PRCOM20151193
Building Permit - Commercial
Final Completion
LEES SUMMIT SCHOOL DIST R 7
REPAIR REPLACE UPGRADE
BOILER REPLACEMENT
05/28/2015
06/25/2015
12/07/2015
08/17/2015
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
MARTIN MECHANICAL INC, Address:11632 GRANDVIEW RD, Phone:(816) 842-2900  
MARK ONE ELECTRIC CO INC, Address:1414 GENESSEE ST, Phone:(816) 842-7023  
R2 PLUMBING LLC, Address:1705 A SE COUNTY RD AA, Phone:(816) 215-8098  
HTK ARCHITECTS, Address:9300 W 110TH ST, STE 150, Phone:(913) 663-5373  
LEES SUMMIT SCHOOL DIST R 7, Address:600 MILLER  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 06/24/2015 06/24/2015
Joe Dir
Misc
Corrective Action Required
06/24/2015

No FD comments
Building Plan Review Approved 06/24/2015 06/19/2015
Joe Frogge
Gen - Submittal documents 7-137
Resolved
06/19/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: Provide seal and signature on MEP drawings. Also, define scope of work; some notes on drawings seem to infer that not all work on drawings is to be performed.
IFGC - Air for combustion, ventilation and dilution of flue gases 304
Resolved
06/19/2015

2012 IFGC 304 General. Air for combustion, ventilation and dilution of flue gases for appliances installed in buildings shall be provided by application of one of the methods prescribed in Sections 304.5 through 304.9. Where the requirements of Section 304.5 are not met, outdoor air shall be introduced in accordance with one of the methods prescribed in Sections 304.6 through 304.9. Direct-vent appliances, gas appliances of other than natural draft design and vented gas appliances other than Category I shall be provided with combustion, ventilation and dilution air in accordance with the appliance manufacturer’s instructions. (see code for exception) Action required: Provide combustion air calculations for boiler room. Must be evaluated by Mech Eng.
Bldg - Incidental uses - Separation 509.4.1
Resolved
06/24/2015

2012 IBC 509.4.1 – Separation. Where Table 509 specifies a fire-resistance-rated separation, the incidental uses shall be separated from the remainder of the building by a fire barrier constructed in accordance with Section 7074 or a horizontal assembly constructed in accordance with Section 711, or both. Construction supporting 1-hour fire barriers or horizontal assemblies used for incidental use separations in buildings of Type IIB, IIIB or VB construction is not required to be fire-resistance rated unless required by other sections of this code. Action required: Boiler room must be fully sprinklered or contained within 1 hour rated structure. Clarify.
Mech - Duct detectors - Return air systems 606.2.1
Resolved
06/19/2015

2012 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Smoke detection required at AHU-1.
Licensed Contractors Approved 06/17/2015 06/19/2015
Joe Frogge
Building Plan Review Rejected 06/10/2015
Joe Frogge
Gen - Submittal documents 7-137
Corrective Action Required
06/10/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: Provide seal and signature on MEP drawings. Also, define scope of work; some notes on drawings seem to infer that not all work on drawings is to be performed.
IFGC - Air for combustion, ventilation and dilution of flue gases 304
Corrective Action Required
06/10/2015

2012 IFGC 304 General. Air for combustion, ventilation and dilution of flue gases for appliances installed in buildings shall be provided by application of one of the methods prescribed in Sections 304.5 through 304.9. Where the requirements of Section 304.5 are not met, outdoor air shall be introduced in accordance with one of the methods prescribed in Sections 304.6 through 304.9. Direct-vent appliances, gas appliances of other than natural draft design and vented gas appliances other than Category I shall be provided with combustion, ventilation and dilution air in accordance with the appliance manufacturer’s instructions. (see code for exception) Action required: Provide combustion air calculations for boiler room. Must be evaluated by Mech Eng.
Bldg - Incidental uses - Separation 509.4.1
Corrective Action Required
06/10/2015

2012 IBC 509.4.1 – Separation. Where Table 509 specifies a fire-resistance-rated separation, the incidental uses shall be separated from the remainder of the building by a fire barrier constructed in accordance with Section 7074 or a horizontal assembly constructed in accordance with Section 711, or both. Construction supporting 1-hour fire barriers or horizontal assemblies used for incidental use separations in buildings of Type IIB, IIIB or VB construction is not required to be fire-resistance rated unless required by other sections of this code. Action required: Boiler room must be fully sprinklered or contained within 1 hour rated structure. Clarify.
Mech - Duct detectors - Return air systems 606.2.1
Corrective Action Required
06/10/2015

2012 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Smoke detection required at AHU-1.
Fire Plan Review Approved 06/04/2015
Brian Austerman
Misc
Corrective Action Required
06/04/2015

No FD comments
Licensed Contractors Approved 06/11/2015 06/02/2015
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $5,472.80 $5,472.80 Paid 06/25/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Mechanical Inspection - Commercial Partial 8/3/2015 at 12:00 AM 08/03/2015
Rough Mechanical Inspection - Commercial Partial 8/6/2015 at 12:00 AM 08/06/2015
Rough Mechanical Inspection - Commercial Partial 8/10/2015 at 12:00 AM 08/10/2015
Rough Plumbing Inspection - Commercial Not Ready 8/10/2015 8/11/2015 at 12:00 AM 08/11/2015
Rough Mechanical Inspection - Commercial Not Ready 8/11/2015 at 12:00 AM 08/11/2015
Misc
Corrective Action Required
08/11/2015
PERMIT PRINTS NOT ON JOBSITE
Rough Mechanical Inspection - Commercial Partial 8/13/2015 at 12:00 AM 08/13/2015
Misc
Corrective Action Required
08/11/2015
PERMIT PRINTS NOT ON JOBSITE
Rough Plumbing Inspection - Commercial Partial 8/13/2015 at 12:00 AM 08/13/2015
Rough Electrical Inspection - Commercial Partial 8/13/2015 at 12:00 AM 08/13/2015
Rough Mechanical Inspection - Commercial Passed 8/14/2015 8/17/2015 at 12:00 AM 08/17/2015
Rough Plumbing Inspection - Commercial Passed 8/17/2015 at 12:00 AM 08/17/2015
Rough Electrical Inspection - Commercial Passed 8/17/2015 at 12:00 AM 08/17/2015
Final Inspection - Commercial Passed 8/17/2015 at 12:00 AM 08/17/2015
Documents & Images
Date Uploaded File Type Document Name
06/04/2015 Letter Fire Building Plan Review
06/10/2015 Letter Codes P/R Corrections Document
06/24/2015 Letter Fire Building Plan Review
06/24/2015 Letter Codes Plan Review Conditions
06/25/2015 Letter Codes Building Permit
06/25/2015 Receipt Receipt for transaction: 2015-003425
08/17/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home