Permit Application Status

PRCOM20151735


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20151735
Building Permit - Commercial
Certificate of Occupancy
MIDWEST DIVISION LSH LLC
ADDITION COMMERCIAL
OPERATING ROOM ADDITION AND INTERIOR ALTERATIONS
07/31/2015
09/10/2015
02/10/2016
06/15/2016
Locations
Contacts
LYTLE CONSTRUCTION INC, Address:18505 E 163RD ST, Phone:(816) 524-7275  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
HEARTLAND ELECTRIC CORPORATION, Address:947 LOCUST HILL CIR, Phone:(816) 318-8500  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 11/25/2015
Joe Dir
Installation acceptance testing
Corrective Action Required
11/25/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD TESTING REQUIRED FOR THE NEW INSTALLATION. TOSCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300. INFORMATION PURPOSES
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
11/25/2015

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. THE ORIGINAL SPRINKLER SYSTEM SHALL BE CURRENT ON THE ANNUAL SERVICE. CURRENT SWERVICE TAG TO BE LOCATED ON THE RISER. VERIFIED AT INSPECTION.
Alarm Plan Review Released for Construction 10/08/2015
Joe Dir
Installation acceptance testing
Corrective Action Required
10/08/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Final Development Plan Review Approved 09/23/2015 09/09/2015
Joe Frogge
Building Plan Review Approved with Conditions 09/02/2015 09/02/2015
Joe Frogge
Final Development Plan
Resolved
09/09/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Gen - Submittal documents 7-137
Resolved
09/01/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: All design drawings submitted must bear seal and signature of MO state design professional. Missing on MEP, M, P & MG series drawings.
Screening - Rooftop equipment
Corrective Action Required
09/09/2015

Planning and Development - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped. Action required: Provide design for screening of new ACCU-9. (or verification that existing screening is in place and sufficient) 9/1/15 - per architect, existing structure works as screen. To be field verified at final.
Misc 13
Resolved
09/01/2015

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide gfci, weather protected, receptacle within 25' of new roof mounted ACCU-9.
Misc 14
Resolved
09/01/2015

2012 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that existing roof structure will support additional roof load at ACCU-9.
Licensed Contractors Approved 08/26/2015 09/01/2015
Joe Frogge
LC - General Contractor
Resolved
09/01/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
09/01/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 09/02/2015 08/31/2015
Joe Dir
Misc
Corrective Action Required
08/26/2015

5003.5 Hazard identification signs. Unless otherwise exempted by the fire code official, visible hazard identification signs as specified in NFPA 704 for the specific material contained shall be placed on stationary containers and above-ground tanks and at entrances to locations where hazardous materials are stored, dispensed, used or handled in quantities requiring a permit and at specific entrances and locations designated by the fire code official.5003.6 Signs. Signs and markings required by Sections 5003.5 and 5003.5.1 shall not be obscured or removed, shall be in English as a primary language or in symbols allowed by this code, shall be durable, and the size, color and lettering shall be approved.5003.6 Signs. Signs and markings required by Sections 5003.5 and 5003.5.1 shall not be obscured or removed, shall be in English as a primary language or in symbols allowed by this code, shall be durable, and the size, color and lettering shall be approved. MED GAS rooms and BIO-HAZARDS rooms need to be clearly marked. Addressed in letter from ACI
Construction documents for fire alarm systems
Corrective Action Required
08/26/2015

2012IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide Shop drawings for any alterations to the alarm system. Addressed in letter from ACI
Construction documents - Fire protection systems
Corrective Action Required
08/26/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for any alterations to the fire supression/sprinkler system. Addressed in letter from ACI
Installation acceptance testing
Corrective Action Required
08/26/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing required for the med gas lines, documentation for the med gas line test required. verified at inspection. Testing of the circuits for emergency generator power to the rennovation areas. verified at inspection. Testing of the alarm system alterations. To schedule a test call 816-969-1300. Addressed in letter from ACI
Misc
Corrective Action Required
08/26/2015

[B] 1008.1.9.7 Delayed egress locks. Approved, listed, delayed egress locks shall be permitted to be installed on doors serving any occupancy except Group A, E and H occupancies in buildings that are equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or an approved automatic smoke or heat detection system installed in accordance with Section 907, provided that the doors unlock in accordance with Items 1 through 6 below. A building occupant shall not be required to pass through more than one door equipped with a delayed egress lock before entering an exit. 1. The doors unlock upon actuation of the automatic sprinkler system or automatic fire detection system. 2. The doors unlock upon loss of power controlling the lock or lock mechanism. Provide a door schedule for the life Safety plan AO-2. Addressed in letter from ACI
Building Plan Review Rejected 08/14/2015 08/13/2015
Joe Frogge
Final Development Plan
Corrective Action Required
08/13/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Resolved
08/17/2015

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 8/17/15 - RECEIVED
Gen - Submittal documents 7-137
Corrective Action Required
08/13/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: All design drawings submitted must bear seal and signature of MO state design professional. Missing on MEP, M, P & MG series drawings.
Screening - Rooftop equipment
Corrective Action Required
08/13/2015

Planning and Development - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped. Action required: Provide design for screening of new ACCU-9. (or verification that existing screening is in place and sufficient)
Misc 13
Corrective Action Required
08/13/2015

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide gfci, weather protected, receptacle within 25' of new roof mounted ACCU-9.
Misc 14
Corrective Action Required
08/13/2015

2012 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that existing roof structure will support additional roof load at ACCU-9.
Licensed Contractors Rejected 08/14/2015 08/13/2015
Joe Frogge
LC - General Contractor
Corrective Action Required
08/13/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/13/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 08/14/2015 08/11/2015
Joe Dir
Misc
Corrective Action Required
08/11/2015

5003.5 Hazard identification signs. Unless otherwise exempted by the fire code official, visible hazard identification signs as specified in NFPA 704 for the specific material contained shall be placed on stationary containers and above-ground tanks and at entrances to locations where hazardous materials are stored, dispensed, used or handled in quantities requiring a permit and at specific entrances and locations designated by the fire code official.5003.6 Signs. Signs and markings required by Sections 5003.5 and 5003.5.1 shall not be obscured or removed, shall be in English as a primary language or in symbols allowed by this code, shall be durable, and the size, color and lettering shall be approved.5003.6 Signs. Signs and markings required by Sections 5003.5 and 5003.5.1 shall not be obscured or removed, shall be in English as a primary language or in symbols allowed by this code, shall be durable, and the size, color and lettering shall be approved. MED GAS rooms and BIO-HAZARDS rooms need to be clearly marked
Construction documents for fire alarm systems
Corrective Action Required
08/11/2015

2012IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide Shop drawings for any alterations to the alarm system
Construction documents - Fire protection systems
Corrective Action Required
08/11/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for any alterations to the fire supression/sprinkler system
Installation acceptance testing
Corrective Action Required
08/11/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing required for the med gas lines, documentation for the med gas line test required. verified at inspection. Testing of the circuits for emergency generator power to the rennovation areas. verified at inspection. Testing of the alarm system alterations. To schedule a test call 816-969-1300.
Misc
Corrective Action Required
08/11/2015

[B] 1008.1.9.7 Delayed egress locks. Approved, listed, delayed egress locks shall be permitted to be installed on doors serving any occupancy except Group A, E and H occupancies in buildings that are equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or an approved automatic smoke or heat detection system installed in accordance with Section 907, provided that the doors unlock in accordance with Items 1 through 6 below. A building occupant shall not be required to pass through more than one door equipped with a delayed egress lock before entering an exit. 1. The doors unlock upon actuation of the automatic sprinkler system or automatic fire detection system. 2. The doors unlock upon loss of power controlling the lock or lock mechanism. Provide a door schedule for the life Safety plan AO-2
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $7,695.60 $7,695.60 Paid 09/10/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Plumbing Inspection - Commercial Partial 9/25/2015 09/25/2015
Misc
Partial Correction
09/25/2015
-TWO STORM SEWERS FROM BUILDING TO WYE APPROVED
Underground Plumbing Inspection - Commercial Passed 9/28/2015 9/28/2015 at 12:00 AM 09/28/2015
Misc
Resolved
09/28/2015
-TWO STORM SEWERS FROM BUILDING TO WYE APPROVED
Footing Inspection - Commercial Partial 10/12/2015 (1:30) 10/12/2015 at 12:00 AM 10/12/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
10/12/2015
Footing Inspection - Commercial Partial 10/13/2015 (2:00) 10/13/2015 at 12:00 AM 10/13/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
10/13/2015
-11.8 to c.1 -12.3-c.1 -9.8 to C.1 -8.8 to C.1
Footing Inspection - Commercial Not Ready 10/14/2015 (2:00) 10/14/2015 at 12:00 AM 10/14/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
10/13/2015
-11.8 to c.1 -12.3-c.1 -9.8 to C.1 -8.8 to C.1
Misc
Corrective Action Required
10/14/2015
OFFICE TRAILER LOCKED NOACCESS; TO PERMIT PRINTS. NOT READY FOR INSPECTION. BEFORE CALLING FOR INSPECTION CREATE MINIMUM 3" CLEARANCE TO BOTTOMS AND BANKS.
Footing Inspection - Commercial Partial 10/15/2015 (1:00) 10/15/2015 at 12:00 AM 10/15/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
10/14/2015
-11.8 to c.1 -12.3-c.1 -9.8 to C.1 -8.8 to C.1 -D LINE -10.6 LINE
Misc
Resolved
10/15/2015
OFFICE TRAILER LOCKED NOACCESS; TO PERMIT PRINTS. NOT READY FOR INSPECTION. BEFORE CALLING FOR INSPECTION CREATE MINIMUM 3" CLEARANCE TO BOTTOMS AND BANKS.
Footing Inspection - Commercial Partial 10/16/2015 (11:00) 10/16/2015 at 12:00 AM 10/16/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
10/15/2015
-11.8 to c.1 -12.3-c.1 -9.8 to C.1 -8.8 to C.1 -D LINE -10.6 LINE
Underslab Plumbing Inspection - Commercial Partial 10/20/2015 at 12:00 AM 10/20/2015
Misc
Partial Correction
10/20/2015
ALL APPROVED EXCEPT TWO SINKS WEST SIDE
Rough Plumbing Inspection - Commercial Partial 12/17/2015
Misc
Partial Correction
12/17/2015
ROOF DRAINS TOP ROUGH APPROVED
In-wall Inspection Partial 12/23/2015 12/23/2015 12/23/2015
Misc
Partial Correction
12/23/2015
THE FOLLOWING AREAS ARE APPROVED TO COVER: EXTERIOR WALLS ONLY APPROVED.
In-wall Inspection Failed 1/19/2016 1/19/2016 01/19/2016
Misc
Corrective Action Required
01/19/2016
INSTALL SOLE PLATE PLUMBING PROTECTION NURSE STATIONS AND STERILE ROOM
In-wall Inspection Partial 1/21/2016 1/21/2016 01/21/2016
Misc
Resolved
01/21/2016
THE FOLLOWING AREAS ARE APPROVED TO COVER: ALL WALLS IN THE ADDITION PORTION OF THE BUILDING APPROVED TO COVER
In-wall Inspection Partial 1/22/2016 1/22/2016 01/22/2016
Underslab Plumbing Inspection - Commercial Partial 1/25/2016 1/25/2016 01/25/2016
Misc
Partial Correction
10/20/2015
ALL APPROVED EXCEPT TWO SINKS WEST SIDE -UP FROM SINKS IN 1047&1084&1091
Above Ceiling Inspection Partial 1/29/2016 1/29/2016 01/29/2016
Misc
Partial Correction
01/29/2016
O.R. #4, OKAY TO INSTALL GYP ON CEILING PENDING ACCESS IS PROVIDED TO INSPECT MECHANICAL DROPS.
Above Ceiling Inspection Partial 2/4/2016 2/4/2016 02/04/2016
Misc
Partial Correction
01/29/2016
O.R. #4, OKAY TO INSTALL GYP ON CEILING PENDING ACCESS IS PROVIDED TO INSPECT MECHANICAL DROPS. O.R. #2 OKAY TO INSTALL GYP PENDING ACCESS TO INSPECT DROPS
Underslab Plumbing Inspection - Commercial Passed 2/8/2016 02/08/2016
Misc
Resolved
02/08/2016
ALL APPROVED EXCEPT TWO SINKS WEST SIDE -UP FROM SINKS IN 1047&1084&1091
In-wall Inspection Partial 02/08/2016
Misc
Partial Correction
02/08/2016
DICTATION ROOMS AND O.R. RECOVERY ROOMS APPROVED. ALL IN WALL IN ADDITION AREAS APPROVED
Alarm Test Partial 2/11/2016 02/11/2016
Occupancy Inspection - Fire Temporary C of O 02/11/2016
Above Ceiling Inspection Partial 2/11/2016 2/11/2016 02/11/2016
Misc
Partial Correction
02/04/2016
O.R. #4, OKAY TO INSTALL GYP ON CEILING PENDING ACCESS IS PROVIDED TO INSPECT MECHANICAL DROPS. O.R. #2 OKAY TO INSTALL GYP PENDING ACCESS TO INSPECT DROPS
Misc
Corrective Action Required
02/11/2016
WEST COORIDOR, LABEL ALL ABOVE CEILING SYSTEMS PIPING, MED GAS, DOMESTIC WHERE THEY PENETRATE WALLS
Occupancy Inspection - Codes Commercial Temporary C of O 2/12/2016 2/12/2016 02/12/2016
Misc
Partial Correction
02/12/2016
OPERATING ROOM 4 INSPECTED AND APPROVED
Above Ceiling Inspection Passed 2/26/2016 2/26/2016 02/26/2016
Misc
Partial Correction
02/11/2016
O.R. #4, OKAY TO INSTALL GYP ON CEILING PENDING ACCESS IS PROVIDED TO INSPECT MECHANICAL DROPS. O.R. #2 OKAY TO INSTALL GYP PENDING ACCESS TO INSPECT DROPS
Misc
Corrective Action Required
02/11/2016
WEST COORIDOR, LABEL ALL ABOVE CEILING SYSTEMS PIPING, MED GAS, DOMESTIC WHERE THEY PENETRATE WALLS
Sprinkler - Hydrostatic Test Passed 2/29/2016 02/29/2016
Alarm Test Partial 3/9/2016 03/14/2016
Occupancy Inspection - Codes Commercial Partial 3/14/2016 3/14/2016 03/14/2016
Misc
Partial Correction
02/12/2016
OPERATING ROOM 4 INSPECTED AND APPROVED TWO PATIENT ROOMS APPROVED
Footing Inspection - Commercial Passed 3/15/2016 03/15/2016
THE FOLLOWING AREAS ARE APPROVED
Resolved
03/15/2016
-11.8 to c.1 -12.3-c.1 -9.8 to C.1 -8.8 to C.1 -D LINE -10.6 LINE
Alarm Test Passed 4/11/2016 04/11/2016
Occupancy Inspection - Codes Commercial Temporary C of O 4/11/2016 4/11/2016 04/11/2016
Misc
Partial Correction
03/14/2016
OPERATING ROOM 4 INSPECTED AND APPROVED TWO PATIENT ROOMS APPROVED MAIN AREA (PHASE 2): OBTAIN PLANNING AND DEVELOPMENT AND FIRE DEPARTMENT APPROVAL. PAY LICENSE TAX
Occupancy Inspection - Fire Temporary C of O 4/11/2016 04/11/2016
Occupancy Inspection - Fire Passed 4/18/2016 04/18/2016
Underslab Plumbing Inspection - Commercial Failed 5/12/2016 5/12/2016 05/12/2016
Misc
Corrective Action Required
05/12/2016
-NO CLEANOUTS FOR FIXTURES INSTALLED
In-wall Inspection Passed 5/20/2016 5/20/2016 05/20/2016
Underslab Plumbing Inspection - Commercial Passed 05/20/2016
Misc
Corrective Action Required
05/12/2016
-NO CLEANOUTS FOR FIXTURES INSTALLED
Above Ceiling Inspection Not Ready 6/10/2016 6/10/2016 06/10/2016
Misc
Corrective Action Required
06/10/2016
FLOORING CREW HAS FLOORS SPREAD-IN -- NOT TO BE WALKED ON. COMPLETE ALL ABOVE-CEILING ELECTRICAL WORK BEFORE REQUESTING INSPECTION.
Above Ceiling Inspection Passed 6/13/2016 6/13/2016 06/13/2016
Misc
Resolved
06/13/2016
FLOORING CREW HAS FLOORS SPREAD-IN -- NOT TO BE WALKED ON. COMPLETE ALL ABOVE-CEILING ELECTRICAL WORK BEFORE REQUESTING INSPECTION.
Occupancy Inspection - Codes Commercial Full C of O 6/15/2016 6/15/2016 06/15/2016
Misc
Resolved
06/15/2016
OPERATING ROOM 4 INSPECTED AND APPROVED TWO PATIENT ROOMS APPROVED MAIN AREA (PHASE 2): OBTAIN PLANNING AND DEVELOPMENT AND FIRE DEPARTMENT APPROVAL. PAY LICENSE TAX
Occupancy Inspection - Fire Passed 6/15/2016 06/15/2016
Documents & Images
Date Uploaded File Type Document Name
08/11/2015 Letter Fire Building Plan Review
08/14/2015 Letter Codes P/R Corrections Document
08/31/2015 Letter Final Plan Review Conditions
09/09/2015 Letter Codes Plan Review Conditions
09/10/2015 Receipt Receipt for transaction: 2015-005310
09/10/2015 Letter Codes Building Permit
09/25/2015 Letter Inspection Summary
09/28/2015 Letter Inspection Summary
10/08/2015 Letter Fire (Alarm) Plan Review Notice
10/12/2015 Letter Inspection Summary
10/13/2015 Letter Inspection Summary
10/14/2015 Letter Inspection Summary
10/15/2015 Letter Inspection Summary
10/16/2015 Letter Inspection Summary
10/20/2015 Letter Inspection Summary
11/25/2015 Letter Fire (Sprinkler) Plan Review
12/17/2015 Letter Inspection Summary
12/23/2015 Letter Inspection Summary
01/21/2016 Letter Inspection Summary
01/25/2016 Letter Inspection Summary
01/29/2016 Letter Inspection Summary
02/04/2016 Letter Inspection Summary
02/08/2016 Letter Inspection Summary
02/11/2016 Letter Inspection Summary
02/12/2016 Letter Codes Temporary Certificate of Occupancy
02/26/2016 Letter Inspection Summary
03/15/2016 Letter Inspection Summary
04/11/2016 Letter Codes Temporary Certificate of Occupancy
05/12/2016 Letter Inspection Summary
05/20/2016 Letter Inspection Summary
06/10/2016 Letter Inspection Summary
06/13/2016 Letter Inspection Summary
06/15/2016 Letter Field Certificate of Occupancy
06/16/2016 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home