Permit Application Status

PRCOM20151096


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20151096
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
REPAIR REPLACE UPGRADE
HVAC REPLACEMENT
05/19/2015
05/19/2015
05/21/2015
Locations
Contacts
BOAN HEATING & COOLING INC, Address:12001 E STATE ROUTE 50, Phone:(816) 356-4508  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/19/2015 05/19/2015
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Repair/Replace/Upgrade $49.17 $49.17 Paid 05/19/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Mechanical Inspection Failed 5/21/2015 5/21/2015 at 12:00 AM 05/21/2015
Misc
Corrective Action Required
05/21/2015
NEC 370-20 SECURING OF ELECTRICAL BOXES: SECURE ELECTRICAL SWITCH BOX TO WALL ADJACENT TO FURNACE.
Misc
Corrective Action Required
05/21/2015
NEC 350.30: LIQUIDTIGHT FLEXIBLE NON-METALLIC ELECTRICAL WHIP MUST BE SECURED TO STRUCTURE WITHIN 12" OF ENTRY TO A/C DISCONNECT ENCLOSURE. ZIP-TYING TO LINESET DOES NOT SATISFY ELECTRICAL CODE REQUIREMENT.
Final Mechanical Inspection Passed 5/21/2015 at 12:00 AM 05/21/2015
Misc
Resolved
05/21/2015
NEC 370-20 SECURING OF ELECTRICAL BOXES: SECURE ELECTRICAL SWITCH BOX TO WALL ADJACENT TO FURNACE.
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit