Permit Application Status

PRCOM20151315


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20151315
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
SINK AND CASEWORK IN EXISTING 3RD FLOOR PHARMACY
06/11/2015
06/17/2015
10/21/2015
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
ACI-BOLAND, Address:1421 EAST 104TH STREET, SUITE 100, Phone:(816) 763-9600  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 06/23/2015 06/16/2015
Jim Eden
Building Plan Review Approved 06/23/2015 06/11/2015
Joe Frogge
Licensed Contractors Approved 06/11/2015 06/11/2015
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $49.49 $49.49 Paid 06/17/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 6/26/2015 6/26/2015 at 12:00 AM 06/26/2015
Above Ceiling Inspection Passed 6/26/2015 at 12:00 AM 06/26/2015
Final Inspection - Commercial Passed 10/22/2015 10/22/2015 at 12:00 AM 10/22/2015
Documents & Images
Date Uploaded File Type Document Name
06/17/2015 Receipt Receipt for transaction: 2015-003069
06/17/2015 Letter Codes Building Permit
06/26/2015 Letter Inspection Summary
10/22/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home