Permit Application Status

PRCOM20132731


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20132731
Building Permit - Commercial
Voided
LBP V LLC
NEW SHELL BUILDING
NEW SHELL BUILDING INTENDED FOR OFFICE/WAREHOUSE USE Mike Weisenborn 01/14/2015 4:34 PM - FDP AND BUILDING PERMIT APPLICATION EXTENDED FOR ONE YEAR. Mike Weisenborn 01/21/2016 2:36 PM - Per Mike Atcheson, they will not be moving forward at this time and will resubmit when they are ready to develope the property.
12/27/2013
01/23/2016
01/21/2016
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
  
  
  
DAVIDSON DESIGN GROUP, Address:11301 STRANG LINE RD, Phone:(913) 451-9390  
LBP V LLC, Address:3215 NE CARNEGIE DR STE 200, Phone:(816) 795-8100  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Rejected 01/23/2016 01/21/2016
Mike Weisenborn
License contractors
Corrective Action Required
01/13/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Provide the names of the licensed mechanical, electrical and plumbing sub contractors. This information is required for permit approval.
LBPV SHELL BUILDING - IN PLAN CHECK
Building Plan Review Approved with Conditions 01/24/2014 01/22/2014
Mike Weisenborn
Bldg - Special inspections - Report requirement
Resolved
06/10/2015

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action reqired - This comment is for information purposes. 5/7/15
Fire Plan Review Approved with Conditions 01/24/2014 01/17/2014
Brian Austerman
Misc
Corrective Action Required
01/17/2014

Reviewed as a shell, provide interior details for interior finish
Construction documents - Fire protection systems
Corrective Action Required
01/17/2014

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
01/17/2014

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Misc
Corrective Action Required
01/17/2014

Keyed locks are not allowed on marked exits, panic hardware or thumb latch only. For information only
Misc
Corrective Action Required
01/17/2014

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Shall apply to units over 2,000 cfm
Portable fire extinguishers - general
Corrective Action Required
01/17/2014

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide 2A10B:C extinguishers, 1 for every 3,000 sq/ft or every 75' travel distance
Building Plan Review Approved with Conditions 01/13/2014 01/16/2014
Mike Weisenborn
Bldg - Special inspections - Statement of special inspections
Resolved
01/16/2014

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Provide a statement of special inspections.
Bldg - Special inspections - Report requirement
Informational
01/13/2014

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action reqired - This comment is for information purposes.
Special Inspections Review Approved 07/12/2014 01/16/2014
Mike Weisenborn
RECEIVED STATEMENT OF SPECIAL INSPECTIONS
Fire Plan Review Approved with Conditions 01/13/2014 01/02/2014
Brian Austerman
Misc
Corrective Action Required
01/02/2014

Reviewed as a shell, provide interior details for interior finish
Construction documents - Fire protection systems
Corrective Action Required
01/02/2014

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
01/02/2014

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Misc
Corrective Action Required
01/02/2014

Keyed locks are not allowed on marked exits, panic hardware or thumb latch only. For information only
Misc
Corrective Action Required
01/02/2014

907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Shall apply to units over 2,000 cfm
Portable fire extinguishers - general
Corrective Action Required
01/02/2014

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide 2A10B:C extinguishers, 1 for every 3,000 sq/ft or every 75' travel distance
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
01/02/2014 Letter Fire Building Plan Review
01/13/2014 Letter Codes Plan Review Conditions
01/17/2014 Letter Fire Building Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home