Permit Application Status

PRCOM20143272


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20143272
Building Permit - Commercial
Certificate of Occupancy
200 NE MISSOURI DRIVE HOLDINGS LLC
CHANGE OF TENANT
TENANT FINISH FOR PAIN CLINIC ON FIRST FLOOR & OFFICES ON THIRD FLOOR
11/25/2014
01/27/2015
05/31/2015
06/08/2015
Locations
Contacts
MID-AMERICA CONTRACTORS INC, Address:1400 IRON, Phone:(816) 221-4516  
METRO AIR CONDITIONING , Address:8151 MCCOY ST, Phone:(913) 888-3991  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
HEREFORD DOOLEY ARCHITECTS, Address:1720 WEST END AVENUE, SUITE 130, Phone:(615) 244-7399  
200 NE MISSOURI DRIVE HOLDINGS LLC, Address:5956 SHERRY LANE STE 1201, Phone:(301) 255-4872  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 05/18/2015
Brian Austerman
Construction documents for fire alarm systems
Corrective Action Required
05/18/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans showing changes to the system 3/25/15 Alarm contractor shall provide plans showing device specifications and battery calculations
Fire-resistant-rated construction - Maintenance
Corrective Action Required
05/18/2015

2012 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. For information only Resolved
Construction documents - Fire protection systems
Corrective Action Required
05/18/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans showing changes to the system Resolved
Misc
Corrective Action Required
05/18/2015

No further FD comments
Fire Plan Review Approved with Conditions 03/25/2015
Brian Austerman
Construction documents for fire alarm systems
Corrective Action Required
03/25/2015

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans showing changes to the system 3/25/15 Alarm contractor shall provide plans showing device specifications and battery calculations
Fire-resistant-rated construction - Maintenance
Corrective Action Required
03/25/2015

2012 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. For information only Resolved
Construction documents - Fire protection systems
Corrective Action Required
03/25/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans showing changes to the system Resolved
Sprinkler Plan Review Released for Construction 03/04/2015
Brian Austerman
Misc
Corrective Action Required
03/04/2015

Released without comment
Licensed Contractors Approved 12/09/2014 01/26/2015
Joe Frogge
LC - General Contractor
Resolved
01/26/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
01/26/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Building Plan Review Approved with Conditions 12/16/2014 12/24/2014
Joe Frogge
Misc
Resolved
12/12/2014

2012 IBC 1005.7 Encroachment. Encroachments into the required means of egress width shall be in accordance with the provisions of this section. 1005.7.1 Doors. Doors, when fully opened, shall not reduce the required width by more than 7 inches. Doors in any position shall not reduce the required width by more than one-half. Action required: Modify design at door into Jan B124. Currently the door when in the fully open position is will not be within the 7" guideline. 12/12/14 - door swing changed
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
12/12/2014

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design at doors 307a and 307b to show compliance. Currently the proposed furniture is within the minimum maneuvering clearances. 12/12/14 - door swings relocated
Misc
Resolved
12/12/2014

2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80. Action required: Specify fire ratings at doors in fire rated assemblies. 12/12/14 - ratings added to schedule
Accessibility - Fixed sidewall grab bars 604.5.1
Resolved
12/12/2014

ICC A117.1-2009 604.5.1 – Fixed side wall grab bars. Fixed side-wall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide vertical grab bar at toilet. Reference detail 2/A401. 12/12/14 - bars added to plans
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Resolved
12/12/2014

2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Modify design of desk at Reception 300 to show compliance. 12/12/14 - accessible portion added
Plumb - Backflow - Plumbing fixtures 608.2
Resolved
12/12/2014

2012 IPC 608.2 Plumbing fixtures. The supply lines and fittings for plumbing fixtures shall be installed so as to prevent backflow. Plumbing fixtures shall provide backflow protection in accordance with ASME A112.18.1/CSA B125.1. Action required: Specify backflow prevention at coffee maker and ice maker. 12/12/14 - backflow noted
Plumb - Indirect/Special Waste - Where required 802.1
Resolved
12/24/2014

2012 IPC 802.1 Where required. Food-handling equipment and clear-water waste shall discharge though an indirect waste pipe as specified in Sections 802.1.1 through 802.1.8. All health-care related fixtures, devices and equipment shall discharge to the drainage system through an indirect waste pipe by means of an air gap in accordance with this chapter and section 713.3. Fixtures not required by this section to be indirectly connected shall be directly connected to the plumbing system in accordance with Chapter 7. Action required: Specify method for indirect drain at ice maker. 12/12/14 - unable to located indirect drain 12/24/14 - Per letter from architect, ice makers are residential, non-draining
License Tax Application
Corrective Action Required
12/09/2014

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Fire Plan Review Approved with Conditions 12/16/2014 12/10/2014
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
12/09/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans showing changes to the system
Fire-resistant-rated construction - Maintenance
Corrective Action Required
12/09/2014

2012 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. For information only
Construction documents - Fire protection systems
Corrective Action Required
12/09/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans showing changes to the system
Building Plan Review Rejected 12/09/2014 12/02/2014
Joe Frogge
Misc
Corrective Action Required
12/02/2014

2012 IBC 1005.7 Encroachment. Encroachments into the required means of egress width shall be in accordance with the provisions of this section. 1005.7.1 Doors. Doors, when fully opened, shall not reduce the required width by more than 7 inches. Doors in any position shall not reduce the required width by more than one-half. Action required: Modify design at door into Jan B124. Currently the door when in the fully open position is will not be within the 7" guideline.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
12/02/2014

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design at doors 307a and 307b to show compliance. Currently the proposed furniture is within the minimum maneuvering clearances.
Misc
Corrective Action Required
12/02/2014

2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80. Action required: Specify fire ratings at doors in fire rated assemblies.
Accessibility - Fixed sidewall grab bars 604.5.1
Corrective Action Required
12/02/2014

ICC A117.1-2009 604.5.1 – Fixed side wall grab bars. Fixed side-wall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide vertical grab bar at toilet. Reference detail 2/A401.
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Corrective Action Required
12/02/2014

2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Modify design of desk at Reception 300 to show compliance.
Plumb - Backflow - Plumbing fixtures 608.2
Corrective Action Required
12/02/2014

2012 IPC 608.2 Plumbing fixtures. The supply lines and fittings for plumbing fixtures shall be installed so as to prevent backflow. Plumbing fixtures shall provide backflow protection in accordance with ASME A112.18.1/CSA B125.1. Action required: Specify backflow prevention at coffee maker and ice maker.
Plumb - Indirect/Special Waste - Where required 802.1
Corrective Action Required
12/02/2014

2012 IPC 802.1 Where required. Food-handling equipment and clear-water waste shall discharge though an indirect waste pipe as specified in Sections 802.1.1 through 802.1.8. All health-care related fixtures, devices and equipment shall discharge to the drainage system through an indirect waste pipe by means of an air gap in accordance with this chapter and section 713.3. Fixtures not required by this section to be indirectly connected shall be directly connected to the plumbing system in accordance with Chapter 7. Action required: Specify method for indirect drain at ice maker.
License Tax Application
Corrective Action Required
12/02/2014

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Licensed Contractors Rejected 12/09/2014 12/02/2014
Joe Frogge
LC - General Contractor
Corrective Action Required
12/02/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
12/02/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 12/09/2014 12/01/2014
Brian Austerman
Construction documents for fire alarm systems
Corrective Action Required
12/01/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans showing changes to the system
Fire-resistant-rated construction - Maintenance
Corrective Action Required
12/01/2014

2012 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. For information only
Construction documents - Fire protection systems
Corrective Action Required
12/01/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans showing changes to the system
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $2,246.75 $2,246.75 Paid 01/27/2015
8331507-Sewer Connection Fee $240.00 $240.00 Paid 01/27/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 2/26/2015 at 12:00 AM 02/26/2015
In-wall Inspection Partial 3/4/2015 3/4/2015 at 12:00 AM 03/05/2015
Misc
Partial Correction
03/05/2015
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: PAIN CLINIC ON FIRST FLOOR;
Above Ceiling Inspection Partial 3/6/2015 at 12:00 AM 03/06/2015
Misc
Partial Correction
03/06/2015
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ SECOND FLOOR @ FOLLOWING LOCATIONS: GWB SOFFIT AT RECEPTION AREA;
In-wall Inspection Passed 3/6/2015 at 12:00 AM 03/06/2015
Misc
Resolved
03/06/2015
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: PAIN CLINIC ON FIRST FLOOR;
Above Ceiling Inspection Partial 3/13/2015 at 12:00 AM 03/13/2015
Misc
Partial Correction
03/06/2015
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ SECOND FLOOR @ FOLLOWING LOCATIONS: GWB SOFFIT AT RECEPTION AREA; SOFFITS-RM-110,111,112,113,116,118,119,120,124,104,105,123
Rated Assembly Inspection Partial 3/13/2015 at 12:00 AM 03/13/2015
FIRST FLOOR
Corrective Action Required
03/13/2015
FIREWALL 1ST LAYER-SCREW PATTERN ROOMS-114,115,121,123,124
Rated Assembly Inspection Partial 3/19/2015 3/19/2015 at 12:00 AM 03/19/2015
Misc
Partial Correction
03/19/2015
FIREWALL 1ST LAYER-SCREW PATTERN ROOMS-114,115,121,123,124;
Misc
Partial Correction
03/19/2015
GWB AT NEWLY-BUILT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: B105; 106; 108; 115; 121; 123; 124; CORRIDOR DOOR B114 RECESS
Rated Assembly Inspection Partial 3/31/2015 3/31/2015 at 12:00 AM 03/31/2015
Misc
Partial Correction
03/19/2015
GWB AT NEWLY-BUILT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: B105; 106; 108; 114; 115; 121; 123; 124; CORRIDOR DOOR B114 RECESS FIRE-CAULKING APPROVED AT SAME LOCATIONS EXCEPT COMPLETE AT PERIMETER OF ONE DAMPER AND STUFF SAFING ABOVE FLANGE OF ON EWF STEEL BEAM.
Above Ceiling Inspection Partial 4/6/2015 4/6/2015 at 12:00 AM 04/06/2015
Misc
Partial Correction
04/06/2015
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS @ 102; 108; 300/301
Above Ceiling Inspection Partial 4/30/2015 4/30/2015 at 12:00 AM 04/30/2015
Misc
Resolved
04/30/2015
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS @ 102; 108; 300/301
Misc
Partial Correction
04/30/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: EXCEPT NOT AT SPACES WITH RATED WALLS AND BORNDERS ONLY AT WAITING ROOM
Above Ceiling Inspection Partial 5/1/2015 at 12:00 AM 05/01/2015
Misc
Partial Correction
04/30/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: FIRST FLOOR AREAS EXCEPT BORDERS ONLY AT WAITING ROOM THIRD FLOOR NOT READY
Above Ceiling Inspection Partial 5/5/2015 5/5/2015 at 12:00 AM 05/05/2015
Misc
Partial Correction
05/05/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: FIRST FLOOR AREAS EXCEPT BORDERS ONLY AT WAITING ROOM THIRD FLOOR: OK FOR CUT BORDERS ONLY. - ENSURE MC CABLE IS SECURED WITHIN ~12" OF BOX ENTRY - ENSURE CEILING SUPPORT WIRES PATH STRIGHT FROM STRUCTURE TO MAIN TEES; NOT BENT AROUND DUCTS, ETC - REINFORCE "CARVED" STUDS AT CORRIDOR - ENSURE ALL HVAC FLEX CONNECTORS ARE TAPED OR BANDED BOTH INNER AND OUTER LAYERS.
Above Ceiling Inspection Partial 5/6/2015 5/6/2015 at 12:00 AM 05/06/2015
Misc
Partial Correction
05/05/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: FIRST FLOOR AREAS INCLUDING WAITING/COFFEE ROOM B100/B101 THIRD FLOOR: OK FOR CUT BORDERS ONLY. - ENSURE ALL HVAC FLEX CONNECTORS ARE TAPED OR BANDED BOTH INNER AND OUTER LAYERS + INSTALL MINIMUM 1-1/2" WIDE STRAP HANGERS AT MAXIMUM 5' FLEX CONNECTOR INTERVALS.
Above Ceiling Inspection Not Ready 5/8/2015 at 12:00 AM 05/08/2015
Misc
Partial Correction
05/06/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: FIRST FLOOR AREAS INCLUDING WAITING/COFFEE ROOM B100/B101 THIRD FLOOR: OK FOR CUT BORDERS ONLY. - ENSURE ALL HVAC FLEX CONNECTORS ARE TAPED OR BANDED BOTH INNER AND OUTER LAYERS + INSTALL MINIMUM 1-1/2" WIDE STRAP HANGERS AT MAXIMUM 5' FLEX CONNECTOR INTERVALS.
Above Ceiling Inspection Passed 5/13/2015 at 12:00 AM 05/13/2015
Misc
Resolved
05/13/2015
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: FIRST FLOOR AREAS INCLUDING WAITING/COFFEE ROOM B100/B101 THIRD FLOOR: OK FOR CUT BORDERS ONLY. - ENSURE ALL HVAC FLEX CONNECTORS ARE TAPED OR BANDED BOTH INNER AND OUTER LAYERS + INSTALL MINIMUM 1-1/2" WIDE STRAP HANGERS AT MAXIMUM 5' FLEX CONNECTOR INTERVALS.
Rated Assembly Inspection Passed 5/13/2015 at 12:00 AM 05/13/2015
Misc
Resolved
05/13/2015
GWB AT NEWLY-BUILT 1 HR FIRE-RATED WALLS: OK TO TAPE, MUD, & FIRE-SEAL WHEN READY 5/8" TYPE X GWB INSTALLATION @ FOLLOWING LOCATIONS: B105; 106; 108; 114; 115; 121; 123; 124; CORRIDOR DOOR B114 RECESS FIRE-CAULKING APPROVED AT SAME LOCATIONS EXCEPT COMPLETE AT PERIMETER OF ONE DAMPER AND STUFF SAFING ABOVE FLANGE OF ON EWF STEEL BEAM.
Occupancy Inspection - Codes Commercial Temporary C of O 5/18/2015 5/18/2015 at 12:00 AM 05/18/2015
Misc
Corrective Action Required
05/18/2015
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
05/18/2015
ENSURE ALL ELECTRICAL RECEPTACLES ARE TIGHTENED SECURELY TO BOX.
Misc
Corrective Action Required
05/18/2015
CHECK ELECTRICAL PANELS. ENSURE PANEL SCHEDULES ARE CURRENT, COMPLETE, AS SPECIFIC AS POSSIBLE, AND LEGIBLE.
Occupancy Inspection - Fire Temporary C of O 5/18/2015 at 12:00 AM 05/18/2015
Alarm Test Passed 5/18/2015 at 12:00 AM 05/18/2015
Occupancy Inspection - Fire Temporary C of O 5/18/2015 at 12:00 AM 05/18/2015
Occupancy Inspection - Codes Commercial Full C of O 6/8/2015 6/8/2015 at 12:00 AM 06/08/2015
Misc
Resolved
06/08/2015
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Resolved
06/08/2015
ENSURE ALL ELECTRICAL RECEPTACLES ARE TIGHTENED SECURELY TO BOX.
Misc
Resolved
06/08/2015
CHECK ELECTRICAL PANELS. ENSURE PANEL SCHEDULES ARE CURRENT, COMPLETE, AS SPECIFIC AS POSSIBLE, AND LEGIBLE.
Occupancy Inspection - Fire Passed 6/8/2015 6/8/2015 at 12:00 AM 06/08/2015
Documents & Images
Date Uploaded File Type Document Name
12/01/2014 Letter Fire Building Plan Review
12/02/2014 Letter Codes P/R Corrections Document
12/12/2014 Letter Codes P/R Corrections Document
01/27/2015 Receipt Receipt for transaction: 2015-000110
01/27/2015 Letter Codes Building Permit
01/27/2015 Letter Codes Plan Review Conditions
02/26/2015 Letter Inspection Summary
03/04/2015 Letter Fire (Sprinkler) Plan Review
03/04/2015 Letter Inspection Summary
03/06/2015 Letter Inspection Summary
03/13/2015 Letter Inspection Summary
03/19/2015 Letter Inspection Summary
03/25/2015 Letter Fire Building Plan Review
03/31/2015 Letter Inspection Summary
04/06/2015 Letter Inspection Summary
04/30/2015 Letter Inspection Summary
05/01/2015 Letter Inspection Summary
05/05/2015 Letter Inspection Summary
05/06/2015 Letter Inspection Summary
05/18/2015 Letter Codes Temporary Certificate of Occupancy
05/18/2015 Letter Fire Building Plan Review
06/08/2015 Letter Field Certificate of Occupancy
06/09/2015 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home