Permit Application Status

PRCOM20140512


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20140512
Building Permit - Commercial
Voided
LBP V LLC
NEW TENANT FINISH
TENANT FINISH FOR INDOOR TRAMPOLINE PARK - VOIDED PER BUILDER 10/30/14
04/03/2014
10/08/2014
10/30/2014
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
  
  
  
ABELN & ASSOCIATES ARCHITECTS PC, Address:11827 W 112th St, Suite 220  
LBP V LLC, Address:3215 NE CARNEGIE DR STE 200, Phone:(816) 795-8100  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 05/07/2014 05/07/2014
Joe Frogge
Health Dept Review
Corrective Action Required
04/30/2014

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action Required - This comment is for information purposes.
Health Dept Inspection
Corrective Action Required
04/30/2014

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action Required - This comment is for information purposes.
Misc
Resolved
05/01/2014

2012 IBC Chapter 10 - Means of egress. Action required: Provide egress plan. 5/1/14 - resolved
Bldg - Occupant load posting 1004.3
Resolved
05/01/2014

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Comment for informational purposes. Posting to be verified at inspections. 5/1/14 - resolved
Misc
Resolved
05/01/2014

Miscellaneous. Action required: Clarify use of door 119 at ramp leading to Foam Zone Court. 5/1/14 - resolved
Bldg - Guard height 1013.3
Resolved
05/01/2014

2012 IBC 1013.3 – Height. Required guards shall not be less than 42 inches high, measured vertically as follows: 1. From the adjacent walking surface; 2. On stairs, from the line connecting the leading edges of the tread nosings; and 3. On ramps, from the ramp surface at the guard. (See code section for possible exceptions.) Action required: Modify detail 6/A-102 to correct guard height. 5/1/14 - resolved
Misc
Resolved
05/01/2014

2012 IPC Fixture calculations. To determine the occupant load of each sex, the total occupant load shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each fixture type shall be applied to the occupant load of each sex in accordance with Table 403.1. Fractional numbers resulting from applying the fixture ratios of Table 403.1 shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall be first be summed and then rounded up to the next whole number. (see code section for exception) Action required: Insufficient number of female water closets. Modify documents. 5/1/14 - resolved - additional femal lav added
Misc
Resolved
05/01/2014

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locates specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or protable lighitng equipment are to be used. (refer to code for exceptions) Action required. Receptacles within 6' of sinks must be GFCI protected. Modify documents. 5/1/14 - resolved
Final Development Plan
Corrective Action Required
04/30/2014

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Misc
Corrective Action Required
04/30/2014

Occupancy requirements. Action required: Comment for informational purposes. No type of occupancy may be granted before shell building has been inspected and approved.
Fire Plan Review Approved with Conditions 05/07/2014 05/06/2014
Brian Austerman
Misc
Corrective Action Required
04/30/2014

1008.1.8 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. For information only, panic hardware or thumb latch only on egress doors 5-6-14 Acknowledged
Misc
Corrective Action Required
04/30/2014

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. 5-6-14 Acknowledged Duct detectors shall be tied into the building's alarm panel and shall transmit a supervisory signal to the panel alaong with unit shutdown. ME1 12B shows a remote test station. Revision to be shown on alarm plans
Construction documents for fire alarm systems
Corrective Action Required
04/30/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval 5-6-14 Acknowledged
Construction documents - Fire protection systems
Corrective Action Required
04/30/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval. Also show location of FDC and hydrant location within 100' of FDC. Outside horn strobe is to be located over FDC and shall activate on waterflow alarm only. 5-6-14 Acknowledged
Knox box required
Corrective Action Required
04/30/2014

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Call (816) 969-1300 to obtain a knox box application. Knox box is to be mounted near outside horn strobe and FDC. 5-6-14 Acknowledged
Licensed Contractors Rejected 04/30/2014 05/01/2014
Joe Frogge
Business License
Resolved
05/01/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfully for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
License contractors
Corrective Action Required
04/30/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Licensed MEP subcontractors required. Provide the company names of the licensed MEP subcontractors.
Zoning Review Approved 04/15/2014 04/15/2014
Mike Weisenborn
Building Plan Review Rejected 04/15/2014 04/11/2014
Joe Frogge
Health Dept Review
Corrective Action Required
04/11/2014

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action Required - This comment is for information purposes.
Health Dept Inspection
Corrective Action Required
04/11/2014

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action Required - This comment is for information purposes.
Misc
Corrective Action Required
04/11/2014

2012 IBC Chapter 10 - Means of egress. Action required: Provide egress plan.
Bldg - Occupant load posting 1004.3
Corrective Action Required
04/11/2014

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Comment for informational purposes. Posting to be verified at inspections.
Misc
Corrective Action Required
04/11/2014

Miscellaneous. Action required: Clarify use of door 119 at ramp leading to Foam Zone Court.
Bldg - Guard height 1013.3
Corrective Action Required
04/11/2014

2012 IBC 1013.3 – Height. Required guards shall not be less than 42 inches high, measured vertically as follows: 1. From the adjacent walking surface; 2. On stairs, from the line connecting the leading edges of the tread nosings; and 3. On ramps, from the ramp surface at the guard. (See code section for possible exceptions.) Action required: Modify detail 6/A-102 to correct guard height.
Misc
Corrective Action Required
04/11/2014

2012 IPC Fixture calculations. To determine the occupant load of each sex, the total occupant load shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each fixture type shall be applied to the occupant load of each sex in accordance with Table 403.1. Fractional numbers resulting from applying the fixture ratios of Table 403.1 shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall be first be summed and then rounded up to the next whole number. (see code section for exception) Action required: Insufficient number of female water closets. Modify documents.
Misc
Corrective Action Required
04/11/2014

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locates specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or protable lighitng equipment are to be used. (refer to code for exceptions) Action required. Receptacles within 6' of sinks must be GFCI protected. Modify documents.
Final Development Plan
Corrective Action Required
04/11/2014

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Misc
Corrective Action Required
04/11/2014

Occupancy requirements. Action required: Comment for informational purposes. No type of occupancy may be granted before shell building has been inspected and approved.
Licensed Contractors Rejected 04/15/2014 04/11/2014
Joe Frogge
Business License
Corrective Action Required
04/11/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfully for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
License contractors
Corrective Action Required
04/11/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Licensed MEP subcontractors required. Provide the company names of the licensed MEP subcontractors.
Fire Plan Review Approved with Conditions 04/15/2014 04/08/2014
Brian Austerman
Misc
Corrective Action Required
04/08/2014

1008.1.8 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. For information only, panic hardware or thumb latch only on egress doors
Misc
Corrective Action Required
04/08/2014

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Duct detectors shall be tied into the building's alarm panel and shall transmit a supervisory signal to the panel alaong with unit shutdown. ME1 12B shows a remote test station. Revision to be shown on alarm plans
Construction documents for fire alarm systems
Corrective Action Required
04/08/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Construction documents - Fire protection systems
Corrective Action Required
04/08/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval. Also show location of FDC and hydrant location within 100' of FDC. Outside horn strobe is to be located over FDC and shall activate on waterflow alarm only.
Knox box required
Corrective Action Required
04/08/2014

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Call (816) 969-1300 to obtain a knox box application. Knox box is to be mounted near outside horn strobe and FDC.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
04/08/2014 Letter Fire Building Plan Review
04/11/2014 Letter Codes P/R Corrections Document
05/06/2014 Letter Fire Building Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home