Permit Application Status

PRCOM20142991


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20142991
Building Permit - Commercial
Final Completion
JOHN KNOX VILLAGE
ALTERATION OTHER COM
NEW PARKING LOT LIGHTING AND ASSOCIATED CIRCUITRY
10/27/2014
11/12/2014
12/24/2014
Locations
Contacts
CAPITAL ELECTRIC CONSTRUCTION INC, Address:PO BOX 410079, Phone:(913) 335-1214  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/27/2014 10/27/2014
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Add/Alter Other $109.12 $109.12 Paid 11/12/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 11/12/2014 11/12/2014 at 12:00 AM 11/12/2014
Misc
Partial Correction
11/12/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 6; 8; CONDUIT HAS BEEN TRENCHED AND COVERED WITHOUT APPROVAL.
Underground Electrical Inspection - Commercial Partial 11/18/2014 at 12:00 AM 11/18/2014
Misc
Partial Correction
11/18/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 6; 8; 4; 7; 9; 10 INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS HAVE BEEN TRENCHED AND COVERED WITHOUT APPROVAL.
Underground Electrical Inspection - Commercial Partial 11/19/2014 11/19/2014 at 12:00 AM 11/19/2014
Misc
Partial Correction
11/18/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 6; 8; 4; 7; 9; 10; 11; 12; 13; INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS HAVE BEEN TRENCHED AND COVERED WITHOUT APPROVAL.
Underground Electrical Inspection - Commercial Partial 11/20/2014 11/20/2014 at 12:00 AM 11/20/2014
Misc
Partial Correction
11/19/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 6; 8; 4; 7; 9; 10; 11; 12; 13; 14; 15; 16; INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS HAVE BEEN TRENCHED AND COVERED WITHOUT APPROVAL.
Underground Electrical Inspection - Commercial Partial 11/21/2014 11/21/2014 at 12:00 AM 11/21/2014
Misc
Partial Correction
11/20/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 6; 8; 4; 7; 9; 10; 11; 12; 13; 14; 15; 16; 17; 18; 19; INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS WERE TRENCHED AND COVERED WITHOUT APPROVAL.
Underground Electrical Inspection - Commercial Partial 11/24/2014 11/24/2014 at 12:00 AM 11/24/2014
Misc
Partial Correction
11/21/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 6; 8; 4; 7; 9; 10; 11; 12; 13; 14; 15; 16; 17; 18; 19; 23; 24; 25; 26; 27; 28; 29 INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS WERE TRENCHED AND COVERED WITHOUT APPROVAL.
Underground Electrical Inspection - Commercial Partial 11/25/2014 11/25/2014 at 12:00 AM 11/25/2014
Misc
Partial Correction
11/24/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 6; 8; 4; 7; 9; 10; 11; 12; 13; 14; 15; 16; 17; 18; 19; 23; 24; 25; 26; 27; 28; 29; 20; 21; 22; ALL POLE BASES APPROVED TO POUR INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS WERE TRENCHED AND COVERED WITHOUT APPROVAL.
Final Electrical Inspection - Commercial Not Ready 12/19/2014 at 12:00 AM 12/19/2014
Misc
Corrective Action Required
12/19/2014
INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS WERE TRENCHED AND COVERED WITHOUT APPROVAL.
Misc
Corrective Action Required
12/19/2014
PLANNING APPROVAL REQUIRED
Underground Electrical Inspection - Commercial Passed 11/25/2014 at 12:00 AM 12/19/2014
Misc
Resolved
12/19/2014
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #1; 2; 3; 6; 8; 4; 7; 9; 10; 11; 12; 13; 14; 15; 16; 17; 18; 19; 23; 24; 25; 26; 27; 28; 29; 20; 21; 22; ALL POLE BASES APPROVED TO POUR INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS WERE TRENCHED AND COVERED WITHOUT APPROVAL.
Final Electrical Inspection - Commercial Passed 12/23/2014 at 12:00 AM 12/23/2014
Misc
Resolved
12/23/2014
INSPECTION OF TRENCHED CONDUIT IS PARTIAL SINCE SINCE SUBSTANTIAL PORTIONS WERE TRENCHED AND COVERED WITHOUT APPROVAL.
Misc
Resolved
12/23/2014
PLANNING APPROVAL REQUIRED
Investigation Inspection Complete 12/23/2014 at 12:00 AM 12/23/2014
Documents & Images
Date Uploaded File Type Document Name
11/12/2014 Letter Codes Building Permit
11/12/2014 Receipt Receipt for transaction: 2014-002170
11/12/2014 Letter Inspection Summary
11/18/2014 Letter Inspection Summary
11/19/2014 Letter Inspection Summary
11/20/2014 Letter Inspection Summary
11/21/2014 Letter Inspection Summary
11/24/2014 Letter Inspection Summary
11/25/2014 Letter Inspection Summary
12/23/2014 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home