Summary
PRCOM20130400
Building Permit - Commercial
Final Completion
ARVEST BANK
REPAIR REPLACE UPGRADE
INSTALL CIRCUITS AND RECEPTACLES FOR COMPUTER WORKSTATIONS - ALSO SOME CAN LIGHTS IN CONFERENCE ROOM
03/15/2013
03/15/2013
04/22/2014
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
ALLIED ELECTRICAL CONSTRUCTION INC, Address:13416 HORSESHOE DR W, Phone:(816) 532-4446  
ARVEST BANK, Address:913 W MONROE PO BOX 749  
ARVEST BANK, Address:PO BOX 799  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/15/2013 03/15/2013
Codes Admin
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Repair/Replace/Upgrade $34.21 $34.21 Paid 03/15/2013
$34.21
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 5/10/2013 5/10/2013 at 12:00 AM 05/10/2013
Misc
Corrective Action Required
05/10/2013
CHANGING DOOR OPENINGS- PARTIAL APPROVAL ON SOME OF THE DOOR OPENINGS. OK TO COVER WILL RECALL WHEN OTHERS ARE READY FOR INSPECTION. EXISTING WALLS ONLY
In-wall Inspection Passed 5/21/2013 5/21/2013 at 12:00 AM 05/21/2013
Misc
Resolved
05/21/2013
CHANGING DOOR OPENINGS- PARTIAL APPROVAL ON SOME OF THE DOOR OPENINGS. OK TO COVER WILL RECALL WHEN OTHERS ARE READY FOR INSPECTION. EXISTING WALLS ONLY
In-wall Inspection Passed 5/29/2013 5/29/2013 at 12:00 AM 05/29/2013
Investigation Inspection Complete 11/26/2013 at 12:00 AM 04/22/2014
Final Electrical Inspection - Commercial Passed 04/22/2014
Documents & Images
Date Uploaded File Type Document Name
03/15/2013 Letter Building Permit
05/10/2013 Letter Inspection Summary
05/21/2013 Letter Inspection Summary
05/29/2013 Letter Inspection Summary
04/22/2014 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: