Permit Application Status

PRCOM20131761


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20131761
Building Permit - Commercial
Certificate of Occupancy
MIDWEST DIVISION LSH LLC
ALTERATION COMMERCIAL
REMODEL
08/14/2013
09/04/2013
02/22/2014
09/04/2015
Locations
Contacts
LYTLE CONSTRUCTION INC, Address:18505 E 163RD ST, Phone:(816) 524-7275  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
BROADWAY ELECTRICAL CONSTRUCTION CO, Address:510 MIAMI AVENUE, Phone:(913) 621-3553  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
MIDWEST DIVISION LSH LLC, Address:PO BOX 1504  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 09/10/2013 09/03/2013
Mike Weisenborn
Suite address
Resolved
09/03/2013

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required - Provide the suite/unit number for the spaces.
Fire Plan Review Approved with Conditions 09/10/2013 09/03/2013
Mike Weisenborn
Construction documents - Fire protection systems
Corrective Action Required
09/03/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
09/03/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Licensed Contractors Approved 02/22/2014 08/27/2013
Mike Weisenborn
License contractors
Resolved
08/27/2013

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Broadway Electric does not have a current business license in Lee's Summit. A licensed electrican will need to be provided prior to permit approval.
Building Plan Review Rejected 08/26/2013 08/26/2013
Mike Weisenborn
Suite address
Corrective Action Required
08/26/2013

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required - Provide the suite/unit number for the spaces.
Fire Plan Review Approved with Conditions 08/26/2013 08/23/2013
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
08/23/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
08/23/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $593.82 $593.82 Paid 09/04/2013
$593.82
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Above Ceiling Inspection Passed 11/15/2013 11/15/2013 at 12:00 AM 11/15/2013
Underslab Electrical Inspection - Commercial Passed 11/15/2013
In-wall Inspection Passed 11/15/2013
Alarm Test Passed 12/2/2013 at 12:00 AM 12/02/2013
Occupancy Inspection - Fire Temporary C of O 12/2/2013 at 12:00 AM 12/02/2013
Misc
Corrective Action Required
12/02/2013
-Hospital will be suppling the suite addressing for off the corridor - Emergency generator power test will be conducted later in December, written conformation will be supplied by elec contractor of results of test. -alarm plans will be supplied by Seimens
Occupancy Inspection - Codes Commercial Temporary C of O 12/2/2013 12/2/2013 at 12:00 AM 12/02/2013
Misc
Corrective Action Required
12/02/2013
OBTAIN FIRE DEPARTMENT APPROVAL BY TESTING GENERATOR.
Occupancy Inspection - Fire Passed 12/16/2013 at 12:00 AM 12/16/2013
Misc
Corrective Action Required
12/02/2013
-Hospital will be suppling the suite addressing for off the corridor - Emergency generator power test will be conducted later in December, written conformation will be supplied by elec contractor of results of test. -alarm plans will be supplied by Seimens
Occupancy Inspection - Codes Commercial Full C of O 09/04/2015
Misc
Corrective Action Required
12/02/2013
OBTAIN FIRE DEPARTMENT APPROVAL BY TESTING GENERATOR.
Underslab Plumbing Inspection - Commercial Not Complete 01/09/2018
Underground Plumbing Inspection - Commercial Not Complete 01/09/2018
All Rough Inspection - Commercial Not Complete 01/09/2018
Final Electrical Inspection - Commercial Not Complete 01/09/2018
Rough Electrical Inspection - Commercial Not Complete 01/09/2018
Rough Plumbing Inspection - Commercial Not Complete 01/09/2018
Underground Electrical Inspection - Commercial Not Complete 01/09/2018
Rough Mechanical Inspection - Commercial Not Complete 01/09/2018
Final Plumbing Inspection - Commercial Not Complete 01/09/2018
Documents & Images
Date Uploaded File Type Document Name
08/26/2013 Letter Codes Plan Review Conditions
08/27/2013 Letter Fire Building Plan Review
09/03/2013 Letter Codes Plan Review Conditions
09/04/2013 Letter Codes Building Permit
11/15/2013 Letter Inspection Summary
12/02/2013 Letter Codes Temporary Certificate of Occupancy
09/09/2015 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home