Permit Application Status

PRCOM20151716


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20151716
Building Permit - Commercial
Final Completion
BFRE LLC
ADDITION COMMERCIAL
ADDITION OF 3 CAR WASH BAYS - ADDITION OF 3 SERVICE BAYS - INTERIOR ALTERATIONS
07/29/2015
09/11/2015
02/07/2016
05/03/2016
Locations
Contacts
MEYER BROTHERS BUILDING COMPANY, Address:800 E 101ST TER STE 120, Phone:(816) 246-4800  
LBA AIR CONDITIONING, HEATING AND PLUMBING INC, Address:6850 W 47TH TER, Phone:(913) 268-6822  
DESIGN BUILD ELECTRIC LLC, Address:7320 W 162ND ST STE 104, Phone:(913) 402-6002  
LBA AIR CONDITIONING, HEATING AND PLUMBING INC, Address:6850 W 47TH TER, Phone:(913) 268-6822  
DAVIDSON ARCHITECTURE & ENGINEERING - PAUL MILLER, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
BFRE LLC, Address:3200 S OUTER RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 12/31/2015
Joe Dir
Sprinkler Plan Review Released for Construction 10/12/2015
Joe Dir
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
10/12/2015

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. FIRE SPRINKLER SYSTEM SHALL BE CURRENT ON ITS ANNUAL SERVICE, VERIFIED AT INSPECTION
Final Development Plan Review Approved 10/13/2015 09/04/2015
Joe Frogge
Building Plan Review Approved 08/26/2015 09/04/2015
Joe Frogge
Final Development Plan
Resolved
09/04/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Fire Plan Review Approved with Conditions 08/26/2015 09/04/2015
Joe Frogge
Misc
Corrective Action Required
09/03/2015

907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building’s fire alarm control unit when a fire alarm system is required by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Duct smoke detectors complying with Section 907.3.1 shall be located as follows: 1. In the main return air and exhaust air plenum of each air-conditioning system having a capacity greater than 2,000 cubic feet per minute (cfm) (0.94 m3/s). Such detectors shall be located in a serviceable area downstream of the last duct inlet. All of the RTU replaced exceeding 2000 CFM are requied to have duct detection installed. Acknowledged in letter form Davidson A&E
Construction documents for fire alarm systems
Corrective Action Required
09/03/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Submit shop drawings for any alterations to the alarm system. Acknowledged in letter from Davidson A&E
Address numbers required
Corrective Action Required
09/03/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Post the numeric address of the building readable from the roadway. Verified at inspection
Construction documents - Fire protection systems
Corrective Action Required
09/03/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Submit shop drawings for any alterations to the fire supression/sprinkler system. Acknowledged in letter from Davidson A&E
Installation acceptance testing
Corrective Action Required
09/03/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing is required for any new alarm system devices to schedule a test call 816-969-1300. Acknowledged in letter from Davidson A&E
Licensed Contractors Approved 08/19/2015 09/01/2015
Tara Mitchell
LC - MEP Subs
Resolved
09/04/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 08/26/2015 08/28/2015
Joe Dir
Misc
Corrective Action Required
08/19/2015

907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building’s fire alarm control unit when a fire alarm system is required by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Duct smoke detectors complying with Section 907.3.1 shall be located as follows: 1. In the main return air and exhaust air plenum of each air-conditioning system having a capacity greater than 2,000 cubic feet per minute (cfm) (0.94 m3/s). Such detectors shall be located in a serviceable area downstream of the last duct inlet. All of the RTU replaced exceeding 2000 CFM are requied to have duct detection installed. Acknowledged in letter form Davidson A&E
Construction documents for fire alarm systems
Corrective Action Required
08/19/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Submit shop drawings for any alterations to the alarm system. Acknowledged in letter from Davidson A&E
Address numbers required
Corrective Action Required
08/19/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Post the numeric address of the building readable from the roadway. Verified at inspection
Construction documents - Fire protection systems
Corrective Action Required
08/19/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Submit shop drawings for any alterations to the fire supression/sprinkler system. Acknowledged in letter from Davidson A&E
Installation acceptance testing
Corrective Action Required
08/19/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing is required for any new alarm system devices to schedule a test call 816-969-1300. Acknowledged in letter from Davidson A&E
Building Plan Review Approved with Conditions 08/26/2015 08/20/2015
Joe Frogge
Final Development Plan
Corrective Action Required
08/19/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Resolved
08/20/2015

2012 IBC 716.2 Fire-resistance-rated glazing. Fire-resistance-rated glazing when tested as part of a fire-resistance-rated wall assembly in accordance with ASTM E 119 or UL 263 and labeled in accordance with Section 703.5 shall be permitted in fire doors and fire window assemblies where tested an installed in accordance with their listings and shall not otherwise be required to comply with this section. 2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80. Action required: Specify fire ratings for doors and windows in fire rated assembly that separates existing Service Area from sales area. 8/20/15 - note added to use existing rated fire shutters for door and storefront assemblies
Misc
Resolved
08/20/2015

2012 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Footings must extend to minimum frost depth of 36". 8/20/15 - clarified
Bldg - Toilet room wall finish 1210.2.2
Resolved
08/20/2015

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Paint, if used, in restrooms at areas listed above must be epoxy type. 8/20/15 - epoxy added to finish schedule
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Resolved
08/20/2015

2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Provide minimum 36" length of maximum 36" counter space at Sales Counter per 2009 ICC/ANSI A117.1 Section 904.3. 8/20/15 - relevant counter adjusted. sales counter is not a pos
Miscellaneous Correction
Resolved
08/20/2015

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles in new Lube Area are gfci protected. 8/20/15 - gfi tag added to receptacles
Gen - Submittal documents 7-137
Resolved
08/20/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Drawings required to bear seal and signature from State of Missouri design professional. (currently has Kansas seal) 8/20/15 - corrected
Fire Plan Review Approved with Conditions 08/12/2015 08/11/2015
Joe Dir
Misc
Corrective Action Required
08/11/2015

907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building’s fire alarm control unit when a fire alarm system is required by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Duct smoke detectors complying with Section 907.3.1 shall be located as follows: 1. In the main return air and exhaust air plenum of each air-conditioning system having a capacity greater than 2,000 cubic feet per minute (cfm) (0.94 m3/s). Such detectors shall be located in a serviceable area downstream of the last duct inlet. All of the RTU replaced exceeding 2000 CFM are requied to have duct detection installed
Construction documents for fire alarm systems
Corrective Action Required
08/11/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Submit shop drawings for any alterations to the alarm system
Address numbers required
Corrective Action Required
08/11/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Post the numeric address of the building readable from the roadway
Construction documents - Fire protection systems
Corrective Action Required
08/11/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Submit shop drawings for any alterations to the fire supression/sprinkler system
Installation acceptance testing
Corrective Action Required
08/11/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Testing is required for any new alarm system devices to schedule a test call 816-969-1300
Building Plan Review Rejected 08/12/2015 08/06/2015
Joe Frogge
Final Development Plan
Corrective Action Required
08/06/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
08/06/2015

2012 IBC 716.2 Fire-resistance-rated glazing. Fire-resistance-rated glazing when tested as part of a fire-resistance-rated wall assembly in accordance with ASTM E 119 or UL 263 and labeled in accordance with Section 703.5 shall be permitted in fire doors and fire window assemblies where tested an installed in accordance with their listings and shall not otherwise be required to comply with this section. 2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80. Action required: Specify fire ratings for doors and windows in fire rated assembly that separates existing Service Area from sales area.
Misc
Corrective Action Required
08/06/2015

2012 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Footings must extend to minimum frost depth of 36".
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
08/06/2015

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Paint, if used, in restrooms at areas listed above must be epoxy type.
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Corrective Action Required
08/06/2015

2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Provide minimum 36" length of maximum 36" counter space at Sales Counter per 2009 ICC/ANSI A117.1 Section 904.3.
Miscellaneous Correction
Corrective Action Required
08/06/2015

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles in new Lube Area are gfci protected.
Gen - Submittal documents 7-137
Corrective Action Required
08/09/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Drawings required to bear seal and signature from State of Missouri design professional. (currently has Kansas seal)
Licensed Contractors Rejected 08/12/2015 08/06/2015
Joe Frogge
LC - MEP Subs
Corrective Action Required
08/06/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $3,109.72 $3,109.72 Paid 09/11/2015
8331507-Sewer Connection Fee $90.00 $90.00 Paid 09/11/2015
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 9/29/2015 (8:00) 9/29/2015 at 12:00 AM 09/29/2015
Misc
Partial Correction
09/29/2015
GRADE BEAM FOR NEW WASH BAYS @ SW OK TO POUR WHEN READY. NO DOWELS SET INTO EXISTING GRADE BEAM; NONE INDICATED ON APPROVED DRAWINGS. JB REFERRED QUESTION TO SPECIAL INSPECTOR PRESENTLY ON JOBSITE -- TO BE DETERMINED BEFORE POUR.
Underslab Plumbing Inspection - Commercial Partial 10/2/2015 at 12:00 AM 10/02/2015
Misc
Partial Correction
10/02/2015
OK TO COVER WHEN READY UNDER-SLAB 4" PVC SANITARY DRAIN & 2" VENT PIPING AT WASH BAYS. NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Footing Inspection - Commercial Passed 10/7/2015 at 12:00 AM 10/07/2015
Misc
Resolved
10/07/2015
GRADE BEAM FOR NEW WASH BAYS @ SW OK TO POUR WHEN READY. NO DOWELS SET INTO EXISTING GRADE BEAM; NONE INDICATED ON APPROVED DRAWINGS. JB REFERRED QUESTION TO SPECIAL INSPECTOR PRESENTLY ON JOBSITE -- TO BE DETERMINED BEFORE POUR.
Underground Electrical Inspection - Commercial Not Ready 10/21/2015 10/21/2015 at 12:00 AM 10/21/2015
Underground Electrical Inspection - Commercial Not Ready 10/21/2015 10/21/2015 at 12:00 AM 10/21/2015
Underground Electrical Inspection - Commercial Passed 10/22/2015 at 12:00 AM 10/22/2015
Underslab Plumbing Inspection - Commercial Partial 10/30/2015 10/30/2015 at 12:00 AM 10/30/2015
Misc
Partial Correction
10/02/2015
OK TO COVER WHEN READY UNDER-SLAB: 4" PVC SANITARY DRAIN & 2" VENT PIPING AT WASH BAYS; 2"W FROM DBL SINK @ [116] WEST TO TIE-IN TO EXISTING TO NW NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underslab Electrical Inspection - Commercial Partial 10/30/2015 at 12:00 AM 10/30/2015
Misc
Partial Correction
10/30/2015
OK TO COVER WHEN READY UNDER-SLAB 3/4" PVC CONDUIT AT SALES TOWER [115]
Footing Inspection - Commercial Passed 11/5/2015 (8:00) 11/5/2015 at 12:00 AM 11/05/2015
In-wall Inspection Partial 11/16/2015 11/16/2015 at 12:00 AM 11/16/2015
Misc
Partial Correction
11/16/2015
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: [115] THRU [118] + AT EXISTING STAIR;
Above Ceiling Inspection Partial 12/2/2015 12/2/2015 at 12:00 AM 12/02/2015
Misc
Partial Correction
12/02/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 115-118;
Gas Piping Inspection - Commercial Partial 12/8/2015 12/8/2015 at 12:00 AM 12/08/2015
Misc
Partial Correction
12/08/2015
VISULA INSPECTION OK AND GAS PIPING PRESSURE TEST HELD STEADY AT >= 10 PSI FOR >=10 MIN. AT FOLLOWING PORTIONS OF GAS PIPING: FROM [140] SW TO UH-1 AND UH-2 IN NEW WASH BAYS;
Final Inspection - Commercial Partial 12/10/2015 12/10/2015 at 12:00 AM 12/10/2015
Misc
Partial Correction
12/10/2015
OK FOR USE & OCCUPANCY AT FOLLOWING SPACES: 115-118 AFTER FIRE DEPARTMENT ISSUES ARE RESOLVED AND... - ALL ELECTRICAL RECEPTACLES ARE SOLID TO BOXES - GFCI PROTECTION IS VERIFIED ON RECEPTACLES WITHIN 6' OF EDGE OF SINK
Final Inspection - Commercial Partial 12/16/2015 12/16/2015 12/16/2015
Misc
Partial Correction
12/10/2015
OK FOR USE & OCCUPANCY AT FOLLOWING SPACES: PHASE 1 SPACES [115]-[118]; WASH BAY ADDITION OK IF VACUUM BREAKER IS INSTALLED ON THREADED HOSE BIBB CONNECTION;
In-wall Inspection Partial 12/23/2015 12/23/2015 12/23/2015
Misc
Partial Correction
11/16/2015
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: [115] THRU [118] + AT EXISTING STAIR; [114] AFTER CRIPPLES ARE SCREWED BOTH FLANGES AT HEADER ABOVE DOOR;
Gas Piping Inspection - Commercial Partial 12/23/2015 12/23/2015 12/23/2015
Misc
Partial Correction
12/08/2015
VISUAL INSPECTION OK AND GAS PIPING PRESSURE TEST HELD STEADY OR INCREASED AT >= 10 PSI FOR >=10 MIN. AT FOLLOWING PORTIONS OF GAS PIPING: FROM [140] SW TO UH-1 AND UH-2 IN NEW WASH BAYS; NEW PIPING TO RTUs #6, #7, #8;
Occupancy Inspection - Fire Passed 12/16/2015 at 12:00 AM 12/31/2015
Occupancy Inspection - Fire Passed 1/29/2016 12/31/2015
Above Ceiling Inspection Partial 1/13/2016 1/13/2016 01/13/2016
Misc
Partial Correction
12/02/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 115-118; 114;
Final Inspection - Commercial Partial 1/29/2016 1/29/2016 01/29/2016
Misc
Partial Correction
12/16/2015
OK FOR USE & OCCUPANCY AT FOLLOWING SPACES: PHASE 1 SPACES [115]-[118]; WASH BAY ADDITION OK IF VACUUM BREAKER IS INSTALLED ON THREADED HOSE BIBB CONNECTION; PHASE 2 INCLUDING [113] & [114];
In-wall Inspection Partial 2/18/2016 02/18/2016
Misc
Partial Correction
12/23/2015
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: [115] THRU [118] + AT EXISTING STAIR; [114] AFTER CRIPPLES ARE SCREWED BOTH FLANGES AT HEADER ABOVE DOOR; [100]-[108] AFTER CRIPPLES ARE SCREWED BOTH FLANGES BOTH ENDS; [111-113]; AIR-LOCK AT FRONT ENTRANCE AFTER EXTERIOR WALL STUDS ARE FULLY SCREWED AT ALL FLANGE CONNECTIONS;
Above Ceiling Inspection Partial 3/9/2016 3/9/2016 03/09/2016
Misc
Partial Correction
03/09/2016
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 115-118; 114; PHASE 3 AREA EXCEPT LEAVE OUT TILE WHERE 5 MISSING EM LIGHT FIXTURES ARE TO BE INSTALLED -- FULL PATH FROM MC WIRING SOURCE TO FED EM FIXTURE.
Above Ceiling Inspection Passed 3/17/2016 3/17/2016 03/17/2016
Misc
Resolved
03/17/2016
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 115-118; 114; PHASE 3 AREA; EXISTING NORTH VESTIBULE
Underslab Plumbing Inspection - Commercial Passed 10/30/2015 03/30/2016
Misc
Resolved
03/30/2016
OK TO COVER WHEN READY UNDER-SLAB: 4" PVC SANITARY DRAIN & 2" VENT PIPING AT WASH BAYS; 2"W FROM DBL SINK @ [116] WEST TO TIE-IN TO EXISTING TO NW NOTE IPC 312 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underslab Electrical Inspection - Commercial Passed 10/30/2015 03/30/2016
Misc
Resolved
03/30/2016
OK TO COVER WHEN READY UNDER-SLAB 3/4" PVC CONDUIT AT SALES TOWER [115]
In-wall Inspection Passed 2/18/2016 03/30/2016
Misc
Resolved
03/30/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING LOCATIONS: [115] THRU [118] + AT EXISTING STAIR; [114] AFTER CRIPPLES ARE SCREWED BOTH FLANGES AT HEADER ABOVE DOOR; [100]-[108] AFTER CRIPPLES ARE SCREWED BOTH FLANGES BOTH ENDS; [111-113]; AIR-LOCK AT FRONT ENTRANCE AFTER EXTERIOR WALL STUDS ARE FULLY SCREWED AT ALL FLANGE CONNECTIONS;
Gas Piping Inspection - Commercial Passed 12/23/2015 03/30/2016
Misc
Resolved
03/30/2016
VISUAL INSPECTION OK AND GAS PIPING PRESSURE TEST HELD STEADY OR INCREASED AT >= 10 PSI FOR >=10 MIN. AT FOLLOWING PORTIONS OF GAS PIPING: FROM [140] SW TO UH-1 AND UH-2 IN NEW WASH BAYS; NEW PIPING TO RTUs #6, #7, #8;
Final Inspection - Commercial Partial 3/30/2016 3/30/2016 03/30/2016
Misc
Partial Correction
01/29/2016
OK FOR TEMPORARY USE & OCCUPANCY AT ALL PHASE AREAS THROUGH APRIL 28, 2016. CALL FOR RE-INSPECTION WHEN READY.
Misc
Corrective Action Required
03/30/2016
RESOLVE PLANNING DEPARTMENT ISSUES.
Alarm Test Passed 3/30/2016 03/30/2016
Occupancy Inspection - Fire Passed 3/30/2016 03/30/2016
Occupancy Inspection - Planning Temporary C of O 03/30/2016
Corrective Action Required
03/30/2016
Planning will need to inspect exterior light fixtures once they are installed to determine compliance with the UDO.
Final Inspection - Commercial Passed 4/28/2016 04/28/2016
Misc
Resolved
04/28/2016
OK FOR TEMPORARY USE & OCCUPANCY AT ALL PHASE AREAS THROUGH APRIL 28, 2016. CALL FOR RE-INSPECTION WHEN READY.
Misc
Resolved
04/28/2016
RESOLVE PLANNING DEPARTMENT ISSUES.
Investigation Inspection Complete 4/28/2016 04/28/2016
Occupancy Inspection - Planning Passed 04/28/2016
Documents & Images
Date Uploaded File Type Document Name
08/11/2015 Letter Fire Building Plan Review
08/11/2015 Letter Codes P/R Corrections Document
08/28/2015 Letter Fire Building Plan Review
09/04/2015 Letter Codes Plan Review Conditions
09/11/2015 Receipt Receipt for transaction: 2015-005349
09/11/2015 Letter Codes Building Permit
09/29/2015 Letter Inspection Summary
10/02/2015 Letter Inspection Summary
10/07/2015 Letter Inspection Summary
10/09/2015 refund request letter
10/12/2015 Letter Fire (Sprinkler) Plan Review
10/22/2015 Letter Inspection Summary
10/30/2015 Letter Inspection Summary
10/30/2015 Letter Inspection Summary
11/05/2015 Letter Inspection Summary
11/16/2015 Letter Inspection Summary
12/02/2015 Letter Inspection Summary
12/08/2015 Letter Inspection Summary
12/10/2015 Letter Inspection Summary
12/16/2015 Letter Inspection Summary
12/23/2015 Letter Inspection Summary
01/13/2016 Letter Inspection Summary
01/29/2016 Letter Inspection Summary
02/18/2016 Letter Inspection Summary
03/09/2016 Letter Inspection Summary
03/17/2016 Letter Inspection Summary
03/30/2016 Letter Inspection Summary
04/28/2016 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home