Permit Application Status

PRCOM20151014


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20151014
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW COMMERCIAL
AIRPORT HANGAR
05/11/2015
06/24/2015
09/29/2015
Locations
Contacts
M.A.C. CORPORATION OF KANSAS, Address:900 NW HUNTER DR, STE 2 SOUTH, Phone:(816) 229-6090  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
ROZIER ELECTRIC, Address:1608 SW JEFFERSON ST, Phone:(816) 246-9000  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 05/22/2015 06/17/2015
Joe Frogge
Misc
Resolved
05/20/2015

2012 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: construction type incorrect. turned out to be a typo. modified by hand per architect's direction
Final Development Plan
Resolved
06/17/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Final Development Plan Review Approved 06/23/2015 06/17/2015
Joe Frogge
Fire Plan Review Approved 05/26/2015 05/13/2015
Joe Frogge
Licensed Contractors Approved 05/26/2015 05/13/2015
Joe Frogge
Fire Plan Review Approved 05/12/2015
Brian Austerman
Misc
Corrective Action Required
05/12/2015

No FD comments
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $640.58 $640.58 Paid 06/24/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 7/30/2015 (10:00) 7/30/2015 at 12:00 AM 07/30/2015
Electrical Service Inspection Failed 9/15/2015 9/15/2015 at 12:00 AM 09/15/2015
Misc
Corrective Action Required
09/15/2015
-THE ENCASED FOOTING STEEL GROUNDING ELECTRODE SHALL NOT BE BURIED IN SOIL OR EXPOSED TO EXTERIOR ENVIRONMENT -GROUND THE SERVICE TO BUILDING STEEL -GROUND ELECTRODE CONDUCTOR SHALL CONNECT TO THE BUS BAR WHERE THE SERVICE GROUNDED CONDUCTOR IS CONNECTED TO; OR INSTALL THE #4 MAIN BONDING JUMPER FROM THE GROUNDED BAR TO THE GROUNDING BAR ON THE LEFT SIDE. THIS WILL ALSO BOND THE ENCLOSURE TO THE SERVICE GROUNDED CONDUCTOR AS REQUIRED PER 250.24(A)(4) AND 250.24(B) -INSTALL A #4 COPPER GEC TO UFER AND BUILDING STEEL PER TABLE 250.66
Electrical Service Inspection Passed 9/16/2015 9/16/2015 at 12:00 AM 09/16/2015
Misc
Resolved
09/16/2015
-THE ENCASED FOOTING STEEL GROUNDING ELECTRODE SHALL NOT BE BURIED IN SOIL OR EXPOSED TO EXTERIOR ENVIRONMENT -GROUND THE SERVICE TO BUILDING STEEL -GROUND ELECTRODE CONDUCTOR SHALL CONNECT TO THE BUS BAR WHERE THE SERVICE GROUNDED CONDUCTOR IS CONNECTED TO; OR INSTALL THE #4 MAIN BONDING JUMPER FROM THE GROUNDED BAR TO THE GROUNDING BAR ON THE LEFT SIDE. THIS WILL ALSO BOND THE ENCLOSURE TO THE SERVICE GROUNDED CONDUCTOR AS REQUIRED PER 250.24(A)(4) AND 250.24(B) -INSTALL A #4 COPPER GEC TO UFER AND BUILDING STEEL PER TABLE 250.66
Occupancy Inspection - Codes Commercial Temporary C of O 9/23/2015 9/23/2015 at 12:00 AM 09/23/2015
Misc
Corrective Action Required
09/23/2015
-OBTAIN FIRE DEPT. APPROVAL
Occupancy Inspection - Planning Passed 09/23/2015
Occupancy Inspection - Fire Passed 9/23/2015 at 12:00 AM 09/23/2015
Occupancy Inspection - Engineering Passed 9/23/2015 at 12:00 AM 09/24/2015
Occupancy Inspection - Codes Commercial Full C of O 9/29/2015 at 12:00 AM 09/29/2015
Misc
Resolved
09/29/2015
-OBTAIN FIRE DEPT. APPROVAL
Documents & Images
Date Uploaded File Type Document Name
05/12/2015 Letter Fire Building Plan Review
05/20/2015 Letter Codes P/R Corrections Document
06/24/2015 Letter Codes Building Permit
06/24/2015 Receipt Receipt for transaction: 2015-003340
07/30/2015 Letter Inspection Summary
09/15/2015 Letter Inspection Summary
09/16/2015 Letter Inspection Summary
09/23/2015 Letter Codes Temporary Certificate of Occupancy
09/29/2015 Letter Field Certificate of Occupancy
09/30/2015 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home