Review Type |
Outcome |
Est. Completion Date |
Completed |
Alarm Plan Review
|
Released for Construction
|
|
09/10/2012
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
Corrective Action Required
2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Plans received September 6, 2012.
|
|
Installation acceptance testing
Corrective Action Required
2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Call (816) 969-1300 to schedule a test.
|
|
Misc
Corrective Action Required
Duct detectors shall be supervisory alarms only. Verified at inspection.
|
|
|
Internal Plan Review (Res)
|
Approved
|
08/31/2012
|
08/17/2012
|
|
Codes Admin
|
|
True
|
Building Plan Review
|
Approved
|
07/31/2012
|
07/30/2012
|
|
Mike Weisenborn
|
|
Business License
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required - Provide the name of the general contractor prior to permit approval. A minimum a Lee's Summit General Contractor Class "B" license is required.
|
|
License contractors
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances.
Action required - Provide the names of the mechanical, electrical and plumbing subcontractors prior to permit approval.
|
|
Plumb - Separate facilities
2006 IPC 403.2 - Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (See code for possible exceptions.)
Action required - Please designate the restrooms as men's and women's on the plans.
Mike Weisenborn 07/30/2012 4:41 PM -- Information added.
|
|
Accessibility - Water closet - Grab bars
ICC/ANSI A117.1 2003 604.5.1 - Fixed sidewall grab bars. Fixed sidewall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located between 39 inches and 41 inches above the floor, and with the center line of the bar located between 39 inches and 41 inches from the rear wall.
Action required - The required vertical grab bar is not indicated on the plans. Please make needed corrections.
Mike Weisenborn 07/30/2012 4:40 PM -- Information added.
|
|
Bldg - Means of egress illumination - Emergency power
Corrective Action Required
2006 IBC 1006.3 - Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premises electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate the following areas.
1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress.
2. Corridors, exit enclosures and exit passageways in building required to have two or more exits.
3. Exterior egress components at other than the level of exit discharge until exit discharge is accomplished for buildings required to have two or more exits.
4. Interior exit discharge elements, as permitted in Section 1024.1, in buildings required to have two or more exits.
5. Exterior landings, as required by Section 1008.1.5, for exit discharge doorways in building required to have two or more exits.
The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702.
Action required - Show how emergency lighting on the exerior of the building at the egress doors will be met.
Mike Weisenborn 07/30/2012 4:39 PM -- To be verified at inspection.
|
|
Misc
Corrective Action Required
The bottom chord braces at the rtu(s) shall be welded once the units have been installed. This will need to be verified by the city inspection staff.
Action required - This comment is for information purposes.
|
|
|
Zoning Review
|
Approved
|
07/31/2012
|
07/30/2012
|
|
Mike Weisenborn
|
|
|
Fire Plan Review
|
Approved
|
07/31/2012
|
07/26/2012
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for review and approval.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide shop drawings for review and approval.
|
|
Installation acceptance testing
Corrective Action Required
2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Call (816) 969-1300 to schedule alarm tests.
|
|
Address numbers required
Corrective Action Required
2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
The address shall be placed on/over the front and rear doors unless already provided. Verified inspection.
|
|
Misc
Corrective Action Required
All egress doors shall be equiped with thumb latches or panic hardware. Verified at inspection.
|
|
Misc
1006.3 Illumination emergency power.
The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply.
In the event of power supply failure, an emergency electrical system shall automatically illuminate the following areas:
1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress.
2. Corridors, exit enclosures and exit passageways in buildings required to have two or more exits.
3. Exterior egress components at other than the level of exit discharge until exit discharge is accomplished for buildings required to have two or more exits.
4. Interior exit discharge elements, as permitted in Section 1024.1, in buildings required to have two or more exits.
5. Exterior landings, as required by Section 1008.1.5, for exit discharge doorways in buildings required to have two or more exits.
The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702 of the International Building Code.
Action required: Provide exterior emergency lighting.
|
|
|
Internal Plan Review (Res)
|
Rejected
|
07/09/2012
|
07/10/2012
|
|
Mike Weisenborn
|
|
|
Fire Plan Review
|
Rejected
|
07/09/2012
|
07/09/2012
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for review and approval.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide shop drawings for review and approval.
|
|
Installation acceptance testing
Corrective Action Required
2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Call (816) 969-1300 to schedule alarm tests.
|
|
Address numbers required
Corrective Action Required
2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
The address shall be placed on/over the front and rear doors unless already provided. Verified inspection.
|
|
Misc
Corrective Action Required
All egress doors shall be equiped with thumb latches or panic hardware. Verified at inspection.
|
|
Misc
Corrective Action Required
1006.3 Illumination emergency power.
The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply.
In the event of power supply failure, an emergency electrical system shall automatically illuminate the following areas:
1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress.
2. Corridors, exit enclosures and exit passageways in buildings required to have two or more exits.
3. Exterior egress components at other than the level of exit discharge until exit discharge is accomplished for buildings required to have two or more exits.
4. Interior exit discharge elements, as permitted in Section 1024.1, in buildings required to have two or more exits.
5. Exterior landings, as required by Section 1008.1.5, for exit discharge doorways in buildings required to have two or more exits.
The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702 of the International Building Code.
Action required: Provide exterior emergency lighting.
|
|
|
Building Plan Review
|
Rejected
|
07/09/2012
|
07/05/2012
|
|
Mike Weisenborn
|
|
Business License
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required - Provide the name of the general contractor prior to permit approval. A minimum a Lee's Summit General Contractor Class "B" license is required.
|
|
License contractors
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances.
Action required - Provide the names of the mechanical, electrical and plumbing subcontractors prior to permit approval.
|
|
Plumb - Separate facilities
Corrective Action Required
2006 IPC 403.2 - Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (See code for possible exceptions.)
Action required - Plese designate the restrooms as men's and women's on the plans.
|
|
Accessibility - Water closet - Grab bars
Corrective Action Required
ICC/ANSI A117.1 2003 604.5.1 - Fixed sidewall grab bars. Fixed sidewall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located between 39 inches and 41 inches above the floor, and with the center line of the bar located between 39 inches and 41 inches from the rear wall.
Action required - The required vertical grab bar is not indicated on the plans. Please make needed corrections.
|
|
Bldg - Means of egress illumination - Emergency power
Corrective Action Required
2006 IBC 1006.3 - Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premises electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate the following areas.
1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress.
2. Corridors, exit enclosures and exit passageways in building required to have two or more exits.
3. Exterior egress components at other than the level of exit discharge until exit discharge is accomplished for buildings required to have two or more exits.
4. Interior exit discharge elements, as permitted in Section 1024.1, in buildings required to have two or more exits.
5. Exterior landings, as required by Section 1008.1.5, for exit discharge doorways in building required to have two or more exits.
The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702.
Action required - Show how emergency lighting on the exerior of the building at the egress doors will be met.
|
|
Misc
Corrective Action Required
The bottom chord braces at the rtu(s) shall be welded once the units have been installed. This will need to be verified by the city inspection staff.
Action required - This comment is for information purposes.
|
|
|
License Tax Codes
|
Approved
|
07/09/2012
|
07/05/2012
|
|
Mike Weisenborn
|
|
|
Zoning Review
|
Approved
|
07/09/2012
|
07/05/2012
|
|
Mike Weisenborn
|
|
|