Review Type |
Outcome |
Est. Completion Date |
Completed |
Sprinkler Plan Review
|
Released for Construction
|
|
11/25/2015
|
|
Joe Dir
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
FIELD TESTING REQUIRED FOR THE NEW INSTALLATION. TOSCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300. INFORMATION PURPOSES
|
|
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed.
THE ORIGINAL SPRINKLER SYSTEM SHALL BE CURRENT ON THE ANNUAL SERVICE. CURRENT SWERVICE TAG TO BE LOCATED ON THE RISER. VERIFIED AT INSPECTION.
|
|
|
Alarm Plan Review
|
Released for Construction
|
|
10/08/2015
|
|
Joe Dir
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
|
|
|
Final Development Plan Review
|
Approved
|
09/23/2015
|
09/09/2015
|
|
Joe Frogge
|
|
|
Building Plan Review
|
Approved with Conditions
|
09/02/2015
|
09/02/2015
|
|
Joe Frogge
|
|
Final Development Plan
The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department.
Action required: Comment is for informational purposes.
|
|
Gen - Submittal documents 7-137
Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri.
Action required: All design drawings submitted must bear seal and signature of MO state design professional. Missing on MEP, M, P & MG series drawings.
|
|
Screening - Rooftop equipment
Corrective Action Required
Planning and Development - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped.
Action required: Provide design for screening of new ACCU-9. (or verification that existing screening is in place and sufficient)
9/1/15 - per architect, existing structure works as screen. To be field verified at final.
|
|
Misc 13
2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means.
Action required: Provide gfci, weather protected, receptacle within 25' of new roof mounted ACCU-9.
|
|
Misc 14
2012 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide verification that existing roof structure will support additional roof load at ACCU-9.
|
|
|
Licensed Contractors
|
Approved
|
08/26/2015
|
09/01/2015
|
|
Joe Frogge
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
09/02/2015
|
08/31/2015
|
|
Joe Dir
|
|
Misc
Corrective Action Required
5003.5 Hazard identification signs.
Unless otherwise exempted by the fire code official, visible hazard identification signs as specified in NFPA 704 for the specific material contained shall be placed on stationary containers and above-ground tanks and at entrances to locations where hazardous materials are stored, dispensed, used or handled in quantities requiring a permit and at specific entrances and locations designated by the fire code official.5003.6 Signs.
Signs and markings required by Sections 5003.5 and 5003.5.1 shall not be obscured or removed, shall be in English as a primary language or in symbols allowed by this code, shall be durable, and the size, color and lettering shall be approved.5003.6 Signs.
Signs and markings required by Sections 5003.5 and 5003.5.1 shall not be obscured or removed, shall be in English as a primary language or in symbols allowed by this code, shall be durable, and the size, color and lettering shall be approved.
MED GAS rooms and BIO-HAZARDS rooms need to be clearly marked. Addressed in letter from ACI
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide Shop drawings for any alterations to the alarm system. Addressed in letter from ACI
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for any alterations to the fire supression/sprinkler system. Addressed in letter from ACI
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing required for the med gas lines, documentation for the med gas line test required. verified at inspection. Testing of the circuits for emergency generator power to the rennovation areas. verified at inspection. Testing of the alarm system alterations. To schedule a test call 816-969-1300. Addressed in letter from ACI
|
|
Misc
Corrective Action Required
[B] 1008.1.9.7 Delayed egress locks.
Approved, listed, delayed egress locks shall be permitted to be installed on doors serving any occupancy except Group A, E and H occupancies in buildings that are equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or an approved automatic smoke or heat detection system installed in accordance with Section 907, provided that the doors unlock in accordance with Items 1 through 6 below. A building occupant shall not be required to pass through more than one door equipped with a delayed egress lock before entering an exit.
1. The doors unlock upon actuation of the automatic sprinkler system or automatic fire detection system.
2. The doors unlock upon loss of power controlling the lock or lock mechanism.
Provide a door schedule for the life Safety plan AO-2. Addressed in letter from ACI
|
|
|
Building Plan Review
|
Rejected
|
08/14/2015
|
08/13/2015
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department.
Action required: Comment is for informational purposes.
|
|
License Tax Application
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action required: Comment is for informational purposes.
8/17/15 - RECEIVED
|
|
Gen - Submittal documents 7-137
Corrective Action Required
Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri.
Action required: All design drawings submitted must bear seal and signature of MO state design professional. Missing on MEP, M, P & MG series drawings.
|
|
Screening - Rooftop equipment
Corrective Action Required
Planning and Development - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped.
Action required: Provide design for screening of new ACCU-9. (or verification that existing screening is in place and sufficient)
|
|
Misc 13
Corrective Action Required
2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means.
Action required: Provide gfci, weather protected, receptacle within 25' of new roof mounted ACCU-9.
|
|
Misc 14
Corrective Action Required
2012 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide verification that existing roof structure will support additional roof load at ACCU-9.
|
|
|
Licensed Contractors
|
Rejected
|
08/14/2015
|
08/13/2015
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
08/14/2015
|
08/11/2015
|
|
Joe Dir
|
|
Misc
Corrective Action Required
5003.5 Hazard identification signs.
Unless otherwise exempted by the fire code official, visible hazard identification signs as specified in NFPA 704 for the specific material contained shall be placed on stationary containers and above-ground tanks and at entrances to locations where hazardous materials are stored, dispensed, used or handled in quantities requiring a permit and at specific entrances and locations designated by the fire code official.5003.6 Signs.
Signs and markings required by Sections 5003.5 and 5003.5.1 shall not be obscured or removed, shall be in English as a primary language or in symbols allowed by this code, shall be durable, and the size, color and lettering shall be approved.5003.6 Signs.
Signs and markings required by Sections 5003.5 and 5003.5.1 shall not be obscured or removed, shall be in English as a primary language or in symbols allowed by this code, shall be durable, and the size, color and lettering shall be approved.
MED GAS rooms and BIO-HAZARDS rooms need to be clearly marked
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide Shop drawings for any alterations to the alarm system
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for any alterations to the fire supression/sprinkler system
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing required for the med gas lines, documentation for the med gas line test required. verified at inspection. Testing of the circuits for emergency generator power to the rennovation areas. verified at inspection. Testing of the alarm system alterations. To schedule a test call 816-969-1300.
|
|
Misc
Corrective Action Required
[B] 1008.1.9.7 Delayed egress locks.
Approved, listed, delayed egress locks shall be permitted to be installed on doors serving any occupancy except Group A, E and H occupancies in buildings that are equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or an approved automatic smoke or heat detection system installed in accordance with Section 907, provided that the doors unlock in accordance with Items 1 through 6 below. A building occupant shall not be required to pass through more than one door equipped with a delayed egress lock before entering an exit.
1. The doors unlock upon actuation of the automatic sprinkler system or automatic fire detection system.
2. The doors unlock upon loss of power controlling the lock or lock mechanism.
Provide a door schedule for the life Safety plan AO-2
|
|
|