Permit Application Status

PRCOM20130791


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20130791
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION OTHER COM
PARKING LOT LIGHTING AND RETAINING WALL
05/01/2013
05/20/2013
11/02/2013
05/15/2014
Locations
Contacts
TURNER CONSTRUCTION COMPANY, Address:1220 WASHINGTON STE 1000, Phone:(816) 283-0555  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 05/15/2013 05/29/2013
Brian Austerman
Final Development Plan Review Approved 11/02/2013 05/16/2013
Mike Weisenborn
Building Plan Review Approved 05/15/2013 05/08/2013
Mike Weisenborn
Bldg - Special inspections - Statement of special inspections
Resolved
05/08/2013

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Provide a statement of special inspections.
Bldg - Special inspections - Report requirement
Corrective Action Required
05/08/2013

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Special Inspections Review Approved 11/02/2013 05/08/2013
Mike Weisenborn
Fire Plan Review Approved 05/15/2013 05/08/2013
Mike Weisenborn
Building Plan Review Rejected 05/06/2013 05/06/2013
Mike Weisenborn
Misc
Resolved
05/06/2013

Plans for the retaining wall have not been provided. Action required - Provide design details for the retaining wall.
Bldg - Special inspections - Statement of special inspections
Corrective Action Required
05/06/2013

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Provide a statement of special inspections.
Bldg - Special inspections - Report requirement
Corrective Action Required
05/06/2013

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Licensed Contractors Approved 05/01/2013 05/01/2013
Codes Admin
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Add/Alter Other $1,023.00 $1,023.00 Paid 05/20/2013
$1,023.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 6/14/2013 6/14/2013 at 12:00 AM 06/14/2013
Misc
Partial Correction
06/14/2013
OK TO POUR WHEN READY AFTER RE-BAR IS >= 3" CLEAR OF BOTTOMS & BANKS FOLLOWING SEGMENTS OF FOOTING FOR RETAINING WALL: 0+00 TO 0+75; 0+75 TO 1+75;
Footing Inspection - Commercial Partial 6/19/2013 (11:30) 6/19/2013 at 12:00 AM 06/19/2013
Misc
Partial Correction
06/14/2013
OK TO POUR WHEN READY AFTER RE-BAR IS >= 3" CLEAR OF BOTTOMS & BANKS FOLLOWING SEGMENTS OF FOOTING FOR RETAINING WALL: 0+00 TO 0+75; 0+75 TO 1+75; 3+24
Underground Electrical Inspection - Commercial Partial 6/26/2013 at 12:00 AM 06/26/2013
Misc
Partial Correction
06/26/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER;
Retaining Wall Inspection Partial 6/27/2013 6/27/2013 at 12:00 AM 06/27/2013
Misc
Partial Correction
06/27/2013
OK TO POUR WHEN READY FOLLOWING SEGMENTS OF C.I.P. CONCRETE RETAINING WALL AT PARKING LOT EAST: 0+0 TO 0+75;
Retaining Wall Inspection Partial 7/1/2013 7/1/2013 at 12:00 AM 07/01/2013
Misc
Partial Correction
06/27/2013
OK TO POUR WHEN READY FOLLOWING SEGMENTS OF C.I.P. CONCRETE RETAINING WALL AT PARKING LOT EAST: 0+0 TO 0+75; 0+75 TO 0+200;
Retaining Wall Inspection Partial 7/3/2013 7/3/2013 at 12:00 AM 07/03/2013
Misc
Partial Correction
07/01/2013
OK TO POUR WHEN READY FOLLOWING SEGMENTS OF C.I.P. CONCRETE RETAINING WALL AT PARKING LOT EAST: 0+0 TO 0+75; 0+75 TO 0+200; 0+200 to 0+324
Underground Electrical Inspection - Commercial Partial 7/11/2013 7/11/2013 at 12:00 AM 07/11/2013
Misc
Partial Correction
06/26/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER;
Footing Inspection - Commercial Passed 6/19/2013 at 12:00 AM 07/12/2013
Misc
Resolved
07/12/2013
OK TO POUR WHEN READY AFTER RE-BAR IS >= 3" CLEAR OF BOTTOMS & BANKS FOLLOWING SEGMENTS OF FOOTING FOR RETAINING WALL: 0+00 TO 0+75; 0+75 TO 1+75; 3+24
Retaining Wall Inspection Passed 7/3/2013 at 12:00 AM 07/12/2013
Misc
Resolved
07/12/2013
OK TO POUR WHEN READY FOLLOWING SEGMENTS OF C.I.P. CONCRETE RETAINING WALL AT PARKING LOT EAST: 0+0 TO 0+75; 0+75 TO 0+200; 0+200 to 0+324
Underground Electrical Inspection - Commercial Partial 7/12/2013 7/12/2013 at 12:00 AM 07/12/2013
Misc
Partial Correction
07/11/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER; PVC CONDUIT TO & IN THE AREA OF L.P.#5; 11; 15; 21; 25;
Underground Electrical Inspection - Commercial Partial 7/18/2013 (8:00 to 5:00) 7/18/2013 at 12:00 AM 07/18/2013
Misc
Partial Correction
07/12/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER; PVC CONDUIT TO & IN THE AREA OF L.P.#5; 11; 15; 21; 25;
Misc
Partial Correction
07/18/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #10; 11; 15; 21;
Underground Electrical Inspection - Commercial Partial 7/22/2013 7/22/2013 at 12:00 AM 07/22/2013
Misc
Partial Correction
07/18/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER; PVC CONDUIT TO & IN THE AREA OF L.P.#5; 11; 15; 21; 25; [4; 5; 9; 10; 10*; 25;
Misc
Partial Correction
07/18/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #10; 11; 15; 21; [4; 5; 9; 10a; 10b; 25;
Final Inspection - Commercial Partial 7/29/2013 7/29/2013 at 12:00 AM 07/29/2013
Misc
Corrective Action Required
07/12/2013
OBTAIN PLANNING AND DEVELOPMENT APPROVAL: : PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER HECTOR SOTO
Misc
Corrective Action Required
07/12/2013
OBTAIN FIRE DEPARTMENT APPROVAL: ONE ISSUE NOTED SEPERATELY
Misc
Corrective Action Required
07/12/2013
RESOLVE ANY PUBLIC WORKS ISSUES: PHAS 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER JON HALEY
Misc
Corrective Action Required
07/29/2013
RESOLVE ANYWATER DEPT ISSUES: PHASE 1 FINAL 7/29/13: CONTACT BEN HASKAMP FOR DETERMINATION
Misc
Corrective Action Required
07/29/2013
CODES ADMINISTRATION: PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY -- OK FOR USE
Occupancy Inspection - Fire Temporary C of O 7/29/2013 at 12:00 AM 07/29/2013
Misc
Corrective Action Required
07/29/2013
-fire hydrant south of main entrance of 100 bldg needs to be rotated 180 degrees so the 4" discharge is facing the roadway -top portion of all hydrants needs to be painted silver -secure the lid to the backflow pit
Underground Electrical Inspection - Commercial Not Ready 8/12/2013 8/12/2013 at 12:00 AM 08/12/2013
Misc
Partial Correction
07/22/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER; PVC CONDUIT TO & IN THE AREA OF L.P.#5; 11; 15; 21; 25; [4; 5; 9; 10; 10*; 25;
Misc
Partial Correction
07/22/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #10; 11; 15; 21; [4; 5; 9; 10a; 10b; 25;
Misc
Partial Correction
08/12/2013
RAIN/WET. NO PERSONNEL FOUND ON SITE.
Underground Electrical Inspection - Commercial Partial 8/13/2013 at 12:00 AM 08/13/2013
Misc
Partial Correction
08/12/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER; PVC CONDUIT TO & IN THE AREA OF L.P.#5; 11; 15; 21; 25; [4; 5; 9; 10; 10*; 25;
Misc
Partial Correction
08/12/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: #10; 11; 15; 21; [4; 5; 9; 10a; 10b; 25;
Misc
Resolved
08/13/2013
RAIN/WET. NO PERSONNEL FOUND ON SITE.
Misc
Partial Correction
08/13/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Underground Electrical Inspection - Commercial Partial 8/22/2013 at 12:00 AM 08/22/2013
Misc
Partial Correction
08/13/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
08/13/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL;
Misc
Partial Correction
08/13/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Corrective Action Required
08/22/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL;
Underground Electrical Inspection - Commercial Partial 8/23/2013 at 12:00 AM 08/23/2013
Misc
Partial Correction
08/22/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
08/22/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL;
Misc
Partial Correction
08/22/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
08/23/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9;
Underground Electrical Inspection - Commercial Partial 8/23/2013 at 12:00 AM 08/23/2013
Misc
Partial Correction
08/23/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
08/23/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL;
Misc
Partial Correction
08/23/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
08/23/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4;
Underground Electrical Inspection - Commercial Partial 8/28/2013 at 12:00 AM 08/28/2013
Misc
Partial Correction
08/23/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
08/23/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL;
Misc
Partial Correction
08/23/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
08/23/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4;
Underground Electrical Inspection - Commercial Partial 8/29/2013 8/29/2013 at 12:00 AM 08/29/2013
Misc
Partial Correction
08/28/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
08/28/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12; 13; 14;
Misc
Partial Correction
08/28/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
08/28/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4;
Underground Electrical Inspection - Commercial Partial 8/30/2013 at 12:00 AM 08/30/2013
Misc
Partial Correction
08/29/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
08/29/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12; 13; 14; [1;2;3;6;7;8;9
Misc
Partial Correction
08/29/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
08/29/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4;
Final Inspection - Commercial Partial 9/9/2013 9/9/2013 at 12:00 AM 09/09/2013
Misc
Corrective Action Required
07/29/2013
OBTAIN PLANNING AND DEVELOPMENT APPROVAL: : PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER HECTOR SOTO; PHASE 2 FINAL: P&D DEFFERS INSPECTION TO FINAL PHASE;
Misc
Corrective Action Required
07/29/2013
OBTAIN FIRE DEPARTMENT APPROVAL: PHASE 1 - ONE ISSUE NOTED SEPARATELY; PHASE 2 FINAL 9/9/13 - JD DEFFERS TO FINAL PHASE;
Misc
Corrective Action Required
07/29/2013
RESOLVE ANY PUBLIC WORKS ISSUES: PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER JON HALEY; PHASE 2 FINAL 9/9/13 - NO COMMO FROM PW;
Misc
Corrective Action Required
07/29/2013
RESOLVE ANY WATER DEPT ISSUES: PHASE 1 FINAL 7/29/13: CONTACT BEN HASKAMP FOR DETERMINATION; PHASE 2 FINAL 9/9/13 - NO CONTACT FROM WU;
Misc
Corrective Action Required
07/29/2013
CODES ADMINISTRATION: PHASE 1 FINAL 7/29/13 - NO ISSUES PRESENTLY. OK FOR USE; PHASE 2 FINAL 9/9/13 - NO ISSUES. OK FOR USE
Underground Electrical Inspection - Commercial Partial 9/26/2013 at 12:00 AM 09/26/2013
Misc
Partial Correction
08/30/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
08/30/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 1;2;3;6;7;8;9; 12; 13; 14; [16; 17; 18; 19; 20;
Misc
Partial Correction
08/30/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
08/30/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4;
Underground Electrical Inspection - Commercial Partial 9/27/2013 9/27/2013 at 12:00 AM 09/27/2013
Misc
Partial Correction
09/26/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
09/26/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 1;2;3;6;7;8;9; 12; 13; 14; [16; 17; 18; 19; 20;
Misc
Partial Correction
09/26/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
09/26/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4; FROM (22) ONE 1" + ONE 2" EAST TO FEEDER PANEL NEAR (21); 24 TO 29; 22TO 26 TO 29; IRRIGATION SLEEVE + 1" UNDER DRIVE BETWEEN 27 & 28;
Underground Electrical Inspection - Commercial Partial 9/30/2013 9/30/2013 at 12:00 AM 09/30/2013
Misc
Partial Correction
09/27/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
09/27/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 1;2;3;6;7;8;9; 12; 13; 14; [16; 17; 18; 19; 20;
Misc
Partial Correction
09/27/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
09/27/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4; FROM (22) ONE 1" + ONE 2" EAST TO FEEDER PANEL NEAR (21); 24 TO 29; 22TO 26 TO 29; IRRIGATION SLEEVE + 1" UNDER DRIVE BETWEEN 27 & 28; FROM 29 TO 28 TO CONNECT TO RUN FROM 27; 23 TO 24
Underground Electrical Inspection - Commercial Partial 10/1/2013 10/1/2013 at 12:00 AM 10/01/2013
Misc
Partial Correction
09/30/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
09/30/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 1;2;3;6;7;8;9; 12; 13; 14; [16; 17; 18; 19; 20;
Misc
Partial Correction
09/30/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
09/30/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4; FROM (22) ONE 1" + ONE 2" EAST TO FEEDER PANEL NEAR (21); 24 TO 29; 22TO 26 TO 29; IRRIGATION SLEEVE + 1" UNDER DRIVE BETWEEN 27 & 28; FROM 29 TO 28 TO CONNECT TO RUN FROM 27; 23 TO 24
Misc
Partial Correction
10/01/2013
INSTALLATION OF BURIED CONDUIT TO QUAZITE BOX TO BE INSTALLED 120 SE OF 100 SLB MAIN ENTRANCE.
Underground Electrical Inspection - Commercial Partial 10/2/2013 at 12:00 AM 10/02/2013
Misc
Partial Correction
10/01/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Partial Correction
10/01/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 1;2;3;6;7;8;9; 12; 13; 14; [16; 17; 18; 19; 20;
Misc
Partial Correction
10/01/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Partial Correction
10/01/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4; FROM (22) ONE 1" + ONE 2" EAST TO FEEDER PANEL NEAR (21); 24 TO 29; 22TO 26 TO 29; IRRIGATION SLEEVE + 1" UNDER DRIVE BETWEEN 27 & 28; FROM 29 TO 28 TO CONNECT TO RUN FROM 27; 23 TO 24
Misc
Partial Correction
10/01/2013
BURIED CONDUIT STUBBED UP INTO NEW QUAZITE BOX 120 SE OF BLDG 100 MAIN ENTRANCE.
Underground Electrical Inspection - Commercial Passed 10/8/2013 (8:00 to 5:00) 10/8/2013 at 12:00 AM 10/08/2013
Misc
Resolved
10/08/2013
OK TO COVER WHEN READY ONE 3" PVC UNDERGROUND CONDUIT FROM EAST RETAINING WALL TO NEW LOCATION OF LIGHTING CONTROLLER
Misc
Resolved
10/08/2013
OK TO POUR WHEN READY CONCRETE LIGHT POLE BASE(S) AT FOLLOWING LOCATIONS: L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 1;2;3;6;7;8;9; 12; 13; 14; 16; 17; 18; 19; 20; 17; 18; 19; 20; 23; 24; 22; 26; 27; 28; 29
Misc
Resolved
10/08/2013
OK TO COVER WHEN READY CONDUIT AND ENCLOSURES FOR SEVEN LUMINAIRES AT THE FOOT OF THE WEST FACE OF THE RETAINING WALL.
Misc
Resolved
10/08/2013
OK TO COVER WHEN READY PVC CONDUIT TO & IN THE AREAS OF L.P.#4; 5; 10; 11; 15; 21; 25; THREE LPCB's ALONG EAST SIDE OF RETAINING WALL; 12-TO-13-TO-14; 6-TO-8-TO-9; 7-TO-9; 1-TO-2-TO-3-TO-4; FROM (22) ONE 1" + ONE 2" EAST TO FEEDER PANEL NEAR (21); 24 TO 29; 22TO 26 TO 29; IRRIGATION SLEEVE + 1" UNDER DRIVE BETWEEN 27 & 28; FROM 29 TO 28 TO CONNECT TO RUN FROM 27; 23 TO 24;
Misc
Resolved
10/08/2013
BURIED CONDUIT STUBBED UP INTO NEW QUAZITE BOX 120 SE OF BLDG 100 MAIN ENTRANCE.
Underground Electrical Inspection - Commercial Passed 10/8/2013 at 12:00 AM 10/08/2013
Final Inspection - Commercial Partial 10/21/2013 10/21/2013 at 12:00 AM 10/21/2013
Misc
Partial Correction
10/21/2013
OBTAIN PLANNING AND DEVELOPMENT APPROVAL: : PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER HECTOR SOTO; PHASE 2 FINAL: P&D DEFERED INSPECTION TO FINAL PHASE; 10/21/13 THIRD (FINAL) PHASE FINAL - NO COMMO FROM P&D
Misc
Partial Correction
10/21/2013
OBTAIN FIRE DEPARTMENT APPROVAL: PHASE 1 - ONE ISSUE NOTED SEPARATELY; PHASE 2 FINAL 9/9/13 - JD DEFFERS TO FINAL PHASE; 10/21 TWO REMAINING ISSUES, BUT OK FOR TEMPORARY USE
Misc
Partial Correction
10/21/2013
RESOLVE ANY PUBLIC WORKS ISSUES: PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER JON HALEY; PHASE 2 FINAL 9/9/13 - NO COMMO FROM PW; 10/21/13 3RD PHASE FINAL - NO COMMO FROM PW
Misc
Partial Correction
10/21/2013
RESOLVE ANY WATER DEPT ISSUES: PHASE 1 FINAL 7/29/13: CONTACT BEN HASKAMP FOR DETERMINATION; PHASE 2 FINAL 9/9/13 - NO CONTACT FROM WU; PHASE 3 FINAL 10/21/13 - NO CONTACT FROM WU
Misc
Partial Correction
10/21/2013
CODES ADMINISTRATION: PHASE 1 FINAL 7/29/13 - NO ISSUES PRESENTLY. OK FOR USE; PHASE 2 FINAL 9/9/13 - NO ISSUES. OK FOR USE; PHASE 3 FINAL 10/21/13: ELECTRICAL WIRING APPARENTLY INCOMPLETE AT TWO LIGHT POLES ___, ___ PARKING LOT PHASES 1 THRU 3 OK FOR USE THROUGH 10/31/13 PENDING FINAL APPROVAL BY ALL DEPARTMENTS NAMED ABOVE.
Final Inspection - Commercial Partial 10/23/2013 at 12:00 AM 10/23/2013
Misc
Partial Correction
10/21/2013
OBTAIN PLANNING AND DEVELOPMENT APPROVAL: : PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER HECTOR SOTO; PHASE 2 FINAL: P&D DEFERED INSPECTION TO FINAL PHASE; 10/21/13 THIRD (FINAL) PHASE FINAL - NO COMMO FROM P&D; 10/22/13 HECTOR SAYS OK EXCEPT FOR LANDSCAPING.
Misc
Partial Correction
10/21/2013
OBTAIN FIRE DEPARTMENT APPROVAL: PHASE 1 - ONE ISSUE NOTED SEPARATELY; PHASE 2 FINAL 9/9/13 - JD DEFFERS TO FINAL PHASE; 10/21 TWO REMAINING ISSUES, BUT OK FOR TEMPORARY USE
Misc
Partial Correction
10/21/2013
RESOLVE ANY PUBLIC WORKS ISSUES: PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER JON HALEY; PHASE 2 FINAL 9/9/13 - NO COMMO FROM PW; 10/21/13 3RD PHASE FINAL - NO COMMO FROM PW; 10/23/13 BOB BURNS DECLARES "SUBSTANTIAL COMPLETION".
Misc
Resolved
10/23/2013
RESOLVE ANY WATER DEPT ISSUES: PHASE 1 FINAL 7/29/13: CONTACT BEN HASKAMP FOR DETERMINATION; PHASE 2 FINAL 9/9/13 - NO CONTACT FROM WU; PHASE 3 FINAL 10/21/13 - NO CONTACT FROM WU;
Misc
Partial Correction
10/21/2013
CODES ADMINISTRATION: PARKING LOT PHASES 1 THRU 3 OK FOR USE THROUGH 10/31/13 PENDING FINAL APPROVAL BY DEPARTMENTS SHOWN ABOVE WITH OPEN ISSUES.
Final Inspection - Commercial Partial 11/1/2013 at 12:00 AM 11/01/2013
Misc
Partial Correction
10/23/2013
OBTAIN PLANNING AND DEVELOPMENT APPROVAL: : PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER HECTOR SOTO; PHASE 2 FINAL: P&D DEFERED INSPECTION TO FINAL PHASE; 10/21/13 THIRD (FINAL) PHASE FINAL - NO COMMO FROM P&D; 10/22/13 HECTOR SAYS OK EXCEPT FOR LANDSCAPING.
Misc
Partial Correction
10/23/2013
LAST KNOWN STATUS OF FIRE DEPARTMENT INSPECTION: - fire hydrant south of main entrance of 100 bldg needs to be rotated 180 degrees so the 4" discharge is facing the roadway - top portion of all hydrants needs to be painted silver - secure the lid to the backflow pit
Misc
Resolved
11/01/2013
RESOLVE ANY PUBLIC WORKS ISSUES: PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER JON HALEY; PHASE 2 FINAL 9/9/13 - NO COMMO FROM PW; 10/21/13 3RD PHASE FINAL - NO COMMO FROM PW; 10/23/13 BOB BURNS DECLARES "SUBSTANTIAL COMPLETION".
Misc
Resolved
11/01/2013
CODES ADMINISTRATION: PHASE 1 FINAL 7/29/13 - NO ISSUES PRESENTLY. OK FOR USE; PHASE 2 FINAL 9/9/13 - NO ISSUES. OK FOR USE; PHASE 3 FINAL 10/21/13: ELECTRICAL WIRING APPARENTLY INCOMPLETE AT TWO LIGHT POLES 22, 29 PARKING LOT PHASES 1 THRU 3 OK FOR USE THROUGH 10/31/13 PENDING FINAL APPROVAL BY ALL DEPARTMENTS NAMED ABOVE.
Misc
Partial Correction
11/01/2013
PARKING LOT OK FOR USE THROUGH 5/15/2014 PENDING FINAL COMPLETION AND APPROVAL BY LS FIRE DEPT AND PLANNING AND DEVELOPMENT DEPT. PLEASE REQUEST THESE DEPARTMENTS TO NOTIFY CODES DEPT UPON APPROVAL SO PERMIT MAY BE CLOSED.
Final Inspection - Commercial Partial 11/8/2013 at 12:00 AM 11/08/2013
Misc
Resolved
11/08/2013
OBTAIN PLANNING AND DEVELOPMENT APPROVAL: : PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER HECTOR SOTO; PHASE 2 FINAL: P&D DEFERED INSPECTION TO FINAL PHASE; 10/21/13 THIRD (FINAL) PHASE FINAL - NO COMMO FROM P&D; 10/22/13 HECTOR SAYS OK EXCEPT FOR LANDSCAPING.
Misc
Resolved
11/08/2013
OBTAIN FIRE DEPARTMENT APPROVAL: PHASE 1 - ONE ISSUE NOTED SEPARATELY; PHASE 2 FINAL 9/9/13 - JD DEFFERS TO FINAL PHASE; 10/21 TWO REMAINING ISSUES, BUT OK FOR TEMPORARY USE
Misc
Resolved
11/08/2013
RESOLVE ANY PUBLIC WORKS ISSUES: PHASE 1 FINAL 7/29/13: NO ISSUES PRESENTLY PER JON HALEY; PHASE 2 FINAL 9/9/13 - NO COMMO FROM PW; 10/21/13 3RD PHASE FINAL - NO COMMO FROM PW; 10/23/13 BOB BURNS DECLARES "SUBSTANTIAL COMPLETION".
Misc
Partial Correction
11/08/2013
PARKING LOT PHASES 1 THRU 3 OK FOR USE THROUGH 5/15/14 PENDING FINAL APPROVAL BY LS PLANNING & DEVELOPMENT DEPARTMENT.
Occupancy Inspection - Fire Passed 11/8/2013 at 12:00 AM 11/08/2013
Misc
Corrective Action Required
07/29/2013
-fire hydrant south of main entrance of 100 bldg needs to be rotated 180 degrees so the 4" discharge is facing the roadway -top portion of all hydrants needs to be painted silver -secure the lid to the backflow pit
Final Inspection - Commercial Passed 5/14/2014 at 12:00 AM 05/14/2014
Misc
Resolved
05/14/2014
PARKING LOT PHASES 1 THRU 3 OK FOR USE THROUGH 5/15/14 PENDING FINAL APPROVAL BY LS PLANNING & DEVELOPMENT DEPARTMENT.
Documents & Images
Date Uploaded File Type Document Name
05/06/2013 Letter Plan Review Conditions
05/08/2013 Letter SPECIAL INSPECTIONS
05/20/2013 Letter Building Permit
06/14/2013 Letter Inspection Summary
06/19/2013 Letter Inspection Summary
06/26/2013 Letter Inspection Summary
06/27/2013 Letter Fire Building Plan Review
06/27/2013 Letter Fire Building Plan Review
07/01/2013 Letter Inspection Summary
07/03/2013 Letter Inspection Summary
07/12/2013 Letter Inspection Summary
07/18/2013 Letter Inspection Summary
07/29/2013 Letter Inspection Summary
08/13/2013 Letter Inspection Summary
08/23/2013 Letter Inspection Summary
08/23/2013 Letter Inspection Summary
08/29/2013 Letter Inspection Summary
08/30/2013 Letter Inspection Summary
09/09/2013 Letter Inspection Summary
09/26/2013 Letter Inspection Summary
09/27/2013 Letter Inspection Summary
09/30/2013 Letter Inspection Summary
10/02/2013 Letter Inspection Summary
10/08/2013 Letter Inspection Summary
10/08/2013 Letter Inspection Summary
10/21/2013 Letter Inspection Summary
10/23/2013 Letter Inspection Summary
11/01/2013 Letter Inspection Summary
05/14/2014 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home