Permit Application Status

PRCOM20122128


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20122128
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
ALTERATIONS TO EXISTING FIRE SPRINKLER SYSTEM
09/24/2012
01/13/2015
Locations
Contacts
CITY OF LEES SUMMIT, Address:PO BOX 1600  
3RD STREET RESTAURANT ASSOCIATES LLC, Address:337 SE CHELSEA LN  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 10/05/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
10/05/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. As built plans received Sept 17, 2012. Provide a NICET or PE stamp on the plans.
Installation acceptance testing
Corrective Action Required
10/05/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call to schedule a hydrostatic and flow test.
Misc
Corrective Action Required
10/05/2012

907.4.4 Signs. Where fire alarm systems are not monitored by a supervising station, an approved permanent sign shall be installed adjacent to each manual fire alarm box that reads: WHEN ALARM SOUNDS—CALL FIRE DEPARTMENT. Verified at inspection.
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sprinkler - Flow Test Passed 01/07/2013
Sprinkler - Hydrostatic Test Passed 1/7/2013 at 11:00 AM 01/07/2013
Misc
Corrective Action Required
01/07/2013
PRCOM20122128 hydrostatic test: system held test pressure for required test period. testing the flow alarm, it was noticed that the wires for the outside bell had been cut and removed. The outside flow alarm needs to be restored to working order.
Alarm Test Passed 8/8/2013 at 12:00 AM 08/08/2013
Documents & Images
Date Uploaded File Type Document Name
01/07/2013 Letter Fire Loss Reduction Form
06/27/2013 Letter Fire (Sprinkler) Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home