Permit Application Status

PRCOM20150014


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20150014
Building Permit - Commercial
Certificate of Occupancy
JOHN KNOX VILLAGE
NEW MULTI-FAMILY
NEW 4-STORY INDEPENDENT LIVING APARTMENT - (COMMONS AREA UNDER SEPARATE PERMIT) - NEW CONSTRUCTION REPLACES APARTMENTS PREVIOUSLY DEMOLISHED
01/06/2015
03/04/2015
08/09/2015
07/08/2016
Locations
Contacts
PARIC CORPORATION , Address:77 WESTORT PLAZA STE 250, Phone:(636) 561-9795  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
UNITED PLUMBING & SERVICE CO INC, Address:301 DUCK RD, Phone:(816) 761-5262  
SFCS ARCHITECTS, Address:1927 SOUTH TRYON ST, SUITE 207, Phone:(704) 372-7327  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 12/31/2015
Joe Dir
Sprinkler Plan Review Released for Construction 05/27/2015
Joe Dir
Misc
Corrective Action Required
05/27/2015

Provide a spare sprinkler head box equiped with spare sprinkler heads and a wrench.
Installation acceptance testing
Corrective Action Required
05/27/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call 816-969-1300 to schedule hydrostatic pressure testing and acceptance flow tests
Misc
Corrective Action Required
05/27/2015

Air compressor for the dry system shall be a UL listed compressor for fire service.
Licensed Contractors Approved 02/10/2015 03/04/2015
Joe Frogge
Building Plan Review Approved with Conditions 02/10/2015 03/04/2015
Joe Frogge
License Tax Application
Carried Forward
03/04/2015

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment for informational purposes. 3/4/15 - deferred
Final Development Plan
Resolved
02/03/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Misc
Corrective Action Required
01/30/2015

2012 IBC Chapter 7. Action required: Provide fire ratings and UL numbers for relevant wall assemblies. Also complete rating portion of door schedules. Wall schedule and door schedule information not consistent with Life Safety plans provided. 2/10/15 - Doors E106, E108 & E109 still not scheduled as fire rated. 3/4/15 - deferred
Misc
Resolved
02/10/2015

2012 IBC 1107.6.2 Group R-2. Accessible units, Type A units, and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1107.6.2.1 through 1107.6.2.2. Action required: Number of Type A units is less than required in Table 1107.6.1.1. Provide additional Type A units or provide letter of explanation/qualification. 2/10/15 - clarified as not applicable
Engineered truss package
Corrective Action Required
01/30/2015

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof and floor truss packages or defer to construction. Approved truss packages must be on site for inspections. 2/10/15 - deferred to construction
Bldg - Guards - Where required 1013.2
Resolved
02/10/2015

2012 IBC 1013.2 – Where required. Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (As amended by the City of Lee’s Summit. See code section for possible exceptions.) Action required: Guard may be required at roof walk-path near roof hatch. Unable to verify on plans. Also, guards may be required at rooftop unites that are within 10' of roof edge. This may be verified at inspection. 2/10/15 - added in addendum
Misc
Corrective Action Required
01/30/2015

2012 IBC 1013.6 Mechanical equipment. Guards shall be provided where appliances, equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. The guard shall extend not less than 30 inches beyond each end of such appliance, equipment, fan, or component. Action required: Comment for informational purposes. May be verified during inspections.
Misc
Resolved
02/10/2015

2012 IBC 718.3 Draftstopping in floors. In combustible construction, draftstopping shall be installed to subdivide floor/ceiling assemblies in the locations prescribed in Sections 718.3.2 through 718.3.3 2012 IBC 718.4 Draftstopping in attics. In combustible construction, draftstopping shall be installed to subdivide attic spaces and concealed roof spaces in the locations prescribed in Sections 718.4.2 and 718.4.3. Ventilation of concealed roof spaces shall be maintained in accordance with Section 1203.2 Action required: Provide draftstopping at relevant locations in floors and attics. 2/10/15 - added in addendum
Screening - Ground mounted equipment
Corrective Action Required
01/30/2015

Planning and Development - Ground mounted equipment - Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Comment for informational purposes. To be verified during inspections.
Misc 20
Resolved
02/10/2015

ICC A117.1-2009 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. Action required: Modify documents to demonstrate how this requirement will be met at spaces under stairs. 2/10/15 - clarified
Bldg - Safety glazing - Hazardous locations 2406.4
Resolved
02/10/2015

2012 IBC 2406.4 - Hazardous locations. The locations specified in Sections 2406.4.1 through 2406.4.7 shall be considered specific hazardous locations requiring safety glazing materials. Action required: Designate or specify locations where safety glazing is required. 2/10/15 - added in addendum
Accessibility - Water closet location 604.2
Corrective Action Required
01/30/2015

ICC A117.1-2009 1003.11.2.4 Water Closet. Water closets shall comply with Section 1003.11.24. 1003.11.2.4.1 Location. The water closet shall be positioned with a wall to the rear and to one side. The centerline of the water closet shall be 16 inches minimum and 18 inches maximum from the sidewall. Action required: Modify accessible restroom designs. 2/10/15 - to be reevaluated as a Codes Modification Request 3/4/15 - deferred
Misc
Resolved
02/10/2015

ICC A117.1-2009 Section 1003.3.2 Turning Space. All rooms served by an accessible route shall provide a turning space complying with Section 304. (See code for exceptions) Section 304.2 Floor Surface. Floor surfaces of a turning space shall comply with Section 302. Changes in level are not permitted within the turning space. (see code for exception) Action required: In accessible units - Provide turning radius inside walk-in closet and provide turning radius in restroom that has no elevation change as there will be at the lip of shower entry. 2/10/15 - drawings updated
Misc
Resolved
02/10/2015

Return/transfer air. Action required: specify or detail how air is returned or transferred out of closed rooms at residential units. 2/10/15 - drawings updated to show under-cutting of doors
Misc
Resolved
02/10/2015

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1 and 2) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. (see code for items 4 and 5) Action required: Relocate restroom exhausts to comply. 2/10/15 - drawings modified
Misc
Resolved
02/10/2015

2012 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision ins made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Protect pipes from potential freezing. Ref: Piping in MEP Room E121. 2/10/15 - electric heater added
Misc
Resolved
02/10/2015

2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit lighting to serve 2nd, 3rd, & 4th floor west stairway. 2/10/15 - added per addendum
Miscellaneous Correction
Resolved
02/10/2015

2011 NEC Article 210.11 (C) (3) Bathroom Branch Circuits. In addition to the number of branch circuits required by other parts of this section, at least one 20-ampere branch circuit shall be provided to supply bathroom receptacle outlet(s). Such circuits shall have no other outlets. Exception: Where the 20-mpere circuit supplies a single bathroom, outlets for other equipment within the same bathroom shall be permitted to be supplied in accordance with 210.23(A)(1) and (A)(2). Action required: Some unit bathroom circuits must be modified to comply. 2/10/15 - altered per addendum
Misc
Resolved
02/10/2015

2011 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be on entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance to the working space shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance3 is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: At MEP Room E121 two exits with panic hardware required. 2/10/15 - clarification per arch that room meets exemptions
Misc 13
Resolved
02/10/2015

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide handrail extension device at roof hatch. 2/10/15 - detail modified
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
02/10/2015

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify drawings at Unit C entry door. Minimum clear space next to latch side of door is 18". 2/10/15 - modified per addendum
Accessibility - Fixed sidewall grab bars 604.5.1
Resolved
05/06/2015

ICC A117.1-2009 604.5.1 – Fixed side wall grab bars. Fixed side-wall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide grab bars in all required locations. 2/10/15 - to be reevaluated as a Codes Modification Request 3/4/15 - deferred 5/5/15 - approved via CMR
Accessibility - Rear wall grab bars 604.5.2
Resolved
05/06/2015

ICC A117.1-2009 604.5.2 – Rear wall grab bars. The rear wall grab bar shall be 36 inches minimum in length, and extend from the centerline of the water closet 12 inches minimum on the side closest to the wall, and 24 inches minimum on the transfer side. (See codes section for possible exceptions.) Action required: Provide grab bars in all required locations. 2/10/15 - to be reevaluated as a Codes Modification Request 3/4/15 - deferred 5/5/15 - approved via CMR
Miscellaneous Correction
Corrective Action Required
01/30/2015

ICC A117.1-2009 Section 1003.11.2.4.1 Location. The water closet shall be positioned with a wall to the rear and to one side. The centerline of the water closet shall be 16 inches minimum and 18 inches maximum from the sidewall. Action required: Modify Accessible Units A & C to comply. 2/10/15 - to be reevaluated as a Codes Modification Request 3/4/15 - deferred
Fire Plan Review Approved with Conditions 02/06/2015 02/10/2015
Brian Austerman
Misc
Corrective Action Required
02/10/2015

Duct detection required for units over 2,000 cfm. Activation shall shut down the unit and transmit a supervisory signal to the alarm panel Show on alarm plans
Construction documents for fire alarm systems
Corrective Action Required
02/10/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide engineer stamped alarm plans for approval
Knox box required
Corrective Action Required
02/10/2015

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Call (816) 969-1300 to obtain a Knox Box application
Construction documents - Fire protection systems
Corrective Action Required
02/10/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide engineer stamped sprinkler plans for approval.
Final Development Plan Review Approved 02/03/2015
Joe Frogge
Fire Plan Review Approved with Conditions 02/06/2015 02/02/2015
Brian Austerman
Misc
Corrective Action Required
01/30/2015

Duct detection required for units over 2,000 cfm. Activation shall shut down the unit and transmit a supervisory signal to the alarm panel
Construction documents for fire alarm systems
Corrective Action Required
01/30/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide engineer stamped alarm plans for approval
Knox box required
Corrective Action Required
01/30/2015

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Call (816) 969-1300 to obtain a Knox Box application
Construction documents - Fire protection systems
Corrective Action Required
01/30/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide engineer stamped sprinkler plans for approval.
Building Plan Review Rejected 01/20/2015 01/16/2015
Joe Frogge
License Tax Application
Corrective Action Required
01/16/2015

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment for informational purposes.
Final Development Plan
Corrective Action Required
01/16/2015

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Misc
Corrective Action Required
01/16/2015

2012 IBC Chapter 7. Action required: Provide fire ratings and UL numbers for relevant wall assemblies. Also complete rating portion of door schedules. Wall schedule and door schedule information not consistent with Life Safety plans provided.
Misc
Corrective Action Required
01/16/2015

2012 IBC 1107.6.2 Group R-2. Accessible units, Type A units, and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1107.6.2.1 through 1107.6.2.2. Action required: Number of Type A units is less than required in Table 1107.6.1.1. Provide additional Type A units or provide letter of explanation/qualification.
Engineered truss package
Corrective Action Required
01/16/2015

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof and floor truss packages or defer to construction. Approved truss packages must be on site for inspections.
Bldg - Guards - Where required 1013.2
Corrective Action Required
01/16/2015

2012 IBC 1013.2 – Where required. Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (As amended by the City of Lee’s Summit. See code section for possible exceptions.) Action required: Guard may be required at roof walk-path near roof hatch. Unable to verify on plans. Also, guards may be required at rooftop unites that are within 10' of roof edge. This may be verified at inspection.
Misc
Corrective Action Required
01/16/2015

2012 IBC 1013.6 Mechanical equipment. Guards shall be provided where appliances, equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. The guard shall extend not less than 30 inches beyond each end of such appliance, equipment, fan, or component. Action required: Comment for informational purposes. May be verified during inspections.
Misc
Corrective Action Required
01/16/2015

2012 IBC 718.3 Draftstopping in floors. In combustible construction, draftstopping shall be installed to subdivide floor/ceiling assemblies in the locations prescribed in Sections 718.3.2 through 718.3.3 2012 IBC 718.4 Draftstopping in attics. In combustible construction, draftstopping shall be installed to subdivide attic spaces and concealed roof spaces in the locations prescribed in Sections 718.4.2 and 718.4.3. Ventilation of concealed roof spaces shall be maintained in accordance with Section 1203.2 Action required: Provide draftstopping at relevant locations in floors and attics.
Screening - Ground mounted equipment
Corrective Action Required
01/16/2015

Planning and Development - Ground mounted equipment - Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Comment for informational purposes. To be verified during inspections.
Misc 20
Corrective Action Required
01/16/2015

ICC A117.1-2009 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. Action required: Modify documents to demonstrate how this requirement will be met at spaces under stairs.
Bldg - Safety glazing - Hazardous locations 2406.4
Corrective Action Required
01/16/2015

2012 IBC 2406.4 - Hazardous locations. The locations specified in Sections 2406.4.1 through 2406.4.7 shall be considered specific hazardous locations requiring safety glazing materials. Action required: Designate or specify locations where safety glazing is required.
Accessibility - Water closet location 604.2
Corrective Action Required
01/16/2015

ICC A117.1-2009 1003.11.2.4 Water Closet. Water closets shall comply with Section 1003.11.24. 1003.11.2.4.1 Location. The water closet shall be positioned with a wall to the rear and to one side. The centerline of the water closet shall be 16 inches minimum and 18 inches maximum from the sidewall. Action required: Modify accessible restroom designs.
Misc
Corrective Action Required
01/16/2015

ICC A117.1-2009 Section 1003.3.2 Turning Space. All rooms served by an accessible route shall provide a turning space complying with Section 304. (See code for exceptions) Section 304.2 Floor Surface. Floor surfaces of a turning space shall comply with Section 302. Changes in level are not permitted within the turning space. (see code for exception) Action required: In accessible units - Provide turning radius inside walk-in closet and provide turning radius in restroom that has no elevation change as there will be at the lip of shower entry.
Misc
Corrective Action Required
01/16/2015

Return/transfer air. Action required: specify or detail how air is returned or transferred out of closed rooms at residential units.
Misc
Corrective Action Required
01/16/2015

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1 and 2) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. (see code for items 4 and 5) Action required: Relocate restroom exhausts to comply.
Misc
Corrective Action Required
01/16/2015

2012 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision ins made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Protect pipes from potential freezing. Ref: Piping in MEP Room E121.
Misc
Corrective Action Required
01/16/2015

2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit lighting to serve 2nd, 3rd, & 4th floor west stairway.
Miscellaneous Correction
Corrective Action Required
01/16/2015

2011 NEC Article 210.11 (C) (3) Bathroom Branch Circuits. In addition to the number of branch circuits required by other parts of this section, at least one 20-ampere branch circuit shall be provided to supply bathroom receptacle outlet(s). Such circuits shall have no other outlets. Exception: Where the 20-mpere circuit supplies a single bathroom, outlets for other equipment within the same bathroom shall be permitted to be supplied in accordance with 210.23(A)(1) and (A)(2). Action required: Some unit bathroom circuits must be modified to comply.
Misc
Corrective Action Required
01/16/2015

2011 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be on entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance to the working space shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance3 is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: At MEP Room E121 two exits with panic hardware required.
Misc 13
Corrective Action Required
01/19/2015

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide handrail extension device at roof hatch.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
01/19/2015

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify drawings at Unit C entry door. Minimum clear space next to latch side of door is 18".
Accessibility - Fixed sidewall grab bars 604.5.1
Corrective Action Required
01/19/2015

ICC A117.1-2009 604.5.1 – Fixed side wall grab bars. Fixed side-wall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide grab bars in all required locations.
Accessibility - Rear wall grab bars 604.5.2
Corrective Action Required
01/19/2015

ICC A117.1-2009 604.5.2 – Rear wall grab bars. The rear wall grab bar shall be 36 inches minimum in length, and extend from the centerline of the water closet 12 inches minimum on the side closest to the wall, and 24 inches minimum on the transfer side. (See codes section for possible exceptions.) Action required: Provide grab bars in all required locations.
Miscellaneous Correction
Corrective Action Required
01/19/2015

ICC A117.1-2009 Section 1003.11.2.4.1 Location. The water closet shall be positioned with a wall to the rear and to one side. The centerline of the water closet shall be 16 inches minimum and 18 inches maximum from the sidewall. Action required: Modify Accessible Units A & C to comply.
Licensed Contractors Rejected 01/20/2015 01/16/2015
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/16/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Special Inspections Review Approved 01/13/2015
Mike Weisenborn
Fire Plan Review Approved with Conditions 01/20/2015 01/08/2015
Brian Austerman
Misc
Corrective Action Required
01/08/2015

Duct detection required for units over 2,000 cfm. Activation shall shut down the unit and transmit a supervisory signal to the alarm panel
Construction documents for fire alarm systems
Corrective Action Required
01/08/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide engineer stamped alarm plans for approval
Knox box required
Corrective Action Required
01/08/2015

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Call (816) 969-1300 to obtain a Knox Box application
Construction documents - Fire protection systems
Corrective Action Required
01/08/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide engineer stamped sprinkler plans for approval.
Misc
Corrective Action Required
01/08/2015

Provide exit signage for the west stairwell on floors 2,3,and 4
Misc
Corrective Action Required
01/08/2015

Exterior water flow alarm shall be an electric horn/strobe.
Misc
Resolved
01/20/2015

[B] 1011.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1011.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1011.5. The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 12 inches (305 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. Provide high and low level exit signage Mike Weisenborn 01/20/2015 9:29 AM - This project is an R-2 occupancy so this section is not applicable.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $33,030.58 $33,030.58 Paid 03/04/2015
Water Meter Fee $2,266.44 $2,266.44 Paid 03/04/2015
Water Tap Fee $21,320.00 $21,320.00 Paid 03/04/2015
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 03/04/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 3/10/2015 3/10/2015 at 12:00 AM 03/10/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/10/2015
-UNDERSLAB APPROVED TO COVER EAST OF ROOMS AE124 AND AE113
Underslab Electrical Inspection - Commercial Partial 3/16/2015 at 12:00 AM 03/16/2015
Misc
Partial Correction
03/16/2015
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: 4" PVC DATACOM CONDUIT UNDER FOOTING @ SOUTH WALL + 10' INSIDE BUILDING;
Underslab Plumbing Inspection - Commercial Partial 3/16/2015 at 12:00 AM 03/16/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/16/2015
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT + ROOF DRAIN PIPING: EAST OF ROOMS AE124 AND AE113; REMAINDER OF BUILDING TO WEST END NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Rough Framing Inspection - Commercial Partial 5/7/2015 at 12:00 AM 05/07/2015
Misc
Partial Correction
05/07/2015
SETTING OF PRE-FAB EXTERIOR AND INTERIOR WALLS AT: 1ST FLOOR - COMPLETED 2ND FLOOR - IN PROGRESS
Rough Framing Inspection - Commercial Partial 5/8/2015 at 12:00 AM 05/08/2015
Misc
Partial Correction
05/07/2015
SETTING OF PRE-FAB EXTERIOR AND INTERIOR WALLS AT: 1ST FLOOR - COMPLETED 2ND FLOOR - IN PROGRESS
Rough Framing Inspection - Commercial Partial 5/11/2015 at 12:00 AM 05/11/2015
Misc
Partial Correction
05/08/2015
SETTING OF PRE-FAB EXTERIOR AND INTERIOR WALLS AT: 1ST FLOOR - COMPLETED 2ND FLOOR - IN PROGRESS
Rough Framing Inspection - Commercial Partial 6/17/2015 at 12:00 AM 06/17/2015
Misc
Partial Correction
05/11/2015
SETTING OF PRE-FAB EXTERIOR AND INTERIOR WALLS AT: 1ST FLOOR - COMPLETED 2ND FLOOR - IN PROGRESS
Rough Framing Inspection - Commercial Partial 7/7/2015 at 12:00 AM 07/07/2015
Misc
Partial Correction
06/17/2015
SETTING OF PRE-FAB EXTERIOR AND INTERIOR WALLS AT: 1ST FLOOR - COMPLETED 2ND FLOOR - IN PROGRESS
Rough Framing Inspection - Commercial Partial 7/22/2015 at 12:00 AM 07/22/2015
Misc
Partial Correction
07/07/2015
SETTING OF PRE-FAB EXTERIOR AND INTERIOR WALLS AT: 1ST FLOOR - COMPLETED 2ND FLOOR - IN PROGRESS
Underground Electrical Inspection - Commercial Partial 7/24/2015 7/24/2015 at 12:00 AM 07/24/2015
Misc
Partial Correction
07/24/2015
TWO TEMPORARY CONDUITS BORED FROM XFMR LOCATION TO NEW BUILDING.
Misc
Partial Correction
07/24/2015
FOUR 4" + TWO 3" PERMANENT PVC CONDUITS OK TO COVER FROM XFMR LOCATION TO 30' SOUTH TOWARD NEW BUILDING;
Underslab Electrical Inspection - Commercial Passed 3/16/2015 at 12:00 AM 07/27/2015
Misc
Resolved
07/27/2015
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: 4" PVC DATACOM CONDUIT UNDER FOOTING @ SOUTH WALL + 10' INSIDE BUILDING;
Underslab Plumbing Inspection - Commercial Passed 3/16/2015 at 12:00 AM 07/27/2015
THE FOLLOWING AREAS ARE APPROVED
Resolved
07/27/2015
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT + ROOF DRAIN PIPING: EAST OF ROOMS AE124 AND AE113; REMAINDER OF BUILDING TO WEST END NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
All Rough Inspection - Commercial Partial 7/30/2015 7/30/2015 at 12:00 AM 07/30/2015
Misc
Partial Correction
07/30/2015
1ST FLOOR: ABOVE-CEILING: EXTERIOR WALLS: DEMISING WALLS:
Misc
Corrective Action Required
07/30/2015
2ND FLOOR: CORRIDOR ABOVE-CEILING:
All Rough Inspection - Commercial Not Ready 7/31/2015 at 12:00 AM 07/31/2015
Misc
Partial Correction
07/30/2015
1ST FLOOR: NO CHANGE FROM 7/30. PLUMBING CONTRACTOR NOT READY AT EXTERIOR WALLS (BOCA PLATES, ETC). ELECTRICAL CONTRACTOR SAYS SHIELD PLATES ON ORDER.
Misc
Corrective Action Required
07/30/2015
2ND FLOOR: CORRIDOR ABOVE-CEILING: FIRE-CAULKING OF WALL PENETRATIONS IN JOIST BAYS NOT COMPLETED
All Rough Inspection - Commercial Partial 8/3/2015 at 12:00 AM 08/03/2015
Misc
Partial Correction
07/31/2015
1ST FLOOR: OK TO COVER EXTERIOR WALLS ONLY
Misc
Partial Correction
08/03/2015
2ND FLOOR: OK TO COVER CORRIDOR CEILING
All Rough Inspection - Commercial Partial 8/4/2015 at 12:00 AM 08/04/2015
Misc
Partial Correction
08/03/2015
1ST FLOOR: OK TO COVER EXTERIOR AND INTERIOR WALLS
All Rough Inspection - Commercial Partial 8/5/2015 at 12:00 AM 08/05/2015
Rated Assembly Inspection Partial 8/6/2015 at 12:00 AM 08/06/2015
Misc
Corrective Action Required
08/06/2015
1ST FLOOR:
Misc
Partial Correction
08/06/2015
2ND FLOOR: CORRIDOR CEILING SINGLE LAYER 5/8" TYPE X GWB OK TAPE, MUD, & FIRE-SEAL.
Misc
Corrective Action Required
08/06/2015
3RD FLOOR:
All Rough Inspection - Commercial Partial 8/6/2015 8/10/2015 at 12:00 AM 08/10/2015
Misc
Partial Correction
08/10/2015
1ST FLOOR: OK TO COVER EXTERIOR WALLS; UNIT WALLS;
Misc
Partial Correction
08/10/2015
2ND FLOOR: OK TO COVER CORRIDOR CEILING
Misc
Corrective Action Required
08/10/2015
3RD FLOOR: OK TO COVER CORRIDOR CEILING
All Rough Inspection - Commercial Partial 8/13/2015 at 12:00 AM 08/13/2015
Misc
Partial Correction
08/10/2015
1ST FLOOR: OK TO COVER EXTERIOR WALLS; UNIT WALLS;
Misc
Partial Correction
08/10/2015
2ND FLOOR: OK TO COVER CORRIDOR CEILING; AFTER ALL HOLD-DOWNS ARE TORQUED AND ALL FIRE-BLOCKING IS FULLY SEALED, OK TO COVER WALLS EXCEPT AT ELECTRICAL PANELS;
Misc
Corrective Action Required
08/10/2015
3RD FLOOR: OK TO COVER CORRIDOR CEILING
Rated Assembly Inspection Partial 8/13/2015 8/13/2015 at 12:00 AM 08/13/2015
Misc
Partial Correction
08/13/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
08/06/2015
2ND FLOOR: CORRIDOR CEILING SINGLE LAYER 5/8" TYPE X GWB OK TAPE, MUD, & FIRE-SEAL.
Misc
Partial Correction
08/13/2015
3RD FLOOR: CORRIDOR CEILING SINGLE LAYER 5/8" TYPE X GWB OK TAPE, MUD, & FIRE-SEAL. NOTE: PENETRATION BY 4" PVC DRAIN LINE NOT APPROVED. REFER TO DRAWINGS/SPECS OR REQUEST WRITTEN DIRECTION FROM A/E.
All Rough Inspection - Commercial Partial 8/17/2015 8/17/2015 at 12:00 AM 08/17/2015
Misc
Partial Correction
08/13/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS;
Misc
Partial Correction
08/13/2015
2ND FLOOR: OK TO COVER CORRIDOR CEILING; AFTER ALL HOLD-DOWNS ARE TORQUED AND ALL FIRE-BLOCKING IS FULLY SEALED, OK TO COVER WALLS EXCEPT AT ELECTRICAL PANELS;
Misc
Partial Correction
08/17/2015
3RD FLOOR: OK TO COVER CORRIDOR CEILING
All Rough Inspection - Commercial Partial 8/18/2015 at 12:00 AM 08/18/2015
Misc
Partial Correction
08/17/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS;
Misc
Partial Correction
08/17/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; AFTER ALL HOLD-DOWNS ARE TORQUED AND ALL FIRE-BLOCKING IS FULLY SEALED, OK TO COVER WALLS INCLUDING AT ELECTRICAL PANELS;
Misc
Partial Correction
08/17/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING;
All Rough Inspection - Commercial Partial 8/20/2015 at 12:00 AM 08/20/2015
Misc
Partial Correction
08/18/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111;
Misc
Partial Correction
08/18/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; AFTER ALL HOLD-DOWNS ARE TORQUED AND ALL FIRE-BLOCKING IS FULLY SEALED, OK TO COVER WALLS INCLUDING AT ELECTRICAL PANELS;
All Rough Inspection - Commercial Partial 8/21/2015 8/21/2015 at 12:00 AM 08/21/2015
Misc
Partial Correction
08/20/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111;
Misc
Partial Correction
08/20/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
08/21/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
08/21/2015
4TH FLOOR: OK TO PRE-ROCK FOR HVAC DUCT AT BALCONY DOOR RECESSES AT E-412; E-414; E-423; E-427
Rated Assembly Inspection Partial 8/21/2015 8/21/2015 at 12:00 AM 08/21/2015
Misc
Partial Correction
08/13/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
08/13/2015
2ND FLOOR: CORRIDOR CEILING SINGLE LAYER 5/8" TYPE X GWB OK TAPE, MUD, & FIRE-SEAL.
Rated Assembly Inspection Partial 8/25/2015 at 12:00 AM 08/25/2015
Misc
Partial Correction
08/25/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
08/25/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT FOLLOWING UNITS EXCEPT CEILINGS AT SHOWERS AND BALCONY DOOR RECESSES: 201; 212; 214; 222; 223; 224; 227; 232; 233;
Rated Assembly Inspection Partial 8/27/2015 at 12:00 AM 08/27/2015
Misc
Partial Correction
08/27/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
08/27/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
All Rough Inspection - Commercial Partial 8/28/2015 8/28/2015 at 12:00 AM 08/28/2015
Misc
Partial Correction
08/21/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111;
Misc
Partial Correction
08/21/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
08/21/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
08/28/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Rated Assembly Inspection Partial 8/28/2015 at 12:00 AM 08/28/2015
Misc
Partial Correction
08/27/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
08/27/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Sprinkler - Hydrostatic Test Passed 8/31/2015 at 12:00 AM 08/31/2015
Rated Assembly Inspection Partial 8/31/2015 8/25/2015 at 12:00 AM 08/31/2015
Misc
Partial Correction
08/25/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Rated Assembly Inspection Partial 8/31/2015 at 12:00 AM 08/31/2015
Misc
Partial Correction
08/31/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
08/31/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS; WALLS AND CEILINGS (EXCEPT SHOWER CEILINGS) AT UNITS 317; 318; 323; [314; 315;
Misc
Partial Correction
08/31/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS
Rated Assembly Inspection Partial 9/1/2015 9/1/2015 at 12:00 AM 09/01/2015
Misc
Partial Correction
08/31/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
08/31/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/01/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS; WALLS AND CEILINGS (EXCEPT SHOWER CEILINGS) AT UNITS 317; 318; 323; [314; 315; STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
09/01/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS
Rated Assembly Inspection Partial 9/3/2015 at 12:00 AM 09/03/2015
Misc
Partial Correction
09/03/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/03/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/03/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 314; 315; 317; 318; 323; 302 EXCEPT CORR WALL @ ROOF DRAIN; 311; 321; 324; 327; 332*; 333; * STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
09/03/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS
Rated Assembly Inspection Partial 9/3/2015 at 12:00 AM 09/03/2015
Misc
Partial Correction
09/03/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/03/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/03/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 314; 315; 317; 318; 323; [302 EXCEPT CORR WALL @ ROOF DRAIN; 311; 321; 324; 327; 332*; 333; * STAIRWELL WALLS NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 9/3/2015 9/1/2015 at 12:00 AM 09/04/2015
Misc
Partial Correction
09/01/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/01/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/01/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS; WALLS AND CEILINGS (EXCEPT SHOWER CEILINGS) AT UNITS 317; 318; 323; [314; 315; STAIRWELL WALLS NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 9/3/2015 at 12:00 AM 09/04/2015
Misc
Partial Correction
09/03/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/03/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Rated Assembly Inspection Partial 9/4/2015 at 12:00 AM 09/04/2015
Misc
Partial Correction
09/04/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/04/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/04/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 314; 315; 317; 318; 323; 302 EXCEPT CORR WALL @ ROOF DRAIN; 311; 321; 324; 327; 332*; 333; [313; CORRIDOR WALLS (FIRE CAULK REQUIRED AT RAW TOP EDGE) EXCEPT TWO LOCATIONS WHERE PERMANENT ROOF DRAIN IS IN PROGRESS; * STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Corrective Action Required
09/04/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: ELECT & DATA RMS WALLS
Underground Plumbing Inspection - Commercial Passed 9/8/2015 9/9/2015 at 12:00 AM 09/09/2015
Rated Assembly Inspection Not Ready 9/8/2015 9/9/2015 at 12:00 AM 09/09/2015
Misc
Partial Correction
09/04/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/04/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/04/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 314; 315; 317; 318; 323; 302 EXCEPT CORR WALL @ ROOF DRAIN; 311; 321; 324; 327; 332*; 333; [313; CORRIDOR WALLS (FIRE CAULK REQUIRED AT RAW TOP EDGE) EXCEPT TWO LOCATIONS WHERE PERMANENT ROOF DRAIN IS IN PROGRESS; * STAIRWELL WALLS NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 9/11/2015 9/11/2015 at 12:00 AM 09/11/2015
Misc
Partial Correction
09/09/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS. NO COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/09/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/09/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS EXCEPT AT ROOF DRAINS; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Corrective Action Required
09/11/2015
FIRE-STOPPING AT ROOF DRAIN LOCATIONS SUBJECT TO INSPECTION WHEN READY
Rated Assembly Inspection Partial 9/14/2015 9/14/2015 at 12:00 AM 09/14/2015
Misc
Partial Correction
09/11/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS; ELEVATOR MACHINE ROOM; NO OTHER COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/11/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/11/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS EXCEPT AT ROOF DRAINS; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Corrective Action Required
09/11/2015
FIRE-STOPPING AT ROOF DRAIN LOCATIONS SUBJECT TO INSPECTION WHEN READY
Rated Assembly Inspection Partial 9/17/2015 9/17/2015 at 12:00 AM 09/17/2015
Misc
Partial Correction
09/14/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS; ELEVATOR MACHINE ROOM; NO OTHER COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/14/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/14/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS EXCEPT AT ROOF DRAINS; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
09/17/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; *CONDITION: CHASE TO BE CONSTRUCTED AT FIRE SPRINKLER LINES
Rated Assembly Inspection Partial 9/22/2015 at 12:00 AM 09/22/2015
Misc
Partial Correction
09/22/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS; ELEVATOR MACHINE ROOM; NO OTHER COMMON OR UTILITY AREAS PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/22/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/22/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS EXCEPT AT ROOF DRAINS; NO ISSUES FOUND (SUBJECT TO RE-DESIGN PENDING) ON OSB WALL SHEATHING AT: 315 EAST WALL 317 WEST WALL *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
09/22/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY EXCEPT PENETRATIONS TO BE UL CONFORMING; E428; E429; NO ISSUES FOUND (SUBJECT TO RE-DESIGN PENDING) ON OSB WALL SHEATHING AT: 415 EAST WALL 417 WEST WALL *CONDITION: CHASE TO BE CONSTRUCTED AT FIRE SPRINKLER LINES
All Rough Inspection - Commercial Partial 9/23/2015 at 12:00 AM 09/23/2015
Misc
Partial Correction
08/28/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111; ABOVE-CEILING AND OSB WALL SHEATHING OK TO COVER WHEN READY AT 119 & 120 EXCEPT DO NOT COVER PENETRATIONS UNTIL APPROVED PER UL DESIGN TO BE SPECIFIED BY A/E;
Misc
Partial Correction
08/28/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
08/28/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
08/28/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Rated Assembly Inspection Partial 9/23/2015 at 12:00 AM 09/23/2015
Misc
Partial Correction
09/23/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT STAIRWELL WALLS; ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS EXCEPT PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E; PRE-ROCK: UNIT 113: GWB WALL AT DEAD SPACE ADJACENT TO CORRIDOR; UNIT 112: LID OF CLOSET AT EXT WALL; UNIT 132: CEILING ABOVE HVAC DUCT AT BR; UNITS 101 & 102: CORR WALL @ COAT CLO;
Misc
Partial Correction
09/23/2015
2ND FLOOR: OK TO TAPE, MUD & FIRE-STOP: - CORRIDOR CEILING AND WALLS ONE LAYER 5/8" TYPE X GWB - RATED CEILINGS AND WALLS AT ALL UNITS EXCEPT WALLS AT STAIRWELLS
Misc
Partial Correction
09/23/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS EXCEPT AT ROOF DRAINS; NO ISSUES FOUND (SUBJECT TO RE-DESIGN PENDING) ON OSB WALL SHEATHING AT: 315 EAST WALL 317 WEST WALL *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
09/23/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY EXCEPT PENETRATIONS TO BE UL CONFORMING; E428; E429; NO ISSUES FOUND (SUBJECT TO RE-DESIGN PENDING) ON OSB WALL SHEATHING AT: 415 EAST WALL 417 WEST WALL *CONDITION: CHASE TO BE CONSTRUCTED AT FIRE SPRINKLER LINES
All Rough Inspection - Commercial Partial 9/28/2015 at 12:00 AM 09/28/2015
Misc
Partial Correction
09/23/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111; ABOVE-CEILING AND OSB WALL SHEATHING OK TO COVER WHEN READY AT 119 & 120 EXCEPT DO NOT COVER PENETRATIONS UNTIL APPROVED PER UL DESIGN TO BE SPECIFIED BY A/E;
Misc
Partial Correction
09/23/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
09/23/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
09/23/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
09/30/2015
OK TO COVER WHEN READY OSB SHEAR WALL SHEATHING AT: EAST STAIRWELL FULL HEIGHT; WEST STAIRWELL 3RD & 4TH LEVELS;
Rated Assembly Inspection Partial 9/30/2015 at 12:00 AM 09/30/2015
Misc
Partial Correction
09/30/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
09/30/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
09/30/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
09/30/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; [411; 419; 420;
Misc
Corrective Action Required
09/30/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
All Rough Inspection - Commercial Partial 9/30/2015 at 12:00 AM 09/30/2015
Misc
Partial Correction
09/28/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111; ABOVE-CEILING AND OSB WALL SHEATHING OK TO COVER WHEN READY AT 119 & 120 EXCEPT DO NOT COVER PENETRATIONS UNTIL APPROVED PER UL DESIGN TO BE SPECIFIED BY A/E;
Misc
Partial Correction
09/28/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
09/28/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
09/28/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
09/30/2015
OK TO COVER WHEN READY OSB SHEAR WALL SHEATHING AT: EAST STAIRWELL FULL HEIGHT; WEST STAIRWELL FULL HEIGHT
All Rough Inspection - Commercial Partial 10/2/2015 at 12:00 AM 10/02/2015
Misc
Partial Correction
09/30/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111; ABOVE-CEILING AND OSB WALL SHEATHING OK TO COVER WHEN READY AT 119 & 120 EXCEPT DO NOT COVER PENETRATIONS UNTIL APPROVED PER UL DESIGN TO BE SPECIFIED BY A/E;
Misc
Partial Correction
09/30/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
09/30/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
09/30/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
09/30/2015
OK TO COVER WHEN READY OSB SHEAR WALL SHEATHING AT: EAST STAIRWELL FULL HEIGHT; WEST STAIRWELL FULL HEIGHT; EAST & WEST WALLS AT SPACES 128 & 129;
Rated Assembly Inspection Not Ready 10/6/2015 10/6/2015 at 12:00 AM 10/06/2015
Misc
Partial Correction
09/30/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
09/30/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
09/30/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
09/30/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; [411; 419; 420;
Misc
Corrective Action Required
09/30/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
All Rough Inspection - Commercial Partial 10/7/2015 at 12:00 AM 10/07/2015
Misc
Partial Correction
10/07/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111; ABOVE-CEILING AND OSB WALL SHEATHING OK TO COVER WHEN READY AT 119 & 120 EXCEPT DO NOT COVER PENETRATIONS UNTIL APPROVED PER UL DESIGN TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/07/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
10/07/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
10/07/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
10/07/2015
OK TO COVER WHEN READY OSB SHEAR WALL SHEATHING AT: EAST STAIRWELL FULL HEIGHT; WEST STAIRWELL FULL HEIGHT; EAST & WEST WALLS AT SPACES 128 & 129;
Misc
Partial Correction
10/07/2015
OK TO COVER WHEN READY ELEVATOR LOBBY CEILINGS AND WALLS AT 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
All Rough Inspection - Commercial Partial 10/9/2015 10/9/2015 at 12:00 AM 10/09/2015
Misc
Partial Correction
10/07/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111; ABOVE-CEILING AND OSB WALL SHEATHING OK TO COVER WHEN READY AT 119 & 120 EXCEPT DO NOT COVER PENETRATIONS UNTIL APPROVED PER UL DESIGN TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/07/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
10/07/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
10/07/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
10/07/2015
OK TO COVER WHEN READY OSB SHEAR WALL SHEATHING AT: EAST STAIRWELL FULL HEIGHT; WEST STAIRWELL FULL HEIGHT; EAST & WEST WALLS AT SPACES 128 & 129;
Misc
Partial Correction
10/07/2015
OK TO COVER WHEN READY ELEVATOR LOBBY CEILINGS AND WALLS AT 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR
Rated Assembly Inspection Partial 10/9/2015 10/9/2015 at 12:00 AM 10/09/2015
Misc
Partial Correction
10/06/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/06/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/06/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/06/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Corrective Action Required
10/06/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Rated Assembly Inspection Partial 10/12/2015 10/12/2015 at 12:00 AM 10/12/2015
Misc
Partial Correction
10/09/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/09/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/09/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/09/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/12/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/12/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Rated Assembly Inspection Partial 10/19/2015 10/19/2015 at 12:00 AM 10/15/2015
Misc
Partial Correction
10/12/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/12/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/12/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/12/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/12/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/12/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/15/2015
RATED WALLS AT STAIRWELL SHAFTS: 1" SHAFT LINER IN PLACE FROM 1ST FLR TO 3RD FLR ELEVATION MUST BE FIRE-STOPPED AT ALL PENETRATIONS, HOLES AND JOINT GAPS -- CALL FOR RE-INSPECTION WHEN READY
All Rough Inspection - Commercial Partial 10/15/2015 at 12:00 AM 10/15/2015
Misc
Partial Correction
10/15/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111; ABOVE-CEILING AND OSB WALL SHEATHING OK TO COVER WHEN READY AT 119 & 120 EXCEPT DO NOT COVER PENETRATIONS UNTIL APPROVED PER UL DESIGN TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/15/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Partial Correction
10/15/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
10/15/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Partial Correction
10/15/2015
OK TO COVER WHEN READY OSB SHEAR WALL SHEATHING AT: EAST STAIRWELL FULL HEIGHT; WEST STAIRWELL FULL HEIGHT; EAST & WEST WALLS AT SPACES 128 & 129;
Misc
Partial Correction
10/15/2015
OK TO COVER WHEN READY ELEVATOR LOBBY CEILINGS AND WALLS AT 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR INCLUDING OSB AT WEST WALL
Underground Electrical Inspection - Commercial Partial 10/15/2015 at 12:00 AM 10/15/2015
Misc
Partial Correction
07/24/2015
TWO TEMPORARY CONDUITS BORED FROM XFMR LOCATION TO NEW BUILDING.
Misc
Partial Correction
07/24/2015
PERMANENT PVC CONDUITS OK TO COVER FROM XFMR LOCATION TO 30' SOUTH TOWARD NEW BUILDING;
Misc
Partial Correction
10/15/2015
OK TO COVER WHEN READY SEVEN 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM BULDING ENTRY TO SHORT OF SWEEPS AT TRANSFORMER PAD LOCATION
Underground Electrical Inspection - Commercial Passed 10/17/2015 at 12:00 AM 10/17/2015
Misc
Resolved
10/17/2015
TWO TEMPORARY CONDUITS BORED FROM XFMR LOCATION TO NEW BUILDING.
Misc
Resolved
10/17/2015
FOUR 4" + TWO 3" PERMANENT PVC CONDUITS OK TO COVER FROM XFMR LOCATION TO 30' SOUTH TOWARD NEW BUILDING;
Underground Electrical Inspection - Commercial Passed 10/20/2015 10/20/2015 at 12:00 AM 10/20/2015
Misc
Resolved
10/20/2015
TWO TEMPORARY CONDUITS BORED FROM XFMR LOCATION TO NEW BUILDING.
Misc
Resolved
10/20/2015
PERMANENT PVC CONDUITS OK TO COVER FROM XFMR LOCATION TO 30' SOUTH TOWARD NEW BUILDING;
Misc
Resolved
10/20/2015
OK TO COVER WHEN READY SEVEN 4" PVC SECONDARY ELECTRICAL SERVICE CONDUITS FROM BULDING ENTRY TO SHORT OF SWEEPS AT TRANSFORMER PAD LOCATION
Rated Assembly Inspection Partial 10/21/2015 10/21/2015 at 12:00 AM 10/21/2015
Misc
Partial Correction
10/15/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/15/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/15/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/15/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/15/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/15/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/15/2015
RATED WALLS AT STAIRWELL SHAFTS: 1" SHAFT LINER IN PLACE AT EAST & WEST STAIR TOWERS FROM 1ST FLR TO 4TH FLR ELEVATION. FIRE-STOP ALL PENETRATIONS, HOLES AND JOINT GAPS -- CALL FOR RE-INSPECTION WHEN READY
Electrical Service Inspection Passed 10/22/2015 10/22/2015 at 12:00 AM 10/22/2015
Rated Assembly Inspection Partial 10/22/2015 10/22/2015 at 12:00 AM 10/22/2015
Misc
Partial Correction
10/21/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/21/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/21/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/21/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/21/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/21/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/21/2015
RATED WALLS AT STAIRWELL SHAFTS: OK TO COVER WHEN READY 1" SHAFT LINER IN PLACE AT EAST & WEST STAIR TOWERS FROM 1ST FLR TO 4TH FLR ELEVATION.Y
Rough Electrical Inspection - Commercial Partial 10/23/2015 10/23/2015 at 12:00 AM 10/23/2015
Misc
Partial Correction
10/23/2015
FEEDER TERMINATIONS AT FLOOR DISTRIBUTION PANELS: NO ISSUES FOUND AT PANELS 1D, 2D;
Rough Framing Inspection - Commercial Passed 7/22/2015 at 12:00 AM 10/23/2015
All Rough Inspection - Commercial Passed 10/15/2015 at 12:00 AM 10/23/2015
Misc
Resolved
10/23/2015
1ST FLOOR: OK TO COVER WHEN READY: EXTERIOR WALLS; UNIT WALLS; CORRIDOR CEILING AND WALLS; CEILING AT SPACE 111; ABOVE-CEILING AND OSB WALL SHEATHING OK TO COVER WHEN READY AT 119 & 120 EXCEPT DO NOT COVER PENETRATIONS UNTIL APPROVED PER UL DESIGN TO BE SPECIFIED BY A/E;
Misc
Resolved
10/23/2015
2ND FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT ELEVATOR LOBBY
Misc
Resolved
10/23/2015
3RD FLOOR: OK TO COVER WHEN READY: CORRIDOR CEILING; ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Resolved
10/23/2015
4TH FLOOR: COMPLETION OF WALL CAVITY FIRE-BLOCKING IN PROGRESS. SHIELD/BOCA PLATING OF PLUMBING LINES IN PROGRESS. OK TO COVER WHEN READY ALL CEILINGS & WALLS EXCEPT AT STAIRWELLS & ELEVATOR LOBBY
Misc
Resolved
10/23/2015
OK TO COVER WHEN READY OSB SHEAR WALL SHEATHING AT: EAST STAIRWELL FULL HEIGHT; WEST STAIRWELL FULL HEIGHT; EAST & WEST WALLS AT SPACES 128 & 129;
Misc
Resolved
10/23/2015
OK TO COVER WHEN READY ELEVATOR LOBBY CEILINGS AND WALLS AT 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR INCLUDING OSB AT WEST WALL
Rated Assembly Inspection Partial 10/27/2015 10/27/2015 at 12:00 AM 10/27/2015
Misc
Partial Correction
10/22/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/22/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/22/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/22/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/22/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/22/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/22/2015
RATED WALLS AT STAIRWELL SHAFTS: EAST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; WEST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB 1ST & 2ND LEVELS;
Partial Correction
10/27/2015
-WEST TOWER, FIRST LAYER APPROVED 1ST AND 2ND FLOOR. -EAST TOWER, FIRST LAYER APPROVED ALL FLOURS.
Rough Electrical Inspection - Commercial Partial 10/27/2015 10/27/2015 at 12:00 AM 10/27/2015
Misc
Partial Correction
10/23/2015
FEEDER TERMINATIONS AT FLOOR DISTRIBUTION PANELS: NO ISSUES FOUND AT PANELS 1D, 2D;
Misc
Partial Correction
10/27/2015
INSEPCTED AND APPROVED 3RD AND 4TH FLOOR MAIN DISTRUBUTION PANELS AND SUB-PANELS IN UNITS.
Above Ceiling Inspection Not Ready 10/28/2015 10/28/2015 at 12:00 AM 10/28/2015
Misc
Corrective Action Required
10/28/2015
MAIN CORRIDOR AT LEVELS 2 & 3: FIRE-STOP ALL OPENINGS AND PENETRATIONS AT WALLS AND CEILINGS; THEN REQUEST INSPECTION.
Rated Assembly Inspection Partial 10/28/2015 at 12:00 AM 10/28/2015
Misc
Partial Correction
10/27/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/27/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/27/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/27/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/27/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/27/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Rated Assembly Inspection Partial 10/28/2015 at 12:00 AM 10/28/2015
Misc
Partial Correction
10/28/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/28/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/28/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/28/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/28/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/28/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Rated Assembly Inspection Partial 10/28/2015 at 12:00 AM 10/28/2015
Misc
Partial Correction
10/28/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/28/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/28/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/28/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/28/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/28/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Rated Assembly Inspection Partial 10/28/2015 at 12:00 AM 10/28/2015
Misc
Partial Correction
10/28/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/28/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/28/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/28/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/28/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Corrective Action Required
10/28/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Rated Assembly Inspection Partial 10/28/2015 at 12:00 AM 10/28/2015
Misc
Partial Correction
10/28/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Partial Correction
10/28/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Partial Correction
10/28/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Partial Correction
10/28/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Partial Correction
10/28/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Resolved
10/28/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/28/2015
RATED WALLS AT STAIRWELL SHAFTS: EAST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; WEST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB 1ST & 2ND LEVELS;
Rated Assembly Inspection Partial 10/29/2015 10/29/2015 at 12:00 AM 10/29/2015
Misc
Resolved
10/28/2015
1ST FLOOR: OK TO TAPE, MUD & FIRE-STOP: RATED CEILINGS AND WALLS AT ALL UNITS ELEVATOR MACHINE ROOM; E108; CORRIDOR CEILING AND WALLS; 119 EXCEPT SOUTH WALL; 120 EXCEPT NORTH WALL;
Misc
Resolved
10/28/2015
2ND FLOOR: OK TO TAPE, MUD & FIRESTOP: CORRIDOR CEILING AND WALLS; RATED CEILINGS AND WALLS AT: ALL UNITS; 208; 219; 220;
Misc
Resolved
10/28/2015
3RD FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: CORRIDOR CEILING; ELECT & DATA RMS WALLS. WALLS AND CEILINGS AT UNITS 302*; 311; 312*; 313; 314; 315; 317; 318; 321; 323; 324; 327; 332; 333; CORRIDOR WALLS; 319; 320; *EXCEPT ROOF DRAINS & STAIRWELL WALLS STAIRWELL WALLS NOT READY FOR INSPECTION
Misc
Resolved
10/28/2015
4TH FLOOR: OK TO TAPE, MUD & FIRE-STOP ONE LAYER 5/8" TYPE X GWB AT: UNITS 412; 413*; 414*; 423; 424; 427*; CORRIDOR WALLS ONLY ; E428; E429; 411; 419; 420; CORRIDOR CEILING
Misc
Resolved
10/28/2015
OK TO TAPE, MUD AND FIRE-SEAL CEILINGS AND WALLS AT ELEVATOR LOBBIES AT: 4TH FLR; 3RD FLR; 2ND FLR;
Misc
Resolved
10/28/2015
PROTECTION OF PENETRATIONS TO BE SPECIFIED BY A/E;
Misc
Partial Correction
10/28/2015
RATED WALLS AT STAIRWELL SHAFTS: EAST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; WEST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT, WITH JOINT GAPS BEING FILLED AS PART OF PROCESS;
Above Ceiling Inspection Partial 10/29/2015 at 12:00 AM 10/29/2015
Misc
Partial Correction
10/29/2015
OK TO COVER WHEN READY CEILINGS AT MAIN CORRIDORS AT: LEVEL 2 EXCEPT ONE PENETRATION AT WEST END; AT LEVEL 3 FIRE-STOP ALL OPENINGS AND PENETRATIONS AT WALLS AND CEILINGS;
Rated Assembly Inspection Partial 10/30/2015 10/30/2015 at 12:00 AM 10/30/2015
Misc
Partial Correction
10/29/2015
RATED WALLS AT STAIRWELL SHAFTS: EAST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; 2ND LAYER 1/2" GWB FULL HEIGHT WEST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; EAST WALL ONLY 2ND LAYER 1/2" GWB FULL HEIGHT
Above Ceiling Inspection Partial 11/2/2015 11/2/2015 at 12:00 AM 11/02/2015
Misc
Partial Correction
10/29/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: AT LEVEL 3 OK TO PLACE TILE EAST OF LOW-VOLTAGE ROOM + 3" BORDERS OK; FIRE-STOP ALL OPENINGS AND PENETRATIONS AT WALLS AND CEILINGS WEST OF THERE AT LEVEL 2 BORDERS <=3" OK;
Rated Assembly Inspection Partial 11/2/2015 at 12:00 AM 11/02/2015
Misc
Partial Correction
10/30/2015
RATED WALLS AT STAIRWELL SHAFTS: EAST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; 2ND LAYER 1/2" GWB FULL HEIGHT; OK TO INSTALL FINISH LAYER 5/8" TYPE X GWB; WEST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; EAST WALL ONLY 2ND LAYER 1/2" GWB FULL HEIGHT
Above Ceiling Inspection Not Ready 11/3/2015 11/3/2015 at 12:00 AM 11/03/2015
Misc
Partial Correction
11/02/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: AT LEVEL 3 OK TO PLACE TILE EAST OF LOW-VOLTAGE ROOM + 3" BORDERS OK; FIRE-STOP ALL OPENINGS AND PENETRATIONS AT WALLS AND CEILINGS WEST OF THERE AT LEVEL 2 BORDERS <=3" OK;
Rated Assembly Inspection Partial 11/3/2015 11/3/2015 at 12:00 AM 11/03/2015
Misc
Partial Correction
11/02/2015
RATED WALLS AT STAIRWELL SHAFTS: EAST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; 2ND LAYER 1/2" GWB FULL HEIGHT; OK TO INSTALL FINISH LAYER 5/8" TYPE X GWB; WEST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; EAST WALL ONLY 2ND LAYER 1/2" GWB FULL HEIGHT; OK TO INSTALL FINISH LAYER 5/8" TYPE X GWB;
Above Ceiling Inspection Partial 11/4/2015 11/4/2015 at 12:00 AM 11/04/2015
Misc
Partial Correction
11/03/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: AT LEVEL 3 OK TO PLACE TILE EXCEPT AT LOW VOLTAGE ROOM WHERE STEEL SLEEVES PENETRATE WALL AT LEVEL 2 BORDERS <=3" OK;
Rated Assembly Inspection Partial 11/4/2015 at 12:00 AM 11/04/2015
Misc
Partial Correction
11/03/2015
RATED WALLS AT STAIRWELL SHAFTS: EAST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; 2ND LAYER 1/2" GWB FULL HEIGHT; OK TO INSTALL FINISH LAYER 5/8" TYPE X GWB; WEST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; EAST WALL ONLY 2ND LAYER 1/2" GWB FULL HEIGHT; OK TO INSTALL FINISH LAYER 5/8" TYPE X GWB ALL WALLS FULL HEIGHT
Rated Assembly Inspection Not Ready 11/9/2015 11/9/2015 at 12:00 AM 11/09/2015
Misc
Partial Correction
11/04/2015
RATED WALLS AT STAIRWELL SHAFTS: EAST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; 2ND LAYER 1/2" GWB FULL HEIGHT; OK TO INSTALL FINISH LAYER 5/8" TYPE X GWB; WEST STAIR SHAFT: OK TO COVER WHEN READY 1" SHAFT LINER FULL HEIGHT; 1ST LAYER 1/2" GWB FULL HEIGHT; EAST WALL ONLY 2ND LAYER 1/2" GWB FULL HEIGHT; OK TO INSTALL FINISH LAYER 5/8" TYPE X GWB ALL WALLS FULL HEIGHT
Above Ceiling Inspection Partial 11/9/2015 at 12:00 AM 11/09/2015
Misc
Partial Correction
11/04/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: LEVEL 3; LEVEL 2;
Rated Assembly Inspection Partial 11/10/2015 at 12:00 AM 11/10/2015
Misc
Partial Correction
11/09/2015
EAST AND WEST STAIR SHAFTS: FINISH LAYER 5/8" TYPE X GWB ALL WALLS FULL HEIGHT OK TO TAPE, MUD, AND FIRE-SEAL -- EXCEPT WALLS AT CORRIDORS YET TO RECEIVE 2ND LAYER 5/8" TYPE X GWB
Above Ceiling Inspection Partial 11/12/2015 11/12/2015 at 12:00 AM 11/12/2015
Misc
Partial Correction
11/09/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: LEVEL 3; LEVEL 2; LEVEL 1 AFTER PENETRATIONS IDENTIFIED ARE FIRE-STOPPED; 4TH LEVEL NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 11/13/2015 at 12:00 AM 11/13/2015
Misc
Partial Correction
11/10/2015
EAST AND WEST STAIR SHAFTS: FINISH LAYER 5/8" TYPE X GWB ALL WALLS INCLUDING WALLS AT CORRIDORS FULL HEIGHT OK TO TAPE, MUD, AND FIRE-SEAL
Above Ceiling Inspection Partial 11/18/2015 at 12:00 AM 11/18/2015
Misc
Partial Correction
11/12/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: LEVEL 3; LEVEL 2; LEVEL 1; LEVEL 4
Above Ceiling Inspection Partial 11/23/2015 11/23/2015 at 12:00 AM 11/23/2015
Misc
Partial Correction
11/18/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: LEVEL 3; LEVEL 2; LEVEL 1; LEVEL 4; E219; E119: NO GRID; NOT READY FOR INSPECTION E319: 5"x9" HOLE IN GWB LID; COMPLETE FRIE-SEALING OF ALL OPENINGS/PENETRATIONS E419: COMPLETE WRAPPING/SEALING OF DUCT INSULATION; FIRE-STOP PENETRATION BY 6" PVC PIPE NEAR E WALL; SOME ELECT BOXES NOT CLOSED; COMPLETE FIRE-STOPPING OF ALL OPENINGS/PENETRATIONS
Above Ceiling Inspection Partial 11/24/2015 11/24/2015 at 12:00 AM 11/24/2015
Misc
Partial Correction
11/23/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: LEVEL 3; LEVEL 2; LEVEL 1; LEVEL 4; E219; E319; E119: NO GRID; NOT READY FOR INSPECTION E419: FIRE-STOP PENETRATION BY 6" PVC PIPE NEAR E WALL
Rated Assembly Inspection Partial 11/24/2015 at 12:00 AM 11/24/2015
Misc
Resolved
11/24/2015
EAST AND WEST STAIR SHAFTS: FINISH LAYER 5/8" TYPE X GWB ALL WALLS INCLUDING WALLS AT CORRIDORS FULL HEIGHT OK TO TAPE, MUD, AND FIRE-SEAL
Misc
Partial Correction
11/24/2015
ELEVATOR SHAFT LID -- OK TO COVER WHEN READY: 1ST LAYER 5/8" TYPE X GWB;
Above Ceiling Inspection Partial 11/25/2015 at 12:00 AM 11/25/2015
Misc
Partial Correction
11/24/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: LEVEL 3; LEVEL 2; LEVEL 1; LEVEL 4; E219; E319; E419 E119: NO GRID; NOT READY FOR INSPECTION
Rated Assembly Inspection Partial 11/25/2015 at 12:00 AM 11/25/2015
Misc
Partial Correction
11/24/2015
ELEVATOR SHAFT LID -- OK TO COVER WHEN READY: 1ST & 2ND LAYERS 5/8" TYPE X GWB OK TO TAPE, MUD AND FIRE-STOP
Above Ceiling Inspection Not Ready 12/2/2015 12/2/2015 at 12:00 AM 12/02/2015
Misc
Partial Correction
11/25/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: LEVEL 3; LEVEL 2; LEVEL 1; LEVEL 4; E219; E319; E419; [E103; 105; 203; 234; 303; 334; 403 E119: NOT REQUESTED FOR INSPECTION
Above Ceiling Inspection Partial 12/4/2015 12/4/2015 at 12:00 AM 12/04/2015
Misc
Partial Correction
12/02/2015
OK TO COVER WHEN READY ACT CEILINGS AT MAIN CORRIDORS AT: LEVEL 3; LEVEL 2; LEVEL 1; LEVEL 4; E219; E319; E419; [E103; 105; 203; 234; 303; 334; 403 E119: NOT REQUESTED FOR INSPECTION
Miscellaneous Inspection Not Ready 12/8/2015 at 12:00 AM 12/08/2015
Misc
Corrective Action Required
12/08/2015
ROOFTOP ISSUES: 1) IMC/IFGC 306.5 ROOFTOP EQUIPMENT MORE THAN 16' ABOVE GRADE REQUIRES PERMANENT LADDER OR OTHER PERMANENT MEANS OF ACCESS. 2) IFGC 407 / 415: ROOFTOP STEEL GAS PIPING SUPPORT SPACING INTERVAL: MAXIMUM 8' FOR 3/4" OR 1"; 10' FOR 1-1/4" OR LARGER 3) IFGC 407; 415: PROTECTION OF MEMBRANE AT ROOFTOP GAS PIPING SUPPORTS: APPLY SPECIFIED / APPROVED, ROOF-COMPATIBLE SLIP SHEET TO UNDERSIDE OF BLOCKS. 4) NEC 350.30; IRC 3802.1: LIQUIDTIGHT FLEXIBLE NON-METALLIC ELECTRICAL WHIP MUST BE SECURED TO STRUCTURE WITHIN 12" OF ENTRY TO A/C DISCONNECT ENCLOSURE. ZIP-TYING TO LINESET DOES NOT SATISFY ELECTRICAL CODE REQUIREMENT. 5) COMPLETE ROOFING/SHEET METAL WORK 6) REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Alarm Test Not Ready 12/9/2015 at 12:00 AM 12/09/2015
Sprinkler - Flow Test Not Ready 12/9/2015 at 12:00 AM 12/09/2015
Miscellaneous Inspection Failed 12/14/2015 at 12:00 AM 12/14/2015
Misc
Corrective Action Required
12/08/2015
PRELIMINARY ISSUES FOR CODES FINAL INSPECTION: 1) LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. 2) COMPLETE ROOFING/SHEET METAL WORK 3) REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE. 4) COMPLETE FIRE-STOPPING OF GWB CEILINGS AT: F.P. SPRINKLER PIPING PENETRATIONS AT MECHANICAL ROOM BEHIND 220D; TWO HOLES IN CEILING AT 430D 5) COMPLETE BALCONY GUARDS WITH MISSING SECTIONS OR PARTS. EXAMPLE: 203D 6) HOLES IN SIDING AT SOME BALCONY ELECTRICAL RECEPTACLES. 7) SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS 8) RECOMMEND TO SHOP-VAC CONSTRUCTION DEBRIS OUT OF DISPOSERS 9) ICC A117.1 CHANGES IN FLOOR LEVEL AT ACCESSIBLE FACILITIES: 1/4" MAX, OR UP TO 1/2" IF BEVELED. 10) SAFE PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST. 11) REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AT GRADE. BRING GRADE UP TO PATIO ELEVATION. 12) COMPLETE WALL CONSTRUCTION AT NW. SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES. 13) TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE. 14) ISSUES MAY BE PRESENTED BY FIRE, PUBLIC WORKS, PLANNING, AND WATER DEPARTMENTS
Alarm Test Passed 12/14/2015 12/14/2015
Sprinkler - Flow Test Passed 12/14/2015 12/14/2015
Occupancy Inspection - Codes Commercial Temporary C of O 12/15/2015 12/15/2015 12/15/2015
Misc
Corrective Action Required
12/15/2015
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: NO ISSUES PRESENTED WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
12/15/2015
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
12/15/2015
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Misc
Corrective Action Required
12/15/2015
COMPLETE FIRE-STOPPING OF GWB CEILINGS AT: 3" F.P. SPRINKLER STACK PENETRATION AT MECHANICAL ROOM BEHIND 220D; ALSO CHECK CEILINGS OF 1ST FLR ROOMS ADJACENT TO ELEVATOR SHAFT
Misc
Corrective Action Required
12/15/2015
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
12/15/2015
HOLES IN SIDING AT SOME BALCONY ELECTRICAL RECEPTACLES
Misc
Corrective Action Required
12/15/2015
SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS
Misc
Corrective Action Required
12/15/2015
ICC A117.1 CHANGES IN FLOOR LEVEL AT ACCESSIBLE FACILITIES: 1/4" MAX, OR UP TO 1/2" IF BEVELED. CORRECTION IN PROGRESS.
Misc
Corrective Action Required
12/15/2015
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
12/15/2015
REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AT GRADE. BRING GRADE UP TO PATIO ELEVATION.
Misc
Corrective Action Required
12/15/2015
COMPLETE WALL CONSTRUCTION AT NW. SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES.
Misc
Corrective Action Required
12/15/2015
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Miscellaneous Inspection Passed 12/15/2015 12/15/2015
Misc
Resolved
12/15/2015
PRELIMINARY ISSUES FOR CODES FINAL INSPECTION: 1) LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. 2) COMPLETE ROOFING/SHEET METAL WORK 3) REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE. 4) COMPLETE FIRE-STOPPING OF GWB CEILINGS AT: F.P. SPRINKLER PIPING PENETRATIONS AT MECHANICAL ROOM BEHIND 220D; TWO HOLES IN CEILING AT 430D 5) COMPLETE BALCONY GUARDS WITH MISSING SECTIONS OR PARTS. EXAMPLE: 203D 6) HOLES IN SIDING AT SOME BALCONY ELECTRICAL RECEPTACLES. 7) SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS 8) RECOMMEND TO SHOP-VAC CONSTRUCTION DEBRIS OUT OF DISPOSERS 9) ICC A117.1 CHANGES IN FLOOR LEVEL AT ACCESSIBLE FACILITIES: 1/4" MAX, OR UP TO 1/2" IF BEVELED. 10) SAFE PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST. 11) REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AT GRADE. BRING GRADE UP TO PATIO ELEVATION. 12) COMPLETE WALL CONSTRUCTION AT NW. SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES. 13) TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE. 14) ISSUES MAY BE PRESENTED BY FIRE, PUBLIC WORKS, PLANNING, AND WATER DEPARTMENTS
Occupancy Inspection - Fire Passed 12/15/2015 at 12:00 AM 12/15/2015
Occupancy Inspection - Planning Temporary C of O 12/15/2015 12/15/2015
Corrective Action Required
12/15/2015
All landscaping shall be completed per final approved plan specifications. If needed TCO can be granted until April, 2016 to allow proper planting.
Corrective Action Required
12/15/2015
All construction debris shall be removed from the site.
Occupancy Inspection - Codes Commercial Partial 12/31/2015 12/31/2015
Misc
Corrective Action Required
12/15/2015
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: NO ISSUES PRESENTED WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
12/15/2015
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
12/15/2015
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Misc
Corrective Action Required
12/15/2015
COMPLETE FIRE-STOPPING OF GWB CEILINGS AT: 3" F.P. SPRINKLER STACK PENETRATION AT MECHANICAL ROOM BEHIND 220D; ALSO CHECK CEILINGS OF 1ST FLR ROOMS ADJACENT TO ELEVATOR SHAFT
Misc
Corrective Action Required
12/15/2015
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
12/15/2015
HOLES IN SIDING AT SOME BALCONY ELECTRICAL RECEPTACLES
Misc
Corrective Action Required
12/15/2015
SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS
Misc
Corrective Action Required
12/15/2015
ICC A117.1 CHANGES IN FLOOR LEVEL AT ACCESSIBLE FACILITIES: 1/4" MAX, OR UP TO 1/2" IF BEVELED. CORRECTION IN PROGRESS.
Misc
Corrective Action Required
12/15/2015
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
12/15/2015
REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AT GRADE. BRING GRADE UP TO PATIO ELEVATION.
Misc
Corrective Action Required
12/15/2015
COMPLETE WALL CONSTRUCTION AT NW. SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES.
Misc
Corrective Action Required
12/15/2015
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Occupancy Inspection - Codes Commercial Partial 1/4/2016 01/04/2016
Misc
Corrective Action Required
01/04/2016
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: NO ISSUES PRESENTED WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
01/04/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
01/04/2016
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Misc
Corrective Action Required
01/04/2016
COMPLETE FIRE-STOPPING OF GWB CEILINGS AT: 3" F.P. SPRINKLER STACK PENETRATION AT MECHANICAL ROOM BEHIND 220D
Misc
Corrective Action Required
01/04/2016
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Resolved
01/04/2016
HOLES IN SIDING AT SOME BALCONY ELECTRICAL RECEPTACLES
Misc
Corrective Action Required
01/04/2016
SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS
Misc
Resolved
01/04/2016
ICC A117.1 CHANGES IN FLOOR LEVEL AT ACCESSIBLE FACILITIES: 1/4" MAX, OR UP TO 1/2" IF BEVELED. CORRECTION IN PROGRESS.
Misc
Corrective Action Required
01/04/2016
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
01/04/2016
REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AT GRADE. BRING GRADE UP TO PATIO ELEVATION.
Misc
Corrective Action Required
01/04/2016
COMPLETE WALL CONSTRUCTION AT NW. SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES.
Misc
Corrective Action Required
01/04/2016
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Occupancy Inspection - Codes Commercial Partial 1/4/2016 01/04/2016
Misc
Corrective Action Required
12/31/2015
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: NO ISSUES PRESENTED WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
12/31/2015
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
12/31/2015
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Misc
Corrective Action Required
12/31/2015
COMPLETE FIRE-STOPPING OF GWB CEILINGS AT: 3" F.P. SPRINKLER STACK PENETRATION AT MECHANICAL ROOM BEHIND 220D; ALSO CHECK CEILINGS OF 1ST FLR ROOMS ADJACENT TO ELEVATOR SHAFT
Misc
Corrective Action Required
12/31/2015
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
12/31/2015
HOLES IN SIDING AT SOME BALCONY ELECTRICAL RECEPTACLES
Misc
Corrective Action Required
12/31/2015
SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS
Misc
Resolved
01/04/2016
ICC A117.1 CHANGES IN FLOOR LEVEL AT ACCESSIBLE FACILITIES: 1/4" MAX, OR UP TO 1/2" IF BEVELED. CORRECTION IN PROGRESS.
Misc
Corrective Action Required
12/31/2015
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
12/31/2015
REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AT GRADE. BRING GRADE UP TO PATIO ELEVATION.
Misc
Corrective Action Required
12/31/2015
COMPLETE WALL CONSTRUCTION AT NW. SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES.
Misc
Corrective Action Required
12/31/2015
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Occupancy Inspection - Codes Commercial Temporary C of O 1/8/2016 01/08/2016
Misc
Corrective Action Required
01/04/2016
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: SEE SEPARATE REPORT WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
01/04/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
01/04/2016
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Misc
Resolved
01/08/2016
COMPLETE FIRE-STOPPING OF GWB CEILINGS AT: 3" F.P. SPRINKLER STACK PENETRATION AT MECHANICAL ROOM BEHIND 220D
Misc
Corrective Action Required
01/04/2016
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
01/04/2016
SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS
Misc
Corrective Action Required
01/04/2016
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
01/04/2016
REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AT GRADE. BRING GRADE UP TO PATIO ELEVATION.
Misc
Corrective Action Required
01/04/2016
COMPLETE WALL CONSTRUCTION AT NW. SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES.
Misc
Corrective Action Required
01/04/2016
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Occupancy Inspection - Codes Commercial Temporary C of O 1/12/2016 01/12/2016
Misc
Corrective Action Required
01/08/2016
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
01/08/2016
SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS
Misc
Corrective Action Required
01/08/2016
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
01/08/2016
BRING GRADE UP TO PATIO ELEVATION AT 1ST FLOOR NW UNITS.
Misc
Corrective Action Required
01/08/2016
COMPLETE WALL CONSTRUCTION AT NW. SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES.
Misc
Corrective Action Required
01/08/2016
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Misc
Corrective Action Required
01/08/2016
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: SEE SEPARATE REPORT WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
01/08/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
01/08/2016
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Occupancy Inspection - Codes Commercial Partial 1/21/2016 01/21/2016
Misc
Corrective Action Required
01/12/2016
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
01/12/2016
SEAL OPENINGS AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS
Misc
Corrective Action Required
01/12/2016
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
01/12/2016
BRING GRADE UP TO PATIO ELEVATION AT 1ST FLOOR NW UNITS.
Misc
Corrective Action Required
01/12/2016
SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES.
Misc
Corrective Action Required
01/12/2016
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Misc
Corrective Action Required
01/12/2016
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: SEE SEPARATE REPORT WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
01/12/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
01/12/2016
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Occupancy Inspection - Codes Commercial Temporary C of O 1/22/2016 01/22/2016
Misc
Corrective Action Required
01/21/2016
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
01/21/2016
SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES AND AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS.
Misc
Corrective Action Required
01/21/2016
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Resolved
01/22/2016
BRING GRADE UP TO PATIO ELEVATION AT 1ST FLOOR NW UNITS.
Misc
Resolved
01/22/2016
SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES.
Misc
Corrective Action Required
01/21/2016
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Misc
Corrective Action Required
01/21/2016
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: SEE SEPARATE REPORT WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
01/21/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
01/21/2016
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Occupancy Inspection - Codes Commercial Temporary C of O 1/22/2016 01/22/2016
Misc
Corrective Action Required
01/22/2016
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
01/22/2016
SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING AT LUMINAIRES AND AROUND INTAKE LOUVERS AT UNIT MECHANICAL CLOSETS.
Misc
Corrective Action Required
01/22/2016
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
01/22/2016
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Misc
Corrective Action Required
01/22/2016
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: SEE SEPARATE REPORT WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
01/22/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
01/22/2016
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Misc
Corrective Action Required
01/22/2016
MINIMUM 42" HIGH ROOF EDGE GUARD IS REQUIRED WHERE ACCESS HATCH OR APPLIANCES REQUIRING SERVICING ARE LOCATED WITHIN 10' OF ROOF EDGE
Rated Assembly Inspection Passed 1/29/2016 11/25/2015 01/29/2016
Misc
Resolved
01/29/2016
ELEVATOR SHAFT LID -- OK TO COVER WHEN READY: 1ST & 2ND LAYERS 5/8" TYPE X GWB OK TO TAPE, MUD AND FIRE-STOP
Occupancy Inspection - Codes Commercial Partial 1/29/2016 01/29/2016
Misc
Resolved
01/29/2016
COMPLETE PERMANENT BALCONY GUARDS WHERE MISSING SECTIONS OR PARTS. EXAMPLE: 203D. WORK IN PROGRESS.
Misc
Corrective Action Required
01/22/2016
SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING HOLES IN SIDING AT BALCONY ELECTRICAL RECEPTACLES AND AT EXTERIOR WALL LUMINAIRES.
Misc
Corrective Action Required
01/22/2016
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
01/22/2016
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Misc
Corrective Action Required
01/22/2016
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: SEE SEPARATE REPORT WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
01/22/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
01/22/2016
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Misc
Corrective Action Required
01/22/2016
MINIMUM 42" HIGH ROOF EDGE GUARD IS REQUIRED WHERE ACCESS HATCH OR APPLIANCES REQUIRING SERVICING ARE LOCATED WITHIN 10' OF ROOF EDGE
Underground Electrical Inspection - Commercial Passed 1/29/2016 01/30/2016
Occupancy Inspection - Codes Commercial Temporary C of O 2/11/2016 02/11/2016
Misc
Corrective Action Required
01/29/2016
SEAL ALL PENETRATIONS/HOLES IN EXTERIOR BUILDING WALLS, INCLUDING HOLES IN SIDING AT BALCONY ELECTRICAL RECEPTACLES AND AT EXTERIOR WALL LUMINAIRES.
Misc
Resolved
02/11/2016
TEMPORARY PASSAGE PROVISIONS TO BE ESTABLISHED AT 1ST FLR CORRIDOR WEST -- NOT REQUIRED FOR EMERGENCY EGRESS, BUT SUBJECT TO REASONABLE SAFETY STANDARDS WHEN CONSTRUCTED.
Misc
Corrective Action Required
01/29/2016
TRIM PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Misc
Corrective Action Required
01/29/2016
DEPARTMENTS APART FROM CODES: FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING; OK FOR TCO PLANNING: SEE SEPARATE REPORT WATER DEPARTMENT: APPROVED
Misc
Corrective Action Required
01/29/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
01/29/2016
COMPLETE ROOFING/SHEET METAL WORK. REMOVE ALL EQUIPMENT, TOOLS, MATERIALS. LEAVE NO DEBRIS ON ROOF MEMBRANE.
Misc
Corrective Action Required
01/29/2016
MINIMUM 42" HIGH ROOF EDGE GUARD IS REQUIRED WHERE ACCESS HATCH OR APPLIANCES REQUIRING SERVICING ARE LOCATED WITHIN 10' OF ROOF EDGE
Occupancy Inspection - Codes Commercial Temporary C of O 3/18/2016 3/18/2016 03/18/2016
Misc
Corrective Action Required
02/11/2016
UNTERMINATE ELECTRICAL CONDUCTORS PROTRUDING FROM EXTERIOR WALLS. LUMINAIRES TO BE INSTALLED?
Misc
Corrective Action Required
02/11/2016
WHEN LANDSCAPING IS COMPLETED TRIM SANITARY PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Misc
Corrective Action Required
02/11/2016
DEPARTMENTS APART FROM CODES: WATER DEPARTMENT: APPROVED FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING PLANNING: SEE SEPARATE REPORT
Misc
Resolved
03/18/2016
LADDER TO ROOFTOP SHOULD FACE ACCESS SIDE OF ROOF HATCH. CORRECTION INITIATED.
Misc
Corrective Action Required
02/11/2016
REMOVE FROM ROOFTOP ALL UNUSED MATERIALS AND DEBRIS. SIZABLE SHEET METAL PARTS LEFT NEAR RTU'S. LEAVE NO SCREWS, NAILS, OR OTHER LOOSE MATERIAL ON ROOF MEMBRANE.
Misc
Resolved
03/18/2016
MINIMUM 42" HIGH ROOF EDGE GUARD IS REQUIRED WHERE ACCESS HATCH OR APPLIANCES REQUIRING SERVICING ARE LOCATED WITHIN 10' OF ROOF EDGE
Occupancy Inspection - Engineering Passed 06/17/2016
Sidewalk Inspection Passed 06/17/2016
Occupancy Inspection - Codes Commercial Temporary C of O 6/17/2016 06/17/2016
Misc
Corrective Action Required
03/18/2016
REMOVE FROM ROOFTOP ALL UNUSED MATERIALS AND DEBRIS. SIZABLE SHEET METAL PARTS LEFT NEAR RTU'S. LEAVE NO SCREWS, NAILS, OR OTHER LOOSE MATERIAL ON ROOF MEMBRANE.
Misc
Corrective Action Required
03/18/2016
DEPARTMENTS APART FROM CODES: WATER DEPARTMENT: APPROVED FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING PLANNING: SEE SEPARATE REPORT
Misc
Corrective Action Required
03/18/2016
WHEN LANDSCAPING IS COMPLETED TRIM SANITARY PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Misc
Resolved
06/01/2016
UNTERMINATED ELECTRICAL CONDUCTORS PROTRUDING FROM EXTERIOR WALLS. LUMINAIRES TO BE INSTALLED?
Rough Electrical Inspection - Commercial Passed 07/06/2016
Misc
Partial Correction
10/27/2015
FEEDER TERMINATIONS AT FLOOR DISTRIBUTION PANELS: NO ISSUES FOUND AT PANELS 1D, 2D;
Misc
Partial Correction
10/27/2015
INSEPCTED AND APPROVED 3RD AND 4TH FLOOR MAIN DISTRUBUTION PANELS AND SUB-PANELS IN UNITS.
Occupancy Inspection - Codes Commercial Not Ready 7/7/2016 07/07/2016
Misc
Corrective Action Required
06/17/2016
REMOVE FROM ROOFTOP ALL UNUSED MATERIALS AND DEBRIS. SIZABLE SHEET METAL PARTS LEFT NEAR RTU'S. LEAVE NO SCREWS, NAILS, OR OTHER LOOSE MATERIAL ON ROOF MEMBRANE.
Misc
Corrective Action Required
06/17/2016
DEPARTMENTS APART FROM CODES: WATER DEPARTMENT: APPROVED FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING PLANNING: SEE SEPARATE REPORT
Misc
Corrective Action Required
06/17/2016
WHEN LANDSCAPING IS COMPLETED TRIM SANITARY PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Occupancy Inspection - Planning Passed 07/08/2016
Occupancy Inspection - Codes Commercial Full C of O 7/8/2016 07/08/2016
Misc
Resolved
07/08/2016
REMOVE FROM ROOFTOP ALL UNUSED MATERIALS AND DEBRIS. SIZABLE SHEET METAL PARTS LEFT NEAR RTU'S. LEAVE NO SCREWS, NAILS, OR OTHER LOOSE MATERIAL ON ROOF MEMBRANE.
Misc
Resolved
07/08/2016
DEPARTMENTS APART FROM CODES: WATER DEPARTMENT: APPROVED FIRE DEPARTMENT: OK PER CPT WEISSENBACH PUBLIC WORKS: SIDEWALK APPROVAL PENDING PLANNING: SEE SEPARATE REPORT
Misc
Resolved
07/08/2016
WHEN LANDSCAPING IS COMPLETED TRIM SANITARY PLUMBING CLEANOUT RISERS TO NEAR GRADE.
Documents & Images
Date Uploaded File Type Document Name
01/08/2015 Letter Fire Building Plan Review
01/19/2015 Letter Codes P/R Corrections Document
02/02/2015 Letter Fire Building Plan Review
02/10/2015 Letter Codes P/R Corrections Document
02/10/2015 Letter Fire Building Plan Review
03/04/2015 Letter Codes Plan Review Conditions
03/04/2015 Receipt Receipt for transaction: 2015-000282
03/04/2015 Letter Codes Building Permit
03/10/2015 Letter Inspection Summary
03/16/2015 Letter Inspection Summary
03/16/2015 Letter Inspection Summary
05/06/2015 Code Mod Request CMR with sketches
05/06/2015 CMR with justification
05/27/2015 Letter Fire (Sprinkler) Plan Review
06/29/2015 Supplemental Structural Drawings-9-S3 0 REV-000
07/24/2015 Letter Inspection Summary
07/31/2015 Letter Inspection Summary
08/03/2015 Letter Inspection Summary
08/04/2015 Letter Inspection Summary
08/06/2015 Letter Inspection Summary
08/10/2015 Letter Inspection Summary
08/13/2015 Letter Inspection Summary
08/17/2015 Letter Inspection Summary
08/18/2015 Letter Inspection Summary
08/20/2015 Letter Inspection Summary
08/20/2015 Letter Inspection Summary
08/21/2015 Letter Inspection Summary
08/27/2015 Letter Inspection Summary
08/28/2015 Letter Inspection Summary
08/31/2015 Letter Inspection Summary
09/01/2015 Letter Inspection Summary
09/03/2015 Letter Inspection Summary
09/04/2015 Letter Inspection Summary
09/11/2015 Letter Inspection Summary
09/14/2015 Letter Inspection Summary
09/17/2015 Letter Inspection Summary
09/22/2015 Letter Inspection Summary
09/23/2015 Letter Inspection Summary
09/28/2015 Letter Inspection Summary
09/30/2015 Letter Inspection Summary
10/02/2015 Letter Inspection Summary
10/06/2015 Letter Inspection Summary
10/07/2015 Letter Inspection Summary
10/09/2015 Letter Inspection Summary
10/12/2015 Letter Inspection Summary
10/15/2015 Letter Inspection Summary
10/17/2015 Letter Inspection Summary
10/20/2015 Letter Inspection Summary
10/21/2015 Letter Inspection Summary
10/22/2015 Letter Inspection Summary
10/23/2015 Letter Inspection Summary
10/27/2015 Letter Inspection Summary
10/28/2015 Letter Inspection Summary
10/29/2015 Letter Inspection Summary
10/30/2015 Letter Inspection Summary
11/02/2015 Letter Inspection Summary
11/03/2015 Letter Inspection Summary
11/04/2015 Letter Inspection Summary
11/09/2015 Letter Inspection Summary
11/10/2015 Letter Inspection Summary
11/12/2015 Letter Inspection Summary
11/13/2015 Letter Inspection Summary
11/18/2015 Letter Inspection Summary
11/23/2015 Letter Inspection Summary
11/24/2015 Letter Inspection Summary
11/25/2015 Letter Inspection Summary
12/04/2015 Letter Inspection Summary
12/08/2015 Letter Inspection Summary
12/14/2015 Letter Inspection Summary
12/15/2015 Letter Codes Temporary Certificate of Occupancy
12/15/2015 Letter Planning Inspection Summary
12/22/2015 Letter DOC122215-004
01/08/2016 Letter Codes Temporary Certificate of Occupancy
01/12/2016 Letter Codes Temporary Certificate of Occupancy
01/22/2016 Letter Codes Temporary Certificate of Occupancy
01/22/2016 Letter Codes Temporary Certificate of Occupancy
01/30/2016 Letter Inspection Summary
03/18/2016 Letter Codes Temporary Certificate of Occupancy
06/17/2016 Letter Codes Temporary Certificate of Occupancy
07/08/2016 Letter Field Certificate of Occupancy
07/11/2016 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home