Permit Application Status

PRCOM20150311


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20150311
Building Permit - Commercial
Certificate of Occupancy
LBC DEVELOPMENT CORP
NEW SHELL BUILDING
NEW SHELL BUILDING FOR INDOOR TRAMPOLINE GYMNASIUM Mike Weisenborn 11/06/2015 3:26 PM - SET STATUS TO TEMP CO TO MATCH TENANT FINISH STATUS
02/20/2015
04/22/2015
09/19/2015
02/05/2016
Locations
Contacts
LITTLE DIXIE CONSTRUCTION LLC, Address:1431 CINNAMON HILL LN STE 209, Phone:(573) 449-7200  
TEMP-CON LLC, Address:15670 S KEELER ST, Phone:(913) 768-4888  
S & S ELECTRICAL CONTRACTING LLC, Address:574 NW 1921 RD, Phone:(816) 847-2433  
SUMMIT MECHANICAL INC, Address:5324 ALGOA RD, Phone:(573) 636-4050  
SIMON ASSOCIATES, INC, Address:13 S 6TH STREET, Phone:(573) 874-1818  
LBC DEVELOPMENT CORP, Address:PO BOX 7258  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
LBC INVESTMENTS LLC, Address:302 CAMPUSVIEW DR STE 211  
MARION RIDGE SAFETY STORAGE LLC, Address:1101 C NW PAMELA BLVD  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/16/2015 05/05/2015
Joe Frogge
LC - General Contractor
Resolved
05/05/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
05/05/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Building Plan Review Approved with Conditions 03/23/2015 05/05/2015
Joe Frogge
Final Development Plan
Resolved
05/05/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes. received 5/5/15
Miscellaneous Correction
Resolved
03/24/2015

Size of water meters. Action required: Clarify size of building and irrigation system water meters. Permit fee calculations depend on this information. (note: 2" meter is $23,586.44 while a 1-1/2" meter is $13,177.48) 3/19/15 - letter provided refers to sheet MEP2 which is the electrical utilities. no mention of water meter. 3/24/14 - Per phone convo with architect, the MEP engineer has calculated that at 1-1/2" meter is sufficient.
Miscellaneous Correction
Resolved
03/26/2015

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility. 3/19/15 - Letter of responsibility is to state which special inspector is responsible. i.e. from the special inspector company. 3/26/15 - received
Engineered truss package
Corrective Action Required
03/16/2015

Copies of the superstructure package were not provided at the time of permit application. Action required: Provide superstructure design or request deferral in writing. 3/19/15 - deferred
Misc
Corrective Action Required
03/19/2015

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Comment is for informational purposes. Rail extension to be verified at inspections. 3/19/15 - deferred to tenant
Final Development Plan Review Approved 04/22/2015 05/05/2015
Joe Frogge
Special Inspections Review Approved 03/31/2015
Mike Weisenborn
Fire Plan Review Approved with Conditions 03/23/2015 03/23/2015
Joe Frogge
Misc
Corrective Action Required
03/16/2015

Knox Box is to be located over the FDC
Construction documents for fire alarm systems
Corrective Action Required
03/16/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans, and also show alarm matrix to include duct detection which shall transmit a supervisory signal along with unit shutdown
Construction documents - Fire protection systems
Corrective Action Required
03/16/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Portable fire extinguishers - general
Corrective Action Required
03/16/2015

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide 5lb ABC type fire extinguishers
Misc
Corrective Action Required
03/23/2015

Outside horn strobe to be located over the FDC and shall activate on a waterflow alarm only
Building Plan Review Rejected 03/06/2015 02/25/2015
Joe Frogge
Final Development Plan
Corrective Action Required
02/25/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Miscellaneous Correction
Corrective Action Required
02/25/2015

Size of water meters. Action required: Clarify size of building and irrigation system water meters. Permit fee calculations depend on this information. (note: 2" meter is $23,586.44 while a 1-1/2" meter is $13,177.48)
Miscellaneous Correction
Corrective Action Required
02/25/2015

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility.
Engineered truss package
Corrective Action Required
02/25/2015

Copies of the superstructure package were not provided at the time of permit application. Action required: Provide superstructure design or request deferral in writing.
Misc 13
Corrective Action Required
02/25/2015

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Comment is for informational purposes. Rail extension to be verified at inspections.
Misc 20
Resolved
02/25/2015

Handrails are shown to be installed under separate contract which is the tenant finish immediately following this project. Given that we anticipate a very short interval between projects, the handrails will not have to be installed during shell construction.
License Tax Application
Resolved
03/13/2015

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment for informational purposes. received 3/13/15
Licensed Contractors Rejected 03/06/2015 02/25/2015
Joe Frogge
LC - General Contractor
Corrective Action Required
02/25/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
02/25/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 03/06/2015 02/23/2015
Brian Austerman
Misc
Corrective Action Required
02/23/2015

Knox Box is to be located over the FDC
Construction documents for fire alarm systems
Corrective Action Required
02/23/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans, and also show alarm matrix to include duct detection which shall transmit a supervisory signal along with unit shutdown
Construction documents - Fire protection systems
Corrective Action Required
02/23/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Portable fire extinguishers - general
Corrective Action Required
02/23/2015

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide 5lb ABC type fire extinguishers
Misc
Corrective Action Required
02/23/2015

Outside horn strobe to be located over the FDC and shall activate on a waterflow alarm only
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Shell Building $1,417.16 $1,417.16 Paid 04/22/2015
8350015-Water Meter Fee $2,517.48 $2,517.48 Paid 04/22/2015
8331401-Water Tap Fee $10,660.00 $10,660.00 Paid 04/22/2015
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 04/22/2015
8331507-Sewer Connection Fee $540.00 $540.00 Paid 04/22/2015
8331506-EFHB Maybrook, Full $766.98 $766.98 Paid 04/22/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Partial 7/31/2015 7/31/2015 at 12:00 AM 07/31/2015
Misc
Partial Correction
07/31/2015
TEMPORARY SERVICE ONLY-OK FOR METER RELEASE
Underground Electrical Inspection - Commercial Partial 7/31/2015 at 12:00 AM 07/31/2015
Misc
Partial Correction
07/31/2015
UE OK BELOW: -SERVICE SECONDARY RACEWAYS FROM TRANSFORMER MIDWAY TO BUILDING -LIGHT POLE CIRCUIT AT MIDDLE OF PARKING LOT
Underground Electrical Inspection - Commercial Partial 8/4/2015 8/3/2015 at 12:00 AM 08/03/2015
Misc
Partial Correction
07/31/2015
UE OK BELOW: -SERVICE SECONDARY RACEWAYS FROM TRANSFORMER TO SERVICE LOCATION -LIGHT POLE CIRCUIT AT MIDDLE OF PARKING LOT
Driveway Inspection Passed 10/1/2015 at 12:00 AM 10/02/2015
Sidewalk Inspection Passed 10/1/2015 at 12:00 AM 10/02/2015
Occupancy Inspection - Planning Temporary C of O 12/15/2015
Corrective Action Required
12/15/2015
Parking lot striping needs to be completed.
Corrective Action Required
12/15/2015
Trash enclosure doors need to be installed.
Corrective Action Required
12/15/2015
All construction debis shall be removed from site.
Underground Electrical Inspection - Commercial Passed 12/21/2015
Misc
Resolved
12/21/2015
UE OK BELOW: -SERVICE SECONDARY RACEWAYS FROM TRANSFORMER TO SERVICE LOCATION -LIGHT POLE CIRCUIT AT MIDDLE OF PARKING LOT
Electrical Service Inspection Passed 12/21/2015
Misc
Resolved
12/21/2015
TEMPORARY SERVICE ONLY-OK FOR METER RELEASE
Final Inspection - Commercial Passed 2/4/2016 2/5/2016 02/05/2016
Occupancy Inspection - Codes Commercial Full C of O 02/05/2016
Documents & Images
Date Uploaded File Type Document Name
02/23/2015 Letter Fire Building Plan Review
02/25/2015 Letter Codes P/R Corrections Document
03/23/2015 Letter Codes P/R Corrections Document
03/31/2015 Letter Sky Zone SI Letter of Intent
04/22/2015 Receipt Receipt for transaction: 2015-000665
04/22/2015 Letter Codes Building Permit
07/31/2015 Letter Inspection Summary
07/31/2015 Letter Inspection Summary
08/03/2015 Letter Inspection Summary
12/15/2015 Letter Planning Inspection Summary
02/04/2016 Engineer Report/Study A7152007 - Final SI Letter (1 21 2016) 525452
02/05/2016 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home