Permit Application Status

PRCOM20114355


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20114355
Building Permit - Commercial
Certificate of Occupancy
CP DEER BROOK PLAZA LLC
CHANGE OF TENANT
BEAUTY SUPPLY STORE
08/09/2011
08/09/2011
09/14/2011
Locations
Contacts
TARTER CONSTRUCTION CO INC, Address:5438 RED HAWK LANE, Phone:(317) 459-6234  
CP DEER BROOK PLAZA LLC, Address:3400 COLLEGE BLVD STE 195  
SMART POWER SERVICES, Address:1151 SE CENTURY DR, Phone:(816) 366-0385  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/09/2011
Codes Admin
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $30.00 $30.00 Paid 08/09/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Electrical Inspection - Commercial Passed 8/16/2011 (8:00 to 5:00) 8/16/2011 at 12:00 AM 08/16/2011
Occupancy Inspection - Codes Commercial Full C of O 9/7/2011 9/14/2011 at 12:00 AM 09/14/2011
Occupancy Inspection - Fire Passed 9/14/2011 at 9:00 AM 09/14/2011
Documents & Images
Date Uploaded File Type Document Name
08/09/2011 Letter Building Permit
08/10/2011 Plans 20110810082324574.pdf
08/16/2011 Letter Inspection Summary
09/14/2011 Letter Field Certificate of Occupancy
09/14/2011 Letter Fire Loss Reduction Form
09/15/2011 Letter Final Certificate of Occupancy
09/15/2011 Letter Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home