Permit Application Status

PRCOM20121481


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20121481
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW TENANT FINISH
NEW TENANT FINISH FOR MEDICAL OFFICE
06/29/2012
08/17/2012
10/14/2014
05/08/2013
Locations
Contacts
MCCOWN GORDON CONSTRUCTION LLC, Address:850 MAIN ST, Phone:(816) 960-1111  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 09/07/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
09/07/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received Aug. 27, 2012.
Installation acceptance testing
Corrective Action Required
09/07/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Misc
Corrective Action Required
09/07/2012

For information only -Attach the slugs from the snap-o-let installation to the pipe for inspection.
Internal Plan Review (Res) Approved 08/31/2012 08/17/2012
Codes Admin
True
Building Plan Review Approved 07/30/2012 07/30/2012
Mike Weisenborn
License contractors
Corrective Action Required
07/25/2012

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Provide the names for the licensed mechanical, electrical and plumbing sub-contractors.
Accessibility - Refrigerator/Freezer - General requirements
Corrective Action Required
07/25/2012

ICC/ANSI A117.1 2003 804.6.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer compartment shelves, including the bottom of the freezer, 54 inches maximum above the floor when the shelves are installed at the maximum heights possible in the compartment. A clear floor space, positioned for a parallel approach to the space dedicated to a refrigerator/freezer, shall be provided. The centerline of the clear floor space shall be offset 24 inches maximum from the centerline of the dedicated space. Action required - This comment is for information purposes.
NEC - Receptacles - Grounding
Resolved
07/30/2012

2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B). Action required - Provide additional information on the plans.
Business License
Corrective Action Required
07/25/2012

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Provide the name of the licensed general contractor.
Fire Plan Review Approved 07/24/2012 07/24/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
07/24/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Misc
Resolved
07/24/2012

Provide an exit light in corridor 2E200 that directs to either stairwell.
Construction documents for fire alarm systems
Corrective Action Required
07/24/2012

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval. Provide pull stations at the entrances to the interior stairwell.
Portable fire extinguishers - general
Resolved
07/24/2012

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Show locations of additional fire extinguishers. Maintain 75 foot travel distance.
Misc
Resolved
07/24/2012

Provide an exit light over the door to the center stairwell from corridor 2E204.
Address numbers required
Resolved
07/24/2012

2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Provide suite numbers on doors to public corridors.
Installation acceptance testing
Corrective Action Required
07/24/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (8160 969-1300 to schedule testing.
Fire Plan Review Rejected 07/12/2012 07/17/2012
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
07/13/2012

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Misc
Corrective Action Required
07/13/2012

Provide an exit light in corridor 2E200 that directs to either stairwell.
Construction documents for fire alarm systems
Corrective Action Required
07/13/2012

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval. Provide pull stations at the entrances to the interior stairwell.
Portable fire extinguishers - general
Corrective Action Required
07/13/2012

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Show locations of additional fire extinguishers. Maintain 75 foot travel distance.
Misc
Corrective Action Required
07/13/2012

Provide an exit light over the door to the center stairwell from corridor 2E204.
Address numbers required
Corrective Action Required
07/13/2012

2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Provide suite numbers on doors to public corridors.
Installation acceptance testing
Corrective Action Required
07/13/2012

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (8160 969-1300 to schedule testing.
Internal Plan Review (Res) Rejected 07/12/2012 07/16/2012
Mike Weisenborn
License Tax Codes Approved 07/20/2012 07/13/2012
Mike Weisenborn
Building Plan Review Rejected 07/12/2012 07/12/2012
Mike Weisenborn
License contractors
Corrective Action Required
07/12/2012

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required - Provide the names for the licensed mechanical, electrical and plumbing sub-contractors.
Accessibility - Refrigerator/Freezer - General requirements
Corrective Action Required
07/12/2012

ICC/ANSI A117.1 2003 804.6.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer compartment shelves, including the bottom of the freezer, 54 inches maximum above the floor when the shelves are installed at the maximum heights possible in the compartment. A clear floor space, positioned for a parallel approach to the space dedicated to a refrigerator/freezer, shall be provided. The centerline of the clear floor space shall be offset 24 inches maximum from the centerline of the dedicated space. Action required - This comment is for information purposes.
NEC - Receptacles - Grounding
Corrective Action Required
07/12/2012

2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B). Action required - Provide additional information on the plans.
Business License
Corrective Action Required
07/12/2012

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required - Provide the name of the licensed general contractor.
Zoning Review Approved 07/12/2012 07/12/2012
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $1,648.50 $1,648.50 Paid 08/17/2012
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Passed 9/13/2012 at 12:00 AM 09/13/2012
In-wall Inspection Partial 9/20/2012 9/20/2012 at 12:00 AM 09/20/2012
Misc
Partial Correction
09/20/2012
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E212; 215; 213; 218; 219; 220; 221; 222; 223; 224; 225; 227; 228; 229; 231; 232; 233; 235; 236;
In-wall Inspection Partial 9/26/2012 9/26/2012 at 12:00 AM 09/26/2012
Misc
Partial Correction
09/20/2012
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E212; 215; 213; 218; 219; 220; 221; 222; 223; 224; 225; 227; 228; 229; 231; 232; 233; 235; 236; 216; 230; 234;
In-wall Inspection Partial 9/28/2012 at 12:00 AM 09/28/2012
Misc
Partial Correction
09/26/2012
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E212; 215; 213; 218; 219; 220; 221; 222; 223; 224; 225; 227; 228; 229; 231; 232; 233; 235; 236; 216; 230; 234; 207; 210
In-wall Inspection Partial 10/3/2012 10/3/2012 at 12:00 AM 10/03/2012
Misc
Partial Correction
09/28/2012
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E212; 215; 213; 218; 219; 220; 221; 222; 223; 224; 225; 227; 228; 229; 231; 232; 233; 235; 236; 216; 230; 234; 207; 210, EAST SIDE OF CORRIDOR 2E204, JANITOR 2E238, WAITING 2E205, CHECKOUT 2E208, BUSINESS 2E206, CORRIIDOR 2E202, EXAM 214
Above Ceiling Inspection Not Ready 10/25/2012 10/25/2012 at 12:00 AM 10/25/2012
Misc
Partial Correction
10/25/2012
Above Ceiling Inspection Partial 10/30/2012 10/30/2012 at 12:00 AM 10/30/2012
Misc
Partial Correction
10/25/2012
AFTER UNUSED HANGERS ARE REMOVED, ONE INSULATED PIPE RUN SUPPORTED, ALL TEMPORARY ELECTRICAL WIRING IS REMOVED AND ELECT BOXES ARE CLOSED OK TO COVER WHEN READY EXCEPT SPACES 200, 202 AND 204 NOT READY FOR INSPECTION
In-wall Inspection Partial 11/2/2012 at 12:00 AM 11/02/2012
Misc
Partial Correction
10/03/2012
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E212; 215; 213; 218; 219; 220; 221; 222; 223; 224; 225; 227; 228; 229; 231; 232; 233; 235; 236; 216; 230; 234; 207; 210, EAST SIDE OF CORRIDOR 2E204, JANITOR 2E238, WAITING 2E205, CHECKOUT 2E208, BUSINESS 2E206, CORRIIDOR 2E202, EXAM 214; CORR 2E204 W WALL
Above Ceiling Inspection Passed 11/19/2012 11/19/2012 at 12:00 AM 11/19/2012
Misc
Resolved
11/19/2012
OK TO COVER WHEN READY EXCEPT SPACES 200, 202 AND 204 NOT READY FOR INSPECTION
Miscellaneous Inspection Partial 12/6/2012 at 12:00 AM 12/06/2012
Misc
Partial Correction
12/06/2012
PRE-FINAL OBSERVATIONS
Sprinkler - Flow Test Passed 12/10/2012
Sprinkler - Hydrostatic Test Passed 12/10/2012
Alarm Test Passed 12/10/2012
Occupancy Inspection - Fire Passed 12/10/2012 at 12:00 AM 12/10/2012
Occupancy Inspection - Codes Commercial Partial 12/10/2012 12/10/2012 at 12:00 AM 12/10/2012
Misc
Corrective Action Required
12/10/2012
APPROVED ELEVATOR INSPECTION CERTIFICATE REQUIRED BEFORE ADMISSION OF PATIENTS AND PUBLIC
Misc
Corrective Action Required
12/10/2012
PROVIDE MANUFACTURER DOCUMENTATION THAT AQUAPURE UNIT HAS BACKFLOW PREVENTION BUILT IN -- OR INSTALL DEVICE IN POTABLE WATER FEED LINE.
Misc
Partial Correction
12/10/2012
OCCUPANCY STATUS: OK TO SET UP FOR OPERATION. NO PUBLIC NOR PATIENTS PRIOR TO APPROVAL.
In-wall Inspection Passed 12/10/2012 at 12:00 AM 12/10/2012
Misc
Resolved
12/10/2012
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2E212; 215; 213; 218; 219; 220; 221; 222; 223; 224; 225; 227; 228; 229; 231; 232; 233; 235; 236; 216; 230; 234; 207; 210, EAST SIDE OF CORRIDOR 2E204, JANITOR 2E238, WAITING 2E205, CHECKOUT 2E208, BUSINESS 2E206, CORRIIDOR 2E202, EXAM 214; CORR 2E204 W WALL
Miscellaneous Inspection Passed 12/10/2012 at 12:00 AM 12/10/2012
Misc
Resolved
12/10/2012
PRE-FINAL OBSERVATIONS
Occupancy Inspection - Codes Commercial Partial 12/13/2012 at 12:00 AM 12/18/2012
Misc
Partial Correction
12/18/2012
APPROVED ELEVATOR INSPECTION CERTIFICATE RECEIVED DATED 12/13/12 -- INSTALLATION PERFORMED UNDER PERMIT PRCOM20121257
Misc
Corrective Action Required
12/10/2012
PROVIDE MANUFACTURER DOCUMENTATION THAT AQUAPURE UNIT HAS BACKFLOW PREVENTION BUILT IN -- OR INSTALL DEVICE IN POTABLE WATER FEED LINE.
Misc
Partial Correction
12/10/2012
OCCUPANCY STATUS: OK TO SET UP FOR OPERATION. NO PUBLIC NOR PATIENTS PRIOR TO APPROVAL.
Occupancy Inspection - Codes Commercial Full C of O 5/8/2013 at 12:00 AM 05/08/2013
Misc
Resolved
05/08/2013
APPROVED ELEVATOR INSPECTION CERTIFICATE RECEIVED DATED 12/13/12 -- INSTALLATION PERFORMED UNDER PERMIT PRCOM20121257
Misc
Resolved
05/08/2013
PROVIDE MANUFACTURER DOCUMENTATION THAT AQUAPURE UNIT HAS BACKFLOW PREVENTION BUILT IN -- OR INSTALL DEVICE IN POTABLE WATER FEED LINE.
Misc
Resolved
05/08/2013
OCCUPANCY STATUS: OK TO SET UP FOR OPERATION. NO PUBLIC NOR PATIENTS PRIOR TO APPROVAL.
Documents & Images
Date Uploaded File Type Document Name
07/16/2012 Letter Plan Review Conditions
08/17/2012 Letter Building Permit
08/17/2012 Letter Plan Review Conditions
09/13/2012 Letter Inspection Summary
09/20/2012 Letter Inspection Summary
09/26/2012 Letter Inspection Summary
09/28/2012 Letter Inspection Summary
10/03/2012 Letter Inspection Summary
10/30/2012 Letter Inspection Summary
11/02/2012 Letter Inspection Summary
11/19/2012 Letter Inspection Summary
12/10/2012 Letter Inspection Summary
12/17/2012 Activity Document DOC121712-001.pdf
05/08/2013 Letter Field Certificate of Occupancy
05/09/2013 Letter Final Certificate of Occupancy
06/25/2013 Letter Fire Building Plan Review
06/25/2013 Letter Fire Building Plan Review
06/27/2013 Letter Fire (Sprinkler) Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home