PRCOM20115524


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20115524
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB ONLY
10/06/2011
10/07/2011
05/03/2012
Locations
Contacts
MCCOWN GORDON CONSTRUCTION LLC, Address:850 MAIN ST, Phone:(816) 960-1111  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
STRUCTURAL ENGINEERING ASSOCIATES INC, Address:1000 WALNUT SUITE 1570  
MMC CONTRACTORS NATIONAL INC, Address:13800 WYANDOTTE, Phone:(816) 941-5300  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
MMC CONTRACTORS NATIONAL INC, Address:13800 WYANDOTTE, Phone:(816) 941-5300  
ACI BOLAND - KANSAS CITY, Address:1421 E 104TH STREET  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/06/2011
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $1,326.34 $1,326.34 Paid 10/07/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Partial 11/1/2011 at 12:00 AM 11/01/2011
Misc
Partial Correction
11/01/2011
PERIODIC OBSERVATIONS OF PIER INSTALLATION MONITORED BY S.E.A. AND PSI
Piers/Caissons Inspection - Commercial Partial 11/2/2011 at 12:00 AM 11/02/2011
Piers/Caissons Inspection - Commercial Partial 11/3/2011 at 12:00 AM 11/03/2011
Piers/Caissons Inspection - Commercial Partial 11/4/2011 at 12:00 AM 11/04/2011
Piers/Caissons Inspection - Commercial Partial 11/7/2011 at 12:00 AM 11/07/2011
Misc
Corrective Action Required
11/07/2011
PERIODIC OBSERVATIONS OF PIER INSTALLATION MONITORED BY S.E.A. AND PSI
Piers/Caissons Inspection - Commercial Partial 11/17/2011 at 12:00 AM 11/17/2011
Misc
Partial Correction
11/17/2011
PIER INSTALLATION MONITORED BY S.E.A. AND PSI; PER EARLIER DISCUSSION W/ G.C. CITY INSPECTIONS WAIVED ON PIERS ONLY; LSCA RECEIPT OF PSI INSPECTION REPORT PENDING
Footing Inspection - Commercial Not Ready 11/17/2011 at 12:00 AM 11/17/2011
Misc
Corrective Action Required
11/17/2011
NOTED 11/17/2011 THAT ELEVATOR PIT SLAB WAS POURED WITHOUT CITY INSPECTION.
Misc
Corrective Action Required
11/17/2011
CAUTIONED G.C. 11/17/2011 THAT ALL RE-BAR INCLUDING MATS AND CAGES MUST HAVE FULL 3" CLEARANCE TO BOTTOMS & BANKS PER ACI AND APPROVED PROJECT DRAWINGS.
Footing Inspection - Commercial Partial 11/17/2011 at 12:00 AM 11/17/2011
Misc
Corrective Action Required
11/17/2011
NOTED 11/17/2011 THAT ELEVATOR PIT SLAB WAS POURED WITHOUT CITY INSPECTION.
Misc
Corrective Action Required
11/17/2011
CAUTIONED G.C. 11/17/2011 THAT ALL RE-BAR INCLUDING MATS AND CAGES MUST HAVE FULL 3" CLEARANCE TO BOTTOMS & BANKS PER ACI AND APPROVED PROJECT DRAWINGS.
Footing Inspection - Commercial Partial 11/18/2011 at 12:00 AM 11/18/2011
Misc
Corrective Action Required
11/17/2011
NOTED 11/17/2011 THAT ELEVATOR PIT SLAB WAS POURED WITHOUT CITY INSPECTION.
Misc
Partial Correction
11/18/2011
CAUTIONED G.C. 11/17/2011 THAT ALL RE-BAR INCLUDING MATS AND CAGES MUST HAVE FULL 3" CLEARANCE TO BOTTOMS & BANKS PER ACI AND APPROVED PROJECT DRAWINGS.
Misc
Partial Correction
11/18/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; TUNNEL BEAM T1;
Foundation Inspection - Commercial Partial 11/18/2011 at 12:00 AM 11/18/2011
Misc
Partial Correction
11/18/2011
ELEVATOR PIT WALLS :T.1 TO CC LINE #7
Footing Inspection - Commercial Not Ready 11/21/2011 11/21/2011 at 12:00 AM 11/21/2011
Misc
Corrective Action Required
11/18/2011
NOTED 11/17/2011 THAT ELEVATOR PIT SLAB WAS POURED WITHOUT CITY INSPECTION.
Misc
Corrective Action Required
11/18/2011
CAUTIONED G.C. 11/17/2011 THAT ALL RE-BAR INCLUDING MATS AND CAGES MUST HAVE FULL 3" CLEARANCE TO BOTTOMS & BANKS PER ACI AND APPROVED PROJECT DRAWINGS.
Misc
Corrective Action Required
11/18/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; TUNNEL BEAM T1;
Footing Inspection - Commercial Partial 11/21/2011 (3:00) 11/21/2011 at 12:00 AM 11/21/2011
Misc
Corrective Action Required
11/21/2011
NOTED 11/17/2011 THAT ELEVATOR PIT SLAB WAS POURED WITHOUT CITY INSPECTION.
Misc
Resolved
11/21/2011
CAUTIONED G.C. 11/17/2011 THAT ALL RE-BAR INCLUDING MATS AND CAGES MUST HAVE FULL 3" CLEARANCE TO BOTTOMS & BANKS PER ACI AND APPROVED PROJECT DRAWINGS.
Misc
Corrective Action Required
11/21/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; TUNNEL BEAM T1; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT
Foundation Inspection - Commercial Partial 11/23/2011 at 12:00 AM 11/23/2011
Misc
Corrective Action Required
11/18/2011
ELEVATOR PIT WALLS :T.1 TO CC LINE #7
Misc
Corrective Action Required
11/23/2011
HOOK DOWELS AND COLUMN DOWELS PLACED FOR POUR OF BEAMS OVER TOP OF EXISTING TUNNEL AT T4, T5, AND T6
Footing Inspection - Commercial Partial 11/23/2011 (1:00) 11/25/2011 at 12:00 AM 11/25/2011
Misc
Resolved
11/25/2011
NOTED 11/17/2011 THAT ELEVATOR PIT SLAB WAS POURED WITHOUT CITY INSPECTION.
Misc
Corrective Action Required
11/21/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; TUNNEL BEAM T1; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT; DD/5 TO DD/0.6;
Footing Inspection - Commercial Partial 11/30/2011 (1:45) 11/30/2011 at 12:00 AM 11/30/2011
Misc
Corrective Action Required
11/25/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT; DD/5 TO DD/0.6;
Misc
Corrective Action Required
11/30/2011
TUNNEL BEAM T1 OK TO POUR
Misc
Corrective Action Required
11/30/2011
OK TO POUR WHEN READY FOOTING ENLARGEMENT PER DETAIL SECTION 10/S2.2 (SEA TO INSPECT AND WITNESS PLACEMENT OF DOWELS AND MATS);
Footing Inspection - Commercial Not Ready 12/1/2011 (10:30) 12/1/2011 at 12:00 AM 12/01/2011
Misc
Corrective Action Required
11/30/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT; DD/5 TO DD/0.6;
Misc
Corrective Action Required
11/30/2011
TUNNEL BEAM T1 OK TO POUR
Misc
Corrective Action Required
11/30/2011
OK TO POUR WHEN READY FOOTING ENLARGEMENT PER DETAIL SECTION 10/S2.2 (SEA TO INSPECT AND WITNESS PLACEMENT OF DOWELS AND MATS);
Footing Inspection - Commercial Partial 12/1/2011 12/1/2011 at 12:00 AM 12/01/2011
Misc
Corrective Action Required
12/01/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT; DD/5 TO DD/0.6; 0.2/B TO 0.2/DD (EXCLUDING RECTANGULAR CONFIGURATION AT CC/0.2 NOT SHOWN ON APPROVED DRAWINGS); 1/A.5 TO 1/DD; CC/0.2 TO CC/1.3; BB/0.2 TO BB/1.3; BB/0.2 TO BB/1.3; A.5/0.2 TO A.5/1.3;
Misc
Corrective Action Required
12/01/2011
TUNNEL BEAM T1 OK TO POUR
Misc
Corrective Action Required
12/01/2011
OK TO POUR WHEN READY FOOTING ENLARGEMENT PER DETAIL SECTION 10/S2.2 (SEA TO INSPECT AND WITNESS PLACEMENT OF DOWELS AND MATS);
Footing Inspection - Commercial Partial 12/2/2011 (2:00) 12/2/2011 at 12:00 AM 12/02/2011
Misc
Corrective Action Required
12/01/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT; DD/5 TO DD/0.6; 0.2/B TO 0.2/DD (EXCLUDING RECTANGULAR CONFIGURATION AT CC/0.2 NOT SHOWN ON APPROVED DRAWINGS); 1/A.5 TO 1/DD; CC/0.2 TO CC/1.3; BB/0.2 TO BB/1.3; BB/0.2 TO BB/1.3; A.5/0.2 TO A.5/1.3; 1/F TO 11/F TO 11/B TO A.9/0.2
Misc
Corrective Action Required
12/01/2011
TUNNEL BEAM T1 OK TO POUR
Misc
Corrective Action Required
12/01/2011
OK TO POUR WHEN READY FOOTING ENLARGEMENT PER DETAIL SECTION 10/S2.2 (SEA TO INSPECT AND WITNESS PLACEMENT OF DOWELS AND MATS);
Footing Inspection - Commercial Partial 1/24/2012 at 12:00 AM 01/24/2012
Misc
Corrective Action Required
12/02/2011
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT; DD/5 TO DD/0.6; 0.2/B TO 0.2/DD (EXCLUDING RECTANGULAR CONFIGURATION AT CC/0.2 NOT SHOWN ON APPROVED DRAWINGS); 1/A.5 TO 1/DD; CC/0.2 TO CC/1.3; BB/0.2 TO BB/1.3; BB/0.2 TO BB/1.3; A.5/0.2 TO A.5/1.3; 1/F TO 11/F TO 11/B TO A.9/0.2; AT AND BETWEEN 7.4/76, 7.4/CC3, 7.4/B, 7.4/CC1; ISOLATED FOOTINGS 7.8/T5 & 7.8/CC2
Misc
Resolved
01/24/2012
TUNNEL BEAM T1 OK TO POUR
Misc
Resolved
01/24/2012
OK TO POUR WHEN READY FOOTING ENLARGEMENT PER DETAIL SECTION 10/S2.2 (SEA TO INSPECT AND WITNESS PLACEMENT OF DOWELS AND MATS);
Footing Inspection - Commercial Partial 1/24/2012 at 12:00 AM 01/24/2012
Misc
Partial Correction
01/24/2012
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT; DD/5 TO DD/0.6; 0.2/B TO 0.2/DD (EXCLUDING RECTANGULAR CONFIGURATION AT CC/0.2 NOT SHOWN ON APPROVED DRAWINGS); 1/A.5 TO 1/DD; CC/0.2 TO CC/1.3; BB/0.2 TO BB/1.3; BB/0.2 TO BB/1.3; A.5/0.2 TO A.5/1.3; 1/F TO 11/F TO 11/B TO A.9/0.2; AT AND BETWEEN 7.4/T6, 7.4/CC3, 7.4/B, 7.4/CC1; ISOLATED FOOTINGS 7.8/T5 & 7.8/CC2
Footing Inspection - Commercial Passed 5/3/2012 at 12:00 AM 05/03/2012
Misc
Resolved
05/03/2012
OK TO POUR WHEN READY SECTIONS OF GRADE BEAM, INTEGRAL COLUMN FOOTINGS AND TIE BEAMS AT FOLLOWING LOCATIONS: A.5-1 TO 3.7; BB.5 -1-3.7;3.7 TO 5.9;CC-2.1-3.7; DD 3.7 TO 5.9; G.B. FROM (CC) EAST AT STAIR/ELEVATOR SHAFT; DD/5 TO DD/0.6; 0.2/B TO 0.2/DD (EXCLUDING RECTANGULAR CONFIGURATION AT CC/0.2 NOT SHOWN ON APPROVED DRAWINGS); 1/A.5 TO 1/DD; CC/0.2 TO CC/1.3; BB/0.2 TO BB/1.3; BB/0.2 TO BB/1.3; A.5/0.2 TO A.5/1.3; 1/F TO 11/F TO 11/B TO A.9/0.2; AT AND BETWEEN 7.4/T6, 7.4/CC3, 7.4/B, 7.4/CC1; ISOLATED FOOTINGS 7.8/T5 & 7.8/CC2
Foundation Inspection - Commercial Passed 5/3/2012 at 12:00 AM 05/03/2012
Misc
Resolved
05/03/2012
ELEVATOR PIT WALLS :T.1 TO CC LINE #7
Misc
Resolved
05/03/2012
HOOK DOWELS AND COLUMN DOWELS PLACED FOR POUR OF BEAMS OVER TOP OF EXISTING TUNNEL AT T4, T5, AND T6
Piers/Caissons Inspection - Commercial Passed 5/3/2012 at 12:00 AM 05/03/2012
Final Inspection - Commercial Passed 5/4/2012 at 12:00 AM 05/04/2012
Documents & Images
Date Uploaded File Type Document Name
10/07/2011 Letter Building Permit
11/17/2011 Letter Inspection Summary
11/18/2011 Letter Inspection Summary
11/21/2011 Letter Inspection Summary
11/23/2011 Letter Inspection Summary
11/25/2011 Letter Inspection Summary
11/30/2011 Letter Inspection Summary
12/01/2011 Letter Inspection Summary
12/02/2011 Letter Inspection Summary
01/24/2012 Letter Inspection Summary
01/24/2012 Letter Inspection Summary
05/04/2012 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home