Permit Application Status

PRCOM20140090


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20140090
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
KITCHEN / DINING EXPANSION
01/23/2014
03/07/2014
12/02/2014
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
US ENGINEERING COMPANY, Address:3433 ROANOKE RD, Phone:(816) 753-6969  
R F FISHER ELECTRIC COMPANY LLC, Address:5299 DTC BLVD STE 600, Phone:(913) 384-1500  
US ENGINEERING COMPANY, Address:3433 ROANOKE RD, Phone:(816) 753-6969  
ACI BOLAND - KANSAS CITY, Address:1421 E 104TH STREET  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 04/17/2014 04/16/2014
Mike Weisenborn
Health Dept Inspection
Corrective Action Required
04/10/2014

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required - This comment is for information purposes.
True
Fire Plan Review Approved with Conditions 04/17/2014 04/10/2014
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
04/10/2014

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval if work is required
Construction documents for fire alarm systems
Corrective Action Required
04/10/2014

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval if work is required
Misc
Corrective Action Required
04/10/2014

4-4-14 No additional FD comments
Misc
Corrective Action Required
04/10/2014

4-10-14 no additional FD comments
Fire Plan Review Approved with Conditions 02/04/2014 04/04/2014
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
04/04/2014

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval if work is required
Construction documents for fire alarm systems
Corrective Action Required
04/04/2014

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval if work is required
Misc
Corrective Action Required
04/04/2014

4-4-14 No additional FD comments
Building Plan Review Approved with Conditions 02/04/2014 02/04/2014
Mike Weisenborn
Health Dept Review
Resolved
02/04/2014

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action Required - This comment is for information purposes.
Health Dept Inspection
Corrective Action Required
01/28/2014

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required - This comment is for information purposes.
REJECTED FOR HEALTH DEPARTMENT APPROVAL.
Fire Plan Review Approved with Conditions 02/04/2014 01/29/2014
Mike Weisenborn
Construction documents - Fire protection systems
Corrective Action Required
01/29/2014

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval if work is required
Construction documents for fire alarm systems
Corrective Action Required
01/29/2014

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval if work is required
Licensed Contractors Approved 01/23/2014 01/23/2014
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $3,707.12 $3,707.12 Paid 03/07/2014
$3,707.12
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Passed 3/26/2014 3/26/2014 at 12:00 AM 03/26/2014
In-wall Inspection Partial 4/3/2014 4/3/2014 at 12:00 AM 04/03/2014
Misc
Partial Correction
04/03/2014
-APPROVED TO COVER THE FOLLOWING WITH 1ST LAYER PENDING SUCCESSFUL REVIEW: CHEF'S OFFICE, DIETARY OFFICE WALLS
Rated Assembly Inspection Partial 4/3/2014 4/4/2014 at 12:00 AM 04/04/2014
Misc
Partial Correction
04/04/2014
CHEF'S OFFICE AND DIETARY ROOM, SCREW PATTERN APPROVED SEAL ALL THROUGH PENETRATIONS
In-wall Inspection Partial 04/04/2014
Misc
Partial Correction
04/03/2014
-APPROVED TO COVER THE FOLLOWING WITH 1ST LAYER PENDING SUCCESSFUL REVIEW: CHEF'S OFFICE, DIETARY OFFICE WALLS OKAY TO COVER WEST WALL IN DRY STORAGE
Hood/Duct Inspection Partial 4/7/2014 4/7/2014 at 12:00 AM 04/07/2014
Misc
Partial Correction
04/07/2014
MAJORITY OF GREASE DUCT IN PLACE AND LIGHT-TESTED IN PLACE AS WELL AS POSSIBLE (SHOP WELDS WERE NOT LIGHT-TESTED ON FLOOR). ONE LOCATION FOUND WITH OPENINGS; WELDED SHUT ON THE SPOT. ONE 4' TIE-IN SECTION NOT YET IN PLACE; SHOP WELDS LIGHT-TESTED ON FLOOR; FOUND THREE HOLES; WELDED SHUT ON-SPOT; FIELD WELDS ON THIS SECTION TO BE INSPECTED WHEN READY. SHOP WELDS ON VERTICAL DROPS AT HOOD TO BE TESTED ON FLOOR WHEN DELIVERED; THEN FIELD WELDS TESTED IN PLACE.
Above Ceiling Inspection Partial 4/7/2014 at 12:00 AM 04/07/2014
Misc
Partial Correction
04/07/2014
IN 1A029A & 1A029B SYSTEMS ABOVE LINER BOARD HARD LID TO BE INSTALLED OK TO CONCEAL WHEN READY.
Rated Assembly Inspection Partial 4/8/2014 at 12:00 AM 04/08/2014
Misc
Partial Correction
04/04/2014
1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM: AT E WALL ONE LAYER 5/8" TYPE X GWB TO STRUCURAL DECK TAPED, MUDDED AND FIRE-SEALED; AT N, W, S WALLS ONE LAYER 5/8" TYPE X GWB AT E WALL TO LID ELEVATION PER PR#1 OK TO TAPE, MUD, AND FIRE-SEAL 1A029 STORAGE: AT N & NE WALLS FRAMING AND LINER BOARD OK TO BE COVERED WHEN READY
Rated Assembly Inspection Partial 4/8/2014 at 12:00 AM 04/08/2014
Misc
Partial Correction
04/08/2014
1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM: AT E WALL ONE LAYER 5/8" TYPE X GWB TO STRUCURAL DECK TAPED, MUDDED AND FIRE-SEALED; AT N, W, S WALLS ONE LAYER 5/8" TYPE X GWB TO LID ELEVATION PER PR#1 OK TO TAPE, MUD, AND FIRE-SEAL 1A029 STORAGE: AT N & NE WALLS FRAMING AND LINER BOARD OK TO BE COVERED WHEN READY
Rated Assembly Inspection Partial 4/11/2014 at 12:00 AM 04/11/2014
Misc
Partial Correction
04/08/2014
1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM: AT E WALL ONE LAYER 5/8" TYPE X GWB TO STRUCURAL DECK TAPED, MUDDED AND FIRE-SEALED; AT N, W, S WALLS ONE LAYER 5/8" TYPE X GWB TO LID ELEVATION PER PR#1 OK TO TAPE, MUD, AND FIRE-SEAL
Misc
Partial Correction
04/11/2014
1A029 DRY STORAGE: ALL PERIMETER WALLS BOTH FACES PER REV. 1 ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD & FIRE-SEAL
In-wall Inspection Partial 4/11/2014 at 12:00 AM 04/11/2014
Misc
Partial Correction
04/04/2014
OK TO COVER WHEN READY WALL FRAMING & IN-WALL SYSTEMS AT: CHEF'S OFFICE; DIETARY OFFICE; WEST WALL IN DRY STORAGE; WALL TO STRUCTURAL DECK ABOVE DOOR (1A029B);
Rated Assembly Inspection Partial 4/15/2014 4/15/2014 at 12:00 AM 04/15/2014
Misc
Partial Correction
04/11/2014
1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM: AT E WALL ONE LAYER 5/8" TYPE X GWB TO STRUCURAL DECK TAPED, MUDDED AND FIRE-SEALED; AT N, W, S WALLS ONE LAYER 5/8" TYPE X GWB TO LID ELEVATION PER PR#1 OK TO TAPE, MUD, AND FIRE-SEAL; FRAMING AND LINER BOARD AT RATED LIDS ABOVE 1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM; ONE LAYER 5/8" TYPE X GWB AT WALL TO STRUCTURAL DECK ABOVE DOOR (1A029B);
Misc
Partial Correction
04/11/2014
1A029 DRY STORAGE: ALL PERIMETER WALLS BOTH FACES PER REV. 1 ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD & FIRE-SEAL; NE WALL OF 1A029A SEALED TO COLUMN 5/C
Rated Assembly Inspection Partial 4/17/2014 4/17/2014 at 12:00 AM 04/17/2014
Misc
Partial Correction
04/15/2014
1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM: AT E WALL ONE LAYER 5/8" TYPE X GWB TO STRUCURAL DECK TAPED, MUDDED AND FIRE-SEALED; AT N, W, S WALLS ONE LAYER 5/8" TYPE X GWB TO LID ELEVATION PER PR#1 OK TO TAPE, MUD, AND FIRE-SEAL; FRAMING AND LINER BOARD AT RATED LIDS ABOVE 1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM; ONE LAYER 5/8" TYPE X GWB AT WALL TO STRUCTURAL DECK ABOVE DOOR (1A029B);
Misc
Partial Correction
04/15/2014
1A029 DRY STORAGE: ALL PERIMETER WALLS BOTH FACES PER REV. 1 ONE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD & FIRE-SEAL; NE WALL OF 1A029A SEALED TO COLUMN 5/C
Partial Correction
04/17/2014
LID OF DIETARY ROOM SCREW PATTERN APPROVED. HALL SIDE OF STORAGE SCREW APPROVED.
Hood/Duct Inspection Partial 4/21/2014 4/21/2014 at 12:00 AM 04/21/2014
Misc
Partial Correction
04/07/2014
MAJORITY OF GREASE DUCT IN PLACE AND LIGHT-TESTED IN PLACE AS WELL AS POSSIBLE (SHOP WELDS WERE NOT LIGHT-TESTED ON FLOOR). ONE LOCATION FOUND WITH OPENINGS; WELDED SHUT ON THE SPOT; SHOP WELDS ON VERTICAL DROPS LIGHT-TESTED ON FLOOR...FIELD WELDS AT JOINTS TO BE TESTED WHEN READY;
Hood/Duct Inspection Partial 4/22/2014 (8:00 to 5:00) 4/22/2014 at 12:00 AM 04/22/2014
Misc
Partial Correction
04/21/2014
MAJORITY OF GREASE DUCT IN PLACE AND LIGHT-TESTED IN PLACE AS WELL AS POSSIBLE (SHOP WELDS WERE NOT LIGHT-TESTED ON FLOOR). ONE LOCATION FOUND WITH OPENINGS; WELDED SHUT ON THE SPOT; SHOP WELDS ON VERTICAL DROPS LIGHT-TESTED ON FLOOR; FIELD WELDS AT JOINTS TESTED; ALL OK TO WRAP WHEN READY
Hood/Duct Inspection Partial 4/28/2014 at 12:00 AM 04/28/2014
Misc
Partial Correction
04/22/2014
MAJORITY OF GREASE DUCT IN PLACE AND LIGHT-TESTED IN PLACE AS WELL AS POSSIBLE (SHOP WELDS WERE NOT LIGHT-TESTED ON FLOOR). ONE LOCATION FOUND WITH OPENINGS; WELDED SHUT ON THE SPOT; SHOP WELDS ON VERTICAL DROPS LIGHT-TESTED ON FLOOR; FIELD WELDS AT JOINTS TESTED; ALL OK TO WRAP WHEN READY; DUCT WRAP INSTALLED.
Misc
Corrective Action Required
04/28/2014
IMC 507.16 COMMERCIAL KITCHEN GREASE HOOD PERFORMANCE TEST: NEBB-CERTIFIED REPORT REQUIRED TO BE SUBMITTED TO INSPECTOR WHEN EQUIPMENT IS OPERATIONAL AND BEFORE COMMERCIAL USE. SMOKE CAPTURE TEST TO BE CERTIFIED BY 3RD PARTY OR WITNESSED BY INSPECTOR BEFORE ANY USE IS APPROVED.
In-wall Inspection Partial 5/5/2014 at 12:00 AM 05/05/2014
Misc
Partial Correction
04/11/2014
OK TO COVER WHEN READY WALL FRAMING & IN-WALL SYSTEMS AT: CHEF'S OFFICE; DIETARY OFFICE; WEST WALL IN DRY STORAGE; WALL TO STRUCTURAL DECK ABOVE DOOR (1A029B); WALL @ DOOR OPENING TO 1A021A; EAST WALL AT 1A021C;
In-wall Inspection Partial 5/6/2014 at 12:00 AM 05/06/2014
Misc
Partial Correction
05/05/2014
OK TO COVER WHEN READY WALL FRAMING & IN-WALL SYSTEMS AT: CHEF'S OFFICE; DIETARY OFFICE; WEST WALL IN DRY STORAGE; WALL TO STRUCTURAL DECK ABOVE DOOR (1A029B); WALL @ DOOR OPENING TO 1A021A; EAST WALL AT 1A021C;
Above Ceiling Inspection Partial 5/7/2014 5/7/2014 at 12:00 AM 05/07/2014
Misc
Resolved
05/07/2014
IN 1A029A & 1A029B SYSTEMS ABOVE LINER BOARD HARD LID TO BE INSTALLED OK TO CONCEAL WHEN READY.
Misc
Partial Correction
05/07/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1A029; 1A029A; 1A029B;
Above Ceiling Inspection Partial 5/14/2014 5/13/2014 at 12:00 AM 05/13/2014
Misc
Partial Correction
05/07/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1A029; 1A029A; 1A029B; 1A021; 1A021D; 1A021E;
Above Ceiling Inspection Partial 5/14/2014 at 12:00 AM 05/14/2014
Misc
Partial Correction
05/13/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1A029; 1A029A; 1A029B; 1A021; 1A021D; 1A021E;
Above Ceiling Inspection Passed 5/21/2014 at 12:00 AM 05/21/2014
Misc
Resolved
05/21/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1A029; 1A029A; 1A029B; 1A021; 1A021D; 1A021E;
In-wall Inspection Passed 5/21/2014 at 12:00 AM 05/21/2014
Misc
Resolved
05/21/2014
OK TO COVER WHEN READY WALL FRAMING & IN-WALL SYSTEMS AT: CHEF'S OFFICE; DIETARY OFFICE; WEST WALL IN DRY STORAGE; WALL TO STRUCTURAL DECK ABOVE DOOR (1A029B); WALL @ DOOR OPENING TO 1A021A; EAST WALL AT 1A021C;
Rated Assembly Inspection Passed 5/21/2014 at 12:00 AM 05/21/2014
Misc
Resolved
05/21/2014
1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM: AT E WALL ONE LAYER 5/8" TYPE X GWB TO STRUCURAL DECK TAPED, MUDDED AND FIRE-SEALED; AT N, W, S WALLS ONE LAYER 5/8" TYPE X GWB TO LID ELEVATION PER PR#1 OK TO TAPE, MUD, AND FIRE-SEAL; FRAMING AND LINER BOARD AT RATED LIDS ABOVE 1A029A & 1A029B CHEF'S OFFICE AND DIETARY ROOM; ONE LAYER 5/8" TYPE X GWB AT WALL TO STRUCTURAL DECK ABOVE DOOR (1A029B);
Hood/Duct Inspection Partial 5/22/2014 at 12:00 AM 05/22/2014
Misc
Resolved
05/22/2014
MAJORITY OF GREASE DUCT IN PLACE AND LIGHT-TESTED IN PLACE AS WELL AS POSSIBLE (SHOP WELDS WERE NOT LIGHT-TESTED ON FLOOR). ONE LOCATION FOUND WITH OPENINGS; WELDED SHUT ON THE SPOT; SHOP WELDS ON VERTICAL DROPS LIGHT-TESTED ON FLOOR; FIELD WELDS AT JOINTS TESTED; ALL OK TO WRAP WHEN READY; DUCT WRAP INSTALLED.
Misc
Corrective Action Required
04/28/2014
IMC 507.16 COMMERCIAL KITCHEN GREASE HOOD PERFORMANCE TEST: NEBB-CERTIFIED REPORT REQUIRED TO BE SUBMITTED TO INSPECTOR WHEN EQUIPMENT IS OPERATIONAL AND BEFORE COMMERCIAL USE. SMOKE CAPTURE TEST TO BE CERTIFIED BY 3RD PARTY OR WITNESSED BY INSPECTOR BEFORE ANY USE IS APPROVED.
Gas Piping Inspection - Commercial Passed 6/11/2014 6/11/2014 at 12:00 AM 06/11/2014
Hood/Duct Inspection Passed 6/13/2014 at 12:00 AM 06/13/2014
Misc
Resolved
06/13/2014
IMC 507.16 COMMERCIAL KITCHEN GREASE HOOD PERFORMANCE TEST: NEBB-CERTIFIED REPORT REQUIRED TO BE SUBMITTED TO INSPECTOR WHEN EQUIPMENT IS OPERATIONAL AND BEFORE COMMERCIAL USE. SMOKE CAPTURE TEST TO BE CERTIFIED BY 3RD PARTY OR WITNESSED BY INSPECTOR BEFORE ANY USE IS APPROVED.
Alarm Test Passed 6/13/2014 at 12:00 AM 06/13/2014
Alternate Protection Systems Inspection Failed 6/13/2014 at 12:00 AM 06/13/2014
Miscellaneous Inspection Partial 6/13/2014 at 12:00 AM 06/13/2014
Occupancy Inspection - Fire Temporary C of O 6/16/2014 6/16/2014 at 12:00 AM 06/16/2014
Misc
Corrective Action Required
06/16/2014
-identify all hoods and pull stations - hood-3 pass the trip test - in-service tag for hood-3
Alternate Protection Systems Inspection Failed 6/13/2014 at 12:00 AM 06/16/2014
Occupancy Inspection - Codes Commercial Partial 6/16/2014 6/16/2014 at 12:00 AM 06/16/2014
Misc
Partial Correction
06/16/2014
OK TO MOVE IN AND USE PHASE 1 AREA EXCEPT GREASE HOOD. INSTALLATION / RELOCATION OF SOME KITCHEN EQUIPMENT IS ON-GOING; BUILDING AND M/E/P SYSTEMS OK TO RECEIVE AND OPERATE EXCEPT EMERGENCY SYSTEMS AT GREASE HOOD YET TO BE APPROVED BY FIRE DEPT.
Occupancy Inspection - Fire Temporary C of O 6/18/2014 at 12:00 AM 06/18/2014
Misc
Corrective Action Required
06/16/2014
-identify all hoods and pull stations - hood-3 pass the trip test - in-service tag for hood-3
Alternate Protection Systems Inspection Passed 6/18/2014 at 12:00 AM 06/18/2014
Occupancy Inspection - Codes Commercial Not Ready 6/19/2014 at 12:00 AM 06/19/2014
Misc
Partial Correction
06/16/2014
OK TO MOVE IN AND USE PHASE 1 AREA INCLUDING GREASE HOOD. INSTALLATION / RELOCATION OF SOME KITCHEN EQUIPMENT IS ON-GOING.
In-wall Inspection Partial 7/17/2014 at 12:00 AM 07/17/2014
Misc
Partial Correction
07/17/2014
PHASE 2 WALL FRAMING AND IN-WALL SYSTEMS OK TO COVER WHEN READY EXCEPT AT DOOR 1A020A TO BE REMOVED -- AFTER ONE SHIELD PLATE IS PLACED AT S WALL
Above Ceiling Inspection Partial 7/17/2014 at 12:00 AM 07/17/2014
Partial Correction
07/17/2014
PHASE 2 GWB SOFFITS AND BULKHEADS OK TO COVER WHEN READY AFTER ELECTRICAL WORK IS COMPLETED PER NEC
In-wall Inspection Partial 8/6/2014 8/6/2014 at 12:00 AM 08/06/2014
Misc
Partial Correction
07/17/2014
PHASE 2 WALL FRAMING AND IN-WALL SYSTEMS OK TO COVER WHEN READY EXCEPT AT DOOR 1A020A TO BE REMOVED -- AFTER ONE SHIELD PLATE IS PLACED AT S WALL; IN-FILL AT (1.3)/(B.5);
Miscellaneous Inspection Passed 8/7/2014 at 12:00 AM 08/07/2014
Above Ceiling Inspection Partial 8/13/2014 8/13/2014 at 12:00 AM 08/13/2014
Misc
Corrective Action Required
08/13/2014
PHASE 2 KITCHEN AREA: REMOVE ANY UNUSED / ABANDONED HANGERS AND BRACES. EXAMPLE -- ALL-THREAD ROD HANGERS AT SELF-SERVE AND AT NW CORNER
Above Ceiling Inspection Partial 8/14/2014 at 12:00 AM 08/14/2014
Misc
Partial Correction
08/14/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: PHASE 2 KITCHEN AREA EXCEPT SE CORNER INTERFACE AREA TO SUBSEQUENT PHASE;
Rough Electrical Inspection - Commercial Passed 8/22/2014 at 12:00 AM 08/22/2014
In-wall Inspection Passed 8/22/2014 8/6/2014 at 12:00 AM 08/22/2014
Misc
Resolved
08/22/2014
PHASE 2 WALL FRAMING AND IN-WALL SYSTEMS OK TO COVER WHEN READY EXCEPT AT DOOR 1A020A TO BE REMOVED -- AFTER ONE SHIELD PLATE IS PLACED AT S WALL; IN-FILL AT (1.3)/(B.5);
Alarm Test Passed 9/15/2014 at 12:00 AM 09/15/2014
Occupancy Inspection - Codes Commercial Partial 9/19/2014 at 12:00 AM 09/19/2014
Misc
Partial Correction
06/19/2014
OK TO MOVE IN AND USE PHASE 1 AREA INCLUDING GREASE HOOD;
Misc
Partial Correction
09/19/2014
KITCHEN PHASE 2 AREA PRE-FINALED 9/19/14.
Occupancy Inspection - Codes Commercial Partial 10/7/2014 10/7/2014 at 12:00 AM 10/07/2014
Misc
Partial Correction
09/19/2014
OK TO OCCUPY AND USE EXPANDED/RENOVATED KITCHEN AREAS: PHASE 1 AREA INCLUDING GREASE HOOD; PHASE 2 AREA;
Misc
Resolved
10/07/2014
KITCHEN PHASE 2 AREA PRE-FINALED 9/19/14.
Occupancy Inspection - Fire Temporary C of O 10/7/2014 10/7/2014 at 12:00 AM 10/07/2014
Misc
Corrective Action Required
06/18/2014
-identify all hoods and pull stations - hood-3 pass the trip test - in-service tag for hood-3
Occupancy Inspection - Fire Passed 10/16/2014 at 12:00 AM 10/16/2014
Misc
Corrective Action Required
10/07/2014
-identify all hoods and pull stations - hood-3 pass the trip test - in-service tag for hood-3
Above Ceiling Inspection Partial 10/30/2014 10/30/2014 at 12:00 AM 10/30/2014
Misc
Partial Correction
08/14/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: PHASE 2 KITCHEN AREA SE CORNER HARD LID SOFFIT OKAY TO COVER
Above Ceiling Inspection Not Ready 11/21/2014 11/21/2014 at 12:00 AM 11/21/2014
Misc
Partial Correction
10/30/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: PHASE 2 KITCHEN AREA SE CORNER HARD LID SOFFIT OKAY TO COVER
Misc
Corrective Action Required
11/21/2014
DINING AREA 1A020 SE: PERMIT PRINTS NOT FOUND IN WORK AREA
Misc
Corrective Action Required
11/21/2014
DINING AREA 1A020 SE: CLOSE ALL ELECTRICAL BOXES. SEE ONE ABOVE CENTER OF SPACE
Misc
Corrective Action Required
11/21/2014
DINING AREA 1A020 SE: CONDUIT RUN FROM SW CORNER TO F.A. BOX @ W WALL CENTER -- ROUTE AND SECURE TO WALL PROPERLY
Misc
Corrective Action Required
11/21/2014
PLACEMENT / SUPPORT / SECURING OF LOW VOLTAGE ELECTRICAL CABLE: ROUTE HIGH IN INTERSTITIAL SPACE >= 18" ABOVE CEILING GRID; NOT TO BE LAID LOOSE ON CEILING GRID; DROP TO TERMINATIONS WHERE LOCATED. SUPPORT FROM STRUCTURE -- NOT FROM OTHER M/E/P SYSTEMS. NOT TO BE SUPPORTED BY CEILING SUPPORT WIRES.
Misc
Corrective Action Required
11/21/2014
PLASTIC BUCKET ABOVE CEILING NEAR NW CORNER OF SPACE??
Above Ceiling Inspection Partial 11/25/2014 11/25/2014 at 12:00 AM 11/25/2014
Misc
Partial Correction
11/21/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: PHASE 2 KITCHEN AREA SE CORNER OKAY TO COVER
Misc
Resolved
11/25/2014
DINING AREA 1A020 SE: PERMIT PRINTS NOT FOUND IN WORK AREA
Misc
Resolved
11/25/2014
DINING AREA 1A020 SE: CLOSE ALL ELECTRICAL BOXES. SEE ONE ABOVE CENTER OF SPACE
Misc
Resolved
11/25/2014
DINING AREA 1A020 SE: CONDUIT RUN FROM SW CORNER TO F.A. BOX @ W WALL CENTER -- ROUTE AND SECURE TO WALL PROPERLY
Misc
Resolved
11/25/2014
PLACEMENT / SUPPORT / SECURING OF LOW VOLTAGE ELECTRICAL CABLE: ROUTE HIGH IN INTERSTITIAL SPACE >= 18" ABOVE CEILING GRID; NOT TO BE LAID LOOSE ON CEILING GRID; DROP TO TERMINATIONS WHERE LOCATED. SUPPORT FROM STRUCTURE -- NOT FROM OTHER M/E/P SYSTEMS. NOT TO BE SUPPORTED BY CEILING SUPPORT WIRES.
Misc
Resolved
11/25/2014
PLASTIC BUCKET ABOVE CEILING NEAR NW CORNER OF SPACE??
Occupancy Inspection - Codes Commercial Full C of O 12/2/2014 12/2/2014 at 12:00 AM 12/02/2014
Misc
Resolved
12/02/2014
OK TO OCCUPY AND USE EXPANDED/RENOVATED KITCHEN AREAS: PHASE 1 AREA INCLUDING GREASE HOOD; PHASE 2 AREA;
Above Ceiling Inspection Passed 12/2/2014 at 12:00 AM 12/02/2014
Misc
Resolved
12/02/2014
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: PHASE 2 KITCHEN AREA SE CORNER OKAY TO COVER
Occupancy Inspection - Fire Passed 12/2/2014 at 12:00 AM 12/02/2014
Documents & Images
Date Uploaded File Type Document Name
01/29/2014 Letter Fire Building Plan Review
02/04/2014 Letter Codes Plan Review Conditions
03/07/2014 Letter Codes Building Permit
03/26/2014 Letter Inspection Summary
04/03/2014 Letter Inspection Summary
04/04/2014 Letter Inspection Summary
04/04/2014 Letter Fire Building Plan Review
04/07/2014 Letter Inspection Summary
04/08/2014 Letter Inspection Summary
04/10/2014 Letter Fire Building Plan Review
04/11/2014 Letter Inspection Summary
04/15/2014 Letter Inspection Summary
04/17/2014 Letter Inspection Summary
04/21/2014 Letter Inspection Summary
04/22/2014 Letter Inspection Summary
04/28/2014 Letter Inspection Summary
05/05/2014 Letter Inspection Summary
05/07/2014 Letter Inspection Summary
05/13/2014 Letter Inspection Summary
05/22/2014 Letter Inspection Summary
06/11/2014 Letter Inspection Summary
06/13/2014 Letter Inspection Summary
06/16/2014 Letter Inspection Summary
06/19/2014 Letter Inspection Summary
07/17/2014 Letter Inspection Summary
08/06/2014 Letter Inspection Summary
08/12/2014 Activity Document DOC081214-003
08/12/2014 Activity Document DOC081214-004
08/13/2014 Letter Inspection Summary
08/14/2014 Letter Inspection Summary
08/22/2014 Letter Inspection Summary
09/12/2014 Letter Fire Loss Reduction Form
10/07/2014 Letter Inspection Summary
10/30/2014 Letter Inspection Summary
11/21/2014 Letter Inspection Summary
11/25/2014 Letter Inspection Summary
12/02/2014 Letter Field Certificate of Occupancy
12/02/2014 Letter Field Certificate of Occupancy
12/03/2014 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home