Permit Application Status

PRCOM20130740


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20130740
Building Permit - Commercial
Final Completion
MIDWEST DIVISION LSH LLC
ALTERATION COMMERCIAL
PHASED REMODEL
04/25/2013
05/14/2013
10/15/2014
10/01/2015
Locations
Contacts
LYTLE CONSTRUCTION INC, Address:18505 E 163RD ST, Phone:(816) 524-7275  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
BROADWAY ELECTRICAL CONSTRUCTION CO, Address:510 MIAMI AVENUE, Phone:(913) 621-3553  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
MIDWEST DIVISION LSH LLC, Address:PO BOX 1504  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 08/23/2013
Brian Austerman
Installation acceptance testing
Corrective Action Required
08/23/2013

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule alarm testing
Sprinkler Plan Review Released for Construction 05/29/2013
Brian Austerman
Misc
Corrective Action Required
05/29/2013

Released for construction 5/29/13
Building Plan Review Approved 05/10/2013 05/07/2013
Mike Weisenborn
NEC - Receptacles - Grounding
Resolved
05/07/2013

2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B). Action required - The only note on grounding that I can find refers to NEC 250. Make needed corrections.
Accessibility - Maneuvering Clearance at Doors.
Resolved
05/07/2013

ICC/ANSI A117.1 2003 404.2.3 - Maneuvering Clearance at Doors. Minimum maneuvering clearances at doors shall comply with Section 404.2.3 and shall include the full clear opening width of the doorway. Action required - The required clear space from the pull side of door 200A and 202 is not provided. Make needed corrections.
Licensed Contractors Approved 10/29/2013 05/07/2013
Mike Weisenborn
License contractors
Resolved
05/07/2013

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Broadway Electrical does not have a current business license with the City of Lee's Summit. A licensed electrical contractor is required for permit approval.
Fire Plan Review Approved with Conditions 05/10/2013 05/06/2013
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
05/06/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
05/06/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Misc
Corrective Action Required
05/06/2013

Exit egress doors shall swing in the direction of travel: The door from the vitals area (224) to the hall (223) shall swing in the direction of travel. Action required: reverse the swing on the door
Building Plan Review Rejected 05/07/2013 05/02/2013
Mike Weisenborn
NEC - Receptacles - Grounding
Corrective Action Required
05/02/2013

2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B). Action required - The only note on grounding that I can find refers to NEC 250. Make needed corrections.
Accessibility - Maneuvering Clearance at Doors.
Corrective Action Required
05/02/2013

ICC/ANSI A117.1 2003 404.2.3 - Maneuvering Clearance at Doors. Minimum maneuvering clearances at doors shall comply with Section 404.2.3 and shall include the full clear opening width of the doorway. Action required - The required clear space from the pull side of door 200A and 202 is not provided. Make needed corrections.
Fire Plan Review Approved 05/07/2013 04/26/2013
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
04/26/2013

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Submit sprinkler plans for approval
Construction documents for fire alarm systems
Corrective Action Required
04/26/2013

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Submit alarm plans for approval
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $527.84 $527.84 Paid 05/14/2013
$527.84
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 5/29/2013 5/29/2013 at 12:00 AM 05/29/2013
Misc
Partial Correction
05/29/2013
PLUMBING FOR BREAK ROOM RELOCATION APPROVED
In-wall Inspection Passed 6/6/2013 6/6/2013 at 12:00 AM 06/06/2013
Misc
Resolved
06/06/2013
PLUMBING FOR BREAK ROOM RELOCATION APPROVED
Above Ceiling Inspection Passed 6/26/2013 6/26/2013 at 12:00 AM 06/26/2013
Occupancy Inspection - Codes Commercial Partial 7/8/2013 7/8/2013 at 12:00 AM 07/08/2013
Misc
Partial Correction
07/08/2013
-THE FOLLOWING ROOMS APPPROVED FOR USE: NEW RECEPTION AREA AND WAITING AREA. NEW BREAK AREA, ROOM 109A.
In-wall Inspection Partial 7/24/2013 7/24/2013 at 12:00 AM 07/24/2013
Above Ceiling Inspection Partial 8/15/2013 8/15/2013 at 12:00 AM 08/15/2013
Occupancy Inspection - Codes Commercial Partial 8/23/2013 8/23/2013 at 12:00 AM 08/23/2013
Misc
Partial Correction
07/08/2013
-THE FOLLOWING ROOMS APPPROVED FOR USE: NEW RECEPTION AREA AND WAITING AREA. NEW BREAK AREA, ROOM 109A; PHASE 2 MODIFIED SPACES 222-227;
Alarm Test Passed 8/23/2013 at 12:00 AM 08/23/2013
Occupancy Inspection - Fire Passed 8/23/2013 at 12:00 AM 08/23/2013
Investigation Inspection Complete 11/4/2014 at 12:00 AM 08/17/2016
Underground Plumbing Inspection - Commercial Not Complete 01/09/2018
In-wall Inspection Not Complete 01/09/2018
Underslab Electrical Inspection - Commercial Not Complete 01/09/2018
Rough Electrical Inspection - Commercial Not Complete 01/09/2018
Underground Electrical Inspection - Commercial Not Complete 01/09/2018
Rough Plumbing Inspection - Commercial Not Complete 01/09/2018
In-wall Inspection Not Complete 01/09/2018
Rough Mechanical Inspection - Commercial Not Complete 01/09/2018
Final Electrical Inspection - Commercial Not Complete 01/09/2018
Underslab Plumbing Inspection - Commercial Not Complete 01/09/2018
Underslab Electrical Inspection - Commercial Not Complete 01/09/2018
Rough Electrical Inspection - Commercial Not Complete 01/09/2018
Underground Electrical Inspection - Commercial Not Complete 01/09/2018
Underground Plumbing Inspection - Commercial Not Complete 01/09/2018
Underslab Plumbing Inspection - Commercial Not Complete 01/09/2018
Rough Plumbing Inspection - Commercial Not Complete 01/09/2018
Above Ceiling Inspection Not Complete 01/09/2018
All Rough Inspection - Commercial Not Complete 01/09/2018
Rough Mechanical Inspection - Commercial Not Complete 01/09/2018
Final Plumbing Inspection - Commercial Not Complete 01/09/2018
Occupancy Inspection - Codes Commercial Not Complete 01/09/2018
Misc
Partial Correction
08/23/2013
-THE FOLLOWING ROOMS APPPROVED FOR USE: NEW RECEPTION AREA AND WAITING AREA. NEW BREAK AREA, ROOM 109A; PHASE 2 MODIFIED SPACES 222-227;
Investigation Inspection Not Complete 01/09/2018
Documents & Images
Date Uploaded File Type Document Name
05/02/2013 Letter Plan Review Conditions
05/13/2013 Letter Plan Review Conditions
05/14/2013 Letter Building Permit
05/29/2013 Letter Inspection Summary
06/06/2013 Letter Inspection Summary
06/26/2013 Letter Inspection Summary
06/27/2013 Letter Fire (Sprinkler) Plan Review
06/27/2013 Letter Fire Building Plan Review
06/27/2013 Letter Fire Building Plan Review
07/08/2013 Letter Inspection Summary
07/24/2013 Letter Inspection Summary
08/15/2013 Letter Inspection Summary
08/23/2013 Letter Inspection Summary
08/27/2013 Letter Fire (Alarm) Plan Review Notice
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home