4 LAYERS (W/ REILIENT CHANNEL) 5/8" TYPE X GWB AT LID TWO LAYERS 5/8" TYPE X GWB AT N,E,S WALLS COMPLETE, TAPED, AND MUDDED 1st FLOOR SOUTH SIDE ELEVATOR SHAFT 2ND LAYER APPROVED 1ST FLOOR LOBBY FACE 2ND LAYER
Misc
Partial Correction
03/23/2017
1ST FLOOR CEILING PENETRATIONS FIRE-STOPPED PRE-GRID AT: LAUNDRY ROOM NORTH; COMMONS SPACE & EAST CORRIDOR;
Above Ceiling Inspection Partial 4/5/2017 4/5/2017 04/05/2017
Misc
Resolved
04/05/2017
OK TO COVER WHEN READY SYSTEMS ABOVE LOWER GWB CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR EXCEPT ELEVATOR LOBBY AND BACK OF HOUSE;
Misc
Resolved
04/05/2017
LOBBY AND MEETING ROOMS 1ST FLOOR, CHANNEL INSTALLED 16" O.C. AND FIRECAULK PENETRATIONS APPROVED TO COVER.
Misc
Partial Correction
04/05/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1ST FLOOR: MEETING ROOM PERIMETER & CLOSETS
Misc
Corrective Action Required
04/05/2017
ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS: 4TH FLOOR CORRIDOR: FIRE-STOP ALL PENETRATIONS OF WALLS AND CEILING
Above Ceiling Inspection Partial 4/6/2017 04/06/2017
Misc
Partial Correction
04/05/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1ST FLOOR: MEETING ROOM PERIMETER & CLOSETS
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR;
Above Ceiling Inspection Partial 4/11/2017 4/11/2017 04/11/2017
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1ST FLOOR: MEETING ROOM PERIMETER & CLOSETS; MDP ROOM; NORTH ENTRANCE VESTIBULE; THREE DROPPED CEILING AREAS AT 1ST FLR CORRIDOR WEST;
Misc
Partial Correction
04/06/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 4/11/2017 04/11/2017
Misc
Partial Correction
04/04/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Partial Correction
04/04/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER; MEETING ROOM; POOL (2ND LAYER AT W WALL); 104; 111; 112; 116; 118; 119; 126; 127; 128; 129; 131; 133; 144; 145; 146; 152; CEILINGS ONLY AT: 119/121/123/125; 122; 124; 110; 140; 142; 122 W WALL 1ST LAYER;
Misc
Partial Correction
04/04/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: INTERIOR 1ST LAYER 5/8" TYPE X GWB; EXTERIOR: INFILL AT DOOR OPENINGS AT 4TH & 3RD FLOORS; SOUTH WALL 1ST LAYER AT 4TH & 3RD FLOORS;
Misc
Partial Correction
04/04/2017
ELEVATOR SHAFT -- OK TO COVER: LOBBY FACE: 1ST FLOOR 2ND LAYER; 3RD FLR 1ST LAYER; 4TH FLR 1ST LAYER;
Misc
Partial Correction
04/04/2017
1ST FLOOR CEILING PENETRATIONS FIRE-STOPPED PRE-GRID AT: LAUNDRY ROOM NORTH; COMMONS SPACE & EAST CORRIDOR;
Miscellaneous Inspection Partial 4/11/2017 04/11/2017
Misc
Partial Correction
04/11/2017
ELECTRICAL RECEPTACES TESTED AND OK FOR SETTING OF BUILT-IN FURNITURE/FIXTURES AT: 4TH FLOOR UNITS; 3RD FLOOR SOUTH SIDE UNITS;
Miscellaneous Inspection Partial 4/12/2017 04/12/2017
Misc
Partial Correction
04/11/2017
ELECTRICAL RECEPTACES TESTED AND OK FOR SETTING OF BUILT-IN FURNITURE/FIXTURES AT: 4TH FLOOR UNITS; 3RD FLOOR UNITS;
All Rough Inspection - Commercial Partial 4/5/2017 4/12/2017 04/12/2017
Misc
Resolved
04/12/2017
RESILIENT CHANNEL PER UL U522 OK TO COVER WHEN READY AT WALLS AND CEILINGS AT: 4TH FLOOR EXCEPT AT STAIRWELLS AND ROOMS 430 AND 432; 3RD FLOOR; 2ND FLOOR; 1ST FLR: 101; 103; 105; 107; 109; 111; 112, 116, 118, 127, 129, 131, 133, 152; POOL E WALL; POOL CORRIDOR; PANTRY; KITCHEN; LINEN STOR / MECH; HOUSEKEEPING 118; CORRIDOR;
Misc
Partial Correction
02/22/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 106 & 150 W WALL; 115; 117; CONF RM; SWIMMING POOL - PARTIAL AT CENTER; PANTRY; KITCHEN; LINEN 119/MECH; 118; 116 N WALL; CHASES FIRE-BLOCKED AT SHOWERS IN 101; 103; 105; 107; 109; 111; NO ISSUES FOUND AT 1ST FLR CORRIDOR -- OK FOR CEILING GRID & COMPLETION OF ABOVE-CEILING WORK
Rated Assembly Inspection Partial 4/12/2017 04/12/2017
Misc
Resolved
04/12/2017
OK TO COVER AT STAIRWELLS: 2 LAYERS 5/8" TYPE X GWB AT WALLS BOTH STAIRWELLS; RESILIENT FURRING + 5/8" TYPE X GWB AT LANDING CEILINGS
Misc
Resolved
04/12/2017
OK TO TAPE, MUD, AND FIRE-STOP WHEN READY RATED WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 116; 101; 103; 105; 107; 109; 111; 113; 106 W WALL 1ST LAYER; MEETING ROOM; POOL (2ND LAYER AT W WALL); 104; 111; 112; 116; 118; 119; 126; 127; 128; 129; 131; 133; 144; 145; 146; 152; CEILINGS ONLY AT: 119/121/123/125; 122; 124; 110; 140; 142; 122 W WALL 1ST LAYER;
Misc
Partial Correction
04/04/2017
LAUNDRY CHUTE: OK TO COVER WHEN READY: INTERIOR 1ST LAYER 5/8" TYPE X GWB; EXTERIOR: INFILL AT DOOR OPENINGS AT 4TH & 3RD FLOORS; SOUTH WALL 1ST LAYER AT 4TH & 3RD FLOORS; 2ND FLOOR SOUTH FACE 2 LAYERS
Misc
Partial Correction
04/04/2017
ELEVATOR SHAFT 1st FLOOR SOUTH SIDE ELEVATOR SHAFT 2ND LAYER APPROVED 1ST FLOOR LOBBY FACE 2ND LAYER 2ND FLOOR LOBBY WALL FRAMING + LINER BOARD (NEEDS FIRE-STOPPING)
Misc
Partial Correction
04/04/2017
1ST FLOOR CEILING PENETRATIONS FIRE-STOPPED PRE-GRID AT: LAUNDRY ROOM NORTH; COMMONS SPACE & EAST CORRIDOR;
Above Ceiling Inspection Partial 4/17/2017 4/17/2017 04/17/2017
Misc
Partial Correction
04/11/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1ST FLOOR: MEETING ROOM PERIMETER & CLOSETS; MDP ROOM; NORTH ENTRANCE VESTIBULE; THREE DROPPED CEILING AREAS AT 1ST FLR CORRIDOR WEST; 8'-6" HORIZONTAL CHASE/CEILING AT 121/123/124/125 EAST;
Misc
Partial Correction
04/11/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Miscellaneous Inspection Partial 4/18/2017 04/18/2017
Misc
Partial Correction
04/12/2017
ELECTRICAL RECEPTACES TESTED AND OK FOR SETTING OF BUILT-IN FURNITURE/FIXTURES AT: 4TH FLOOR UNITS; 3RD FLOOR UNITS; 2ND FLOOR UNITS;
Above Ceiling Inspection Partial 4/18/2017 04/18/2017
Misc
Partial Correction
04/17/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1ST FLOOR: MEETING ROOM PERIMETER & CLOSETS; MDP ROOM; NORTH ENTRANCE VESTIBULE; THREE DROPPED CEILING AREAS AT 1ST FLR CORRIDOR WEST; 8'-6" HORIZONTAL CHASE/CEILING AT 121/123/124/125 EAST;
Misc
Partial Correction
04/17/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Misc
Partial Correction
04/18/2017
OK TO COVER WHEN READY FRAMING AND ABOVE-CEILING ELECTRICAL AT UNDERSIDE OF NORTH ENTRANCE CANOPY
Rated Assembly Inspection Partial 4/21/2017 4/21/2017 04/21/2017
Misc
Partial Correction
04/12/2017
ABOVE-CEILING SYSTEMS AND RATED ASSEMBLY AT LAUNDRY CHUTE ROOMS OK TO COVER WHEN READY AT: 4TH FLOOR; 2ND FLOOR;
Misc
Resolved
04/21/2017
ELEVATOR SHAFT 1st FLOOR SOUTH SIDE ELEVATOR SHAFT 2ND LAYER APPROVED 1ST FLOOR LOBBY FACE 2ND LAYER 2ND FLOOR LOBBY WALL FRAMING + LINER BOARD (NEEDS FIRE-STOPPING)
Misc
Resolved
04/21/2017
1ST FLOOR CEILING PENETRATIONS FIRE-STOPPED PRE-GRID AT: LAUNDRY ROOM NORTH; COMMONS SPACE & EAST CORRIDOR;
Above Ceiling Inspection Partial 4/21/2017 4/21/2017 04/21/2017
Misc
Resolved
04/21/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1ST FLOOR: MEETING ROOM PERIMETER & CLOSETS; MDP ROOM; NORTH ENTRANCE VESTIBULE; THREE DROPPED CEILING AREAS AT 1ST FLR CORRIDOR WEST; 8'-6" HORIZONTAL CHASE/CEILING AT 121/123/124/125 EAST;
Misc
Partial Correction
04/18/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Misc
Resolved
04/21/2017
OK TO COVER WHEN READY FRAMING AND ABOVE-CEILING ELECTRICAL AT UNDERSIDE OF NORTH ENTRANCE CANOPY
Misc
Partial Correction
04/21/2017
OK TO COVER WHEN READY ACT CEILING FRAMING 7 ABOVE-CEILING SYSTEMS AT: ELECTRICAL ROOMS AT 3RD FLR & 2ND FLR; ELEVATOR LOBBY + BACK OF HOUSE AT 4TH FLR; 3RD FLR; 2ND FLR
Rated Assembly Inspection Partial 4/21/2017 04/21/2017
Misc
Partial Correction
04/21/2017
ABOVE-CEILING SYSTEMS AND RATED ASSEMBLY AT LAUNDRY CHUTE ROOMS OK TO COVER WHEN READY AT: 4TH FLOOR; 2ND FLOOR;
Misc
Partial Correction
04/21/2017
WALLS AND CEILING AT MDP ROOM OK TO TAPE, MUD AND FIRE-STOP
All Rough Inspection - Commercial Partial 4/25/2017 04/25/2017
Misc
Partial Correction
04/12/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 106 & 150 W WALL; 115; 117; CONF RM; SWIMMING POOL - PARTIAL AT CENTER; PANTRY; KITCHEN; LINEN 119/MECH; 118; 116 N WALL; CHASES FIRE-BLOCKED AT SHOWERS IN 101; 103; 105; 107; 109; 111; NO ISSUES FOUND AT 1ST FLR CORRIDOR -- OK FOR CEILING GRID & COMPLETION OF ABOVE-CEILING WORK; COLUMN WRAPS AND WEST/SW SOFFITS AT LOBBY; ABOVE-CEILING AT RR'S 116 & 118;
Gas Service Inspection - Commercial Passed 4/28/2017 04/28/2017
Misc
Resolved
04/28/2017
GAS SUPPLY PIPING DRAWINGS DO NOT REFLECT EQUIPMENT AND PIPING AS INSTALLED. DRAWING REVISIONS REQUIRED TO BE SUBMITTED TO LS PLAN REVIEW FOR APPROVA.
Misc
Resolved
04/28/2017
GAS PIPING PRESSURE TEST HELD STEADY AT >10 PSI FOR >10 MINUTES.
Gas Piping Inspection - Commercial Passed 4/28/2017 04/28/2017
Above Ceiling Inspection Partial 5/1/2017 5/1/2017 05/01/2017
Misc
Partial Correction
04/21/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Misc
Resolved
05/01/2017
OK TO COVER WHEN READY ACT CEILING FRAMING 7 ABOVE-CEILING SYSTEMS AT: ELECTRICAL ROOMS AT 3RD FLR & 2ND FLR; ELEVATOR LOBBY + BACK OF HOUSE AT 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Partial Correction
05/01/2017
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT 1ST FLOOR SPACES: MEETING [113];
All Rough Inspection - Commercial Partial 5/1/2017 05/01/2017
Misc
Partial Correction
04/25/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 106 & 150 W WALL; 115; 117; CONF RM; SWIMMING POOL - PARTIAL AT CENTER; PANTRY; KITCHEN; LINEN 119/MECH; 118; 116 N WALL; CHASES FIRE-BLOCKED AT SHOWERS IN 101; 103; 105; 107; 109; 111; NO ISSUES FOUND AT 1ST FLR CORRIDOR -- OK FOR CEILING GRID & COMPLETION OF ABOVE-CEILING WORK; COLUMN WRAPS AND WEST/SW SOFFITS AT LOBBY; ABOVE-CEILING AT RR'S 116 & 118; FIVE COLUMN WRAPS AT NORTH ENTRANCE CANOPY;
Above Ceiling Inspection Not Ready 5/3/2017 5/3/2017 05/03/2017
Misc
Partial Correction
05/01/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Misc
Partial Correction
05/01/2017
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT 1ST FLOOR SPACES: MEETING [113];
Pool Steel/Bonding - Commercial Passed 5/4/2017 5/4/2017 05/04/2017
Above Ceiling Inspection Partial 5/12/2017 5/12/2017 05/12/2017
Misc
Partial Correction
05/03/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR: 140; 154;
Misc
Partial Correction
05/03/2017
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT 1ST FLOOR SPACES: MEETING [113];
Above Ceiling Inspection Partial 5/15/2017 05/15/2017
Misc
Partial Correction
05/12/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR: LAUN CHUTE 233 1ST FLOOR: 140; 154;[112; 121/123/124; 137; 142; 122; 126; 127; 129; 131 - 134; 139;
Misc
Partial Correction
05/12/2017
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT 1ST FLOOR SPACES: MEETING [113];
All Rough Inspection - Commercial Passed 5/1/2017 05/15/2017
Misc
Resolved
05/15/2017
OK TO COVER WHEN READY WALLS AND CEILINGS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR INCLUDING 228; 230; 232; AND GUEST LAUNDRY @ ELEVATOR B/O HOUSE; ELEVATOR SHAFT; BOTH STAIRWELLS; TELECOM 114; 111 LAUN W WALL; 119 W WALL; 128 PANTRY W WALL; 106 & 150 W WALL; 115; 117; CONF RM; SWIMMING POOL - PARTIAL AT CENTER; PANTRY; KITCHEN; LINEN 119/MECH; 118; 116 N WALL; CHASES FIRE-BLOCKED AT SHOWERS IN 101; 103; 105; 107; 109; 111; NO ISSUES FOUND AT 1ST FLR CORRIDOR -- OK FOR CEILING GRID & COMPLETION OF ABOVE-CEILING WORK; COLUMN WRAPS AND WEST/SW SOFFITS AT LOBBY; ABOVE-CEILING AT RR'S 116 & 118; FIVE COLUMN WRAPS AT NORTH ENTRANCE CANOPY;
Rated Assembly Inspection Passed 4/21/2017 05/15/2017
Misc
Resolved
05/15/2017
ABOVE-CEILING SYSTEMS AND RATED ASSEMBLY AT LAUNDRY CHUTE ROOMS OK TO COVER WHEN READY AT: 4TH FLOOR; 2ND FLOOR;
Misc
Resolved
05/15/2017
WALLS AND CEILING AT MDP ROOM OK TO TAPE, MUD AND FIRE-STOP
Rough Electrical Inspection - Commercial Passed 2/8/2017 05/15/2017
Misc
Resolved
05/15/2017
SERVICE AND FEEDER CONDUCTORS ARE ALUMINUM VS. COPPER. IF APPROVED BY A/E, MUST SUBMIT BE SUBMITTED TO LS PLAN REVIEWER.
Above Ceiling Inspection Partial 5/16/2017 05/16/2017
Misc
Partial Correction
05/15/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR: LAUN CHUTE 233 1ST FLOOR: 112; 121/123/124; 122; 142; 126; 127; 128; 129; 131 - 134; 137; 139; 140; 154;
Misc
Partial Correction
05/15/2017
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT 1ST FLOOR SPACES: MEETING [113];
Sprinkler - Hydrostatic Test Passed 5/25/2017 05/25/2017
Alarm Test Passed 5/31/2017 05/31/2017
Sprinkler - Flow Test Passed 5/31/2017 05/31/2017
Occupancy Inspection - Planning Temporary C of O 6/5/2017 06/05/2017
Corrective Action Required
06/05/2017
Install the R7-8 handicapped accessible parking signs.
Corrective Action Required
06/05/2017
Finish striping 3 missing spaces on south side of building.
Corrective Action Required
06/05/2017
Provide documentation of lighting changes per our discussion on site June 5, 2017.
Occupancy Inspection - Fire Temporary C of O 6/5/2017 06/05/2017
Occupancy Inspection - Codes Commercial Failed 6/5/2017 6/5/2017 06/05/2017
Misc
Corrective Action Required
06/05/2017
RESOLVE ANY PUBLIC WORKS ISSUES
Misc
Corrective Action Required
06/05/2017
RESOLVE PLANNING ISSUES
Misc
Corrective Action Required
06/05/2017
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
06/05/2017
INSTALL SAFETY POST AT LADDER TO ROOF
Occupancy Inspection - Codes Commercial Temporary C of O 6/6/2017 06/06/2017
Misc
Corrective Action Required
06/05/2017
RESOLVE ANY PUBLIC WORKS ISSUES
Misc
Corrective Action Required
06/05/2017
RESOLVE PLANNING ISSUES
Misc
Corrective Action Required
06/05/2017
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Resolved
06/06/2017
INSTALL SAFETY POST AT LADDER TO ROOF
Occupancy Inspection - Codes Commercial Temporary C of O 6/6/2017 06/06/2017
Misc
Corrective Action Required
06/06/2017
RESOLVE ANY PUBLIC WORKS ISSUES
Misc
Corrective Action Required
06/06/2017
RESOLVE PLANNING ISSUES
Misc
Corrective Action Required
06/06/2017
RESOLVE FIRE DEPARTMENT ISSUES
Occupancy Inspection - Fire Passed 6/14/2017 06/14/2017
Occupancy Inspection - Planning Passed 6/21/2017 06/21/2017
Miscellaneous Inspection Passed 5/24/2017 6/1/2017 06/21/2017
Above Ceiling Inspection Passed 5/16/2017 06/21/2017
Misc
Resolved
06/21/2017
OK TO COVER WHEN READY CORRIDOR ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR: LAUN CHUTE 233 1ST FLOOR: 112; 121/123/124; 122; 142; 126; 127; 128; 129; 131 - 134; 137; 139; 140; 154;
Misc
Resolved
06/21/2017
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT 1ST FLOOR SPACES: MEETING [113];
Occupancy Inspection - Codes Commercial Temporary C of O 6/22/2017 06/22/2017
Misc
Corrective Action Required
06/06/2017
RESOLVE ANY PUBLIC WORKS ISSUES
Misc
Resolved
06/22/2017
RESOLVE PLANNING ISSUES
Misc
Resolved
06/22/2017
RESOLVE FIRE DEPARTMENT ISSUES
Occupancy Inspection - Water Utilities Passed 07/19/2017
Occupancy Inspection - Codes Commercial Temporary C of O 10/6/2017 10/06/2017
Misc
Corrective Action Required
06/22/2017
RESOLVE ANY PUBLIC WORKS ISSUES
Occupancy Inspection - Codes Commercial Full C of O 12/4/2017 at 10:30 AM 12/04/2017
Misc
Resolved
12/04/2017
RESOLVE ANY PUBLIC WORKS ISSUES
Documents & Images
Date Uploaded File Type Document Name
08/24/2015 Letter Fire Building Plan Review
08/28/2015 Letter Codes P/R Corrections Document
11/10/2015 Letter Fire Building Plan Review
11/11/2015 Letter Codes P/R Corrections Document
11/25/2015 Letter Fire Building Plan Review
01/28/2016 Holiday Inn Express SI Letter of Intent
03/01/2016 Receipt Receipt for transaction: 2016-000564
03/01/2016 Letter Codes Building Permit
03/01/2016 Letter Codes Plan Review Conditions
04/05/2016 Letter Inspection Summary
04/08/2016 Letter Inspection Summary
04/12/2016 Letter Inspection Summary
04/12/2016 Letter Inspection Summary
04/15/2016 Letter Inspection Summary
05/09/2016 Letter Inspection Summary
05/13/2016 Letter Inspection Summary
05/17/2016 Letter Inspection Summary
05/19/2016 Letter Inspection Summary
05/20/2016 Letter Inspection Summary
05/25/2016 Letter Inspection Summary
08/17/2016 Letter Inspection Summary
09/13/2016 Letter Inspection Summary
09/16/2016 Letter Fire (Alarm) Plan Review Notice
09/16/2016 Letter Inspection Summary
09/23/2016 Letter Inspection Summary
10/11/2016 Letter Inspection Summary
10/12/2016 Letter Inspection Summary
10/18/2016 Letter Inspection Summary
10/20/2016 Letter Inspection Summary
11/01/2016 Letter Inspection Summary
11/02/2016 Letter Inspection Summary
11/03/2016 Letter Inspection Summary
11/04/2016 Letter Inspection Summary
11/08/2016 UL 534
11/09/2016 Letter Inspection Summary
11/10/2016 Letter Inspection Summary
11/15/2016 Letter Inspection Summary
11/16/2016 Letter Inspection Summary
11/21/2016 Letter Inspection Summary
11/23/2016 Letter Inspection Summary
11/29/2016 Letter Inspection Summary
12/01/2016 Letter Inspection Summary
12/05/2016 Letter Inspection Summary
12/06/2016 Letter Inspection Summary
12/07/2016 Letter Inspection Summary
12/08/2016 Letter Inspection Summary
12/12/2016 Letter Inspection Summary
12/16/2016 Letter Inspection Summary
12/20/2016 Letter Inspection Summary
12/27/2016 Letter Inspection Summary
12/28/2016 Letter Inspection Summary
01/04/2017 Letter Inspection Summary
01/11/2017 Letter Inspection Summary
01/12/2017 Letter Inspection Summary
01/26/2017 Letter Inspection Summary
01/30/2017 Letter Inspection Summary
02/02/2017 Letter Inspection Summary
02/08/2017 Letter Inspection Summary
02/14/2017 Letter Inspection Summary
02/16/2017 Letter Inspection Summary
02/22/2017 Letter Inspection Summary
02/23/2017 Letter Inspection Summary
02/27/2017 Letter Inspection Summary
03/02/2017 Letter Inspection Summary
03/03/2017 Letter Inspection Summary
03/09/2017 Letter Inspection Summary
03/16/2017 Letter Inspection Summary
03/22/2017 Letter Inspection Summary
03/22/2017 Letter Inspection Summary
03/23/2017 Letter Inspection Summary
04/04/2017 Letter Inspection Summary
04/05/2017 Letter Inspection Summary
04/06/2017 Letter Inspection Summary
04/11/2017 Letter Inspection Summary
04/12/2017 Letter Inspection Summary
04/17/2017 Letter Inspection Summary
04/18/2017 Letter Inspection Summary
04/21/2017 Letter Inspection Summary
04/25/2017 Letter Inspection Summary
04/25/2017 Letter Inspection Summary
04/28/2017 Letter Inspection Summary
05/01/2017 Letter Inspection Summary
05/04/2017 Letter Inspection Summary
05/12/2017 Letter Inspection Summary
05/15/2017 Letter Inspection Summary
05/16/2017 Letter Inspection Summary
06/05/2017 Letter Planning Inspection Summary
06/05/2017 Letter Inspection Summary
06/06/2017 Letter Codes Temporary Certificate of Occupancy
06/21/2017 Letter Planning Inspection Summary
06/22/2017 Letter Codes Temporary Certificate of Occupancy
10/06/2017 Letter Codes Temporary Certificate of Occupancy
11/30/2017 Letter Codes 10 Day Letter
12/04/2017 Letter Field Certificate of Occupancy
12/05/2017 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home