Permit Application Status

PRCOM20132507


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20132507
Building Permit - Commercial
Final Completion
DRIENIK INVESTMENTS LLC
ALTERATION COMMERCIAL
ROOF MOUNTED PV SYSTEM - SOLAR - 24.71 KW
11/14/2013
12/20/2013
02/14/2014
Locations
Contacts
DRIENIK INVESTMENTS LLC, Address:1009 SE BROWNING ST  
FACILITY SOLUTIONS GROUP INC, Address:17880 W 99TH ST, Phone:(913) 422-8400  
BRIGHTERGY LLC, Address:1712 MAIN STREEET 6TH FLOOR, Phone:(816) 866-0555  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 11/26/2013 11/25/2013
Mike Weisenborn
Misc
Corrective Action Required
11/25/2013

Lee's Summit Unified Development Ordinance - Section 8.150.B. Roof-mounted solar collectors located on front or side building roofs, which are visible from the public right-of-way, shall not extend above the peak of the roof plane on which they are mounted, and no portion of the solar collector shall extend more than twenty four (24) inches perpendicular to the point of the roof where it is mounted. Action required - This comment is for information purposes and compliance will be verified on inspection.
Licensed Contractors Approved 11/26/2013 11/22/2013
Mike Weisenborn
Fire Plan Review Approved with Conditions 11/26/2013 11/22/2013
Jim Eden
Misc
Corrective Action Required
11/22/2013

102.7 Subjects not regulated by this code. Where no applicable standards or requirements are set forth in this code, or are contained within other laws, codes, regulations, ordinances or bylaws adopted by the jurisdiction, compliance with applicable standards of the National Fire Protection Association or other nationally recognized fire safety standards, as approved, shall be deemed as prima facie evidence of compliance with the intent of this code. Nothing herein shall derogate from the authority of the fire code official to determine compliance with codes or standards for those activities or installations within the fire code official’s jurisdiction or responsibility. The review of this application was completed referencing the 2012 IFC which was adopted by the City of Lee's Summit effective Jan. 1, 2014. The 2006 IFC does not reference PV systems. Approved per revised plans.
Misc
Corrective Action Required
11/22/2013

All markings subject to site inspection.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $65.98 $65.98 Paid 12/02/2013
$65.98
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Electrical Inspection - Commercial Failed 12/31/2013 12/31/2013 at 12:00 AM 12/31/2013
Misc
Corrective Action Required
12/31/2013
-INSTALL DIRECTORY/PLAQUE PER NOTE 4 -REMOVE ENAMEL AT BONDING CONNECTION INSIDE SOLAR AC DISCONNECT -THE PANEL WHERE THE SOLAR A/C CIRCUIT (125 AMP) SUPPLYING TO AND FED FROM MDP WITH 200 AMP BREAKER. THE TOTAL AMPERAGE OF BREAKERS (125 AMP + 200 AMP) FEEDING THE PANEL CANNOT EXCEED 120% OF THE RATING OF THE PANEL
Final Electrical Inspection - Commercial Failed 1/3/2014 1/3/2014 at 12:00 AM 01/03/2014
Misc
Corrective Action Required
12/31/2013
-INSTALL DIRECTORY LABEL REQUIRED PER NEC 705.12(D)(4) AND 705.10 PER NOTE 4. 2 LABELS REQUIRED -THE CIRCUIT ON THE LOADED SIDE OF THE COMBINED PANEL IS NOT PER PLAN. THE PANEL WHERE THE COMBINED PV AC CIRCUIT (125 AMP) SUPPLYING TO AND FED FROM MDP WITH 200 AMP BREAKER- THE TOTAL AMPERAGE OF BREAKERS (125 AMP + 200 AMP) FEEDING THE PANEL CANNOT EXCEED 120% OF THE RATING OF THE PANEL BUS BAR
Final Electrical Inspection - Commercial Failed 1/31/2014 1/31/2014 at 12:00 AM 01/31/2014
Misc
Corrective Action Required
01/03/2014
-INSTALL DIRECTORY LABEL REQUIRED PER NEC 705.12(D)(4) AND 705.10 PER NOTE 4. 2 LABELS REQUIRED **THERE ARE 2 SERVICES TO THIS BUILDING. HAVE THE DIRECTORY DISPLAYS ALL SERVICE LOCATIONS -HAVE THE PLAN REDRAWN. 125 AMP FUSES INSTALLED INSTEAD OF 100 AMP -INSIDE THE TRANSFORMER ENCLOSURE: 1) INSTALL LUG LISTED FOR 2 GROUNDING CONDUCTORS 2) SWITCH THE HIGH LEG OF THE DELTA SYSTEM TO THE B PHASE LUG AND CONNECT THE 2 SOLAR PHASE CONDUCTORS TO A&C LUGS. TAPE THE HIGH LEG WITH ORANGE TAPE
Final Electrical Inspection - Commercial Passed 2/14/2014 2/14/2014 at 12:00 AM 02/14/2014
Misc
Resolved
02/14/2014
-INSTALL DIRECTORY LABEL REQUIRED PER NEC 705.12(D)(4) AND 705.10 PER NOTE 4. 2 LABELS REQUIRED **THERE ARE 2 SERVICES TO THIS BUILDING. HAVE THE DIRECTORY DISPLAYS ALL SERVICE LOCATIONS -HAVE THE PLAN REDRAWN. 125 AMP FUSES INSTALLED INSTEAD OF 100 AMP -INSIDE THE TRANSFORMER ENCLOSURE: 1) INSTALL LUG LISTED FOR 2 GROUNDING CONDUCTORS 2) SWITCH THE HIGH LEG OF THE DELTA SYSTEM TO THE B PHASE LUG AND CONNECT THE 2 SOLAR PHASE CONDUCTORS TO A&C LUGS. TAPE THE HIGH LEG WITH ORANGE TAPE
Documents & Images
Date Uploaded File Type Document Name
12/02/2013 Letter Codes Plan Review Conditions
12/02/2013 Letter Codes Building Permit
12/18/2013 Letter Fire Building Plan Review
12/31/2013 Letter Inspection Summary
01/03/2014 Letter Inspection Summary
01/31/2014 Letter Inspection Summary
02/14/2014 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: