Permit Application Status

PRCOM20113398


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20113398
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
PARTIAL COMMERCIAL
STRUCTURAL FOR ADDITION OF FLOORS 3, 4 AND 5
06/27/2011
08/08/2011
01/07/2012
07/26/2012
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
ACI BOLAND, Address:11229 NALL SUITE 140  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/04/2011
Mike Weisenborn
Building Plan Review Approved 08/04/2011
Mike Weisenborn
Bldg - Special inspections - Report requirement
Corrective Action Required
08/04/2011

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Bldg - Special inspections - Statement of special inspections
Corrective Action Required
08/04/2011

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Please provide a statement of special inspections.
Project cost
Corrective Action Required
08/04/2011

The project cost, which is used to establish the permit fee, has not been provided. Action required - Please provide the cost of just this portion of the project.
Final Development Plan
Resolved
08/04/2011

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required - This partial permit can not be issued until we have received a release from Planning and Development and the Public Works Department.
Building Plan Review Rejected 07/12/2011 07/11/2011
Mike Weisenborn
Bldg - Special inspections - Report requirement
Corrective Action Required
07/11/2011

2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work. Action required - This comment is for information purposes.
Bldg - Special inspections - Statement of special inspections
Corrective Action Required
07/11/2011

2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Action required - Please provide a statement of special inspections.
Project cost
Corrective Action Required
07/11/2011

The project cost, which is used to establish the permit fee, has not been provided. Action required - Please provide the cost of just this portion of the project.
Final Development Plan
Corrective Action Required
07/11/2011

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required - This partial permit can not be issued until we have received a release from Planning and Development and the Public Works Department.
Internal Plan Review (Res) Rejected 07/12/2011 07/11/2011
Mike Weisenborn
Fire Plan Review Approved 07/12/2011 07/08/2011
Jim Eden
Misc
Corrective Action Required
07/08/2011

2006 IFC 1020.1.6 Stairway floor number signs. A sign shall be provided at each floor landing in interior exit enclosures connecting more than three stories designating the floor level, the terminus of the top and bottom of the stair enclosure and the identification of the stair. The signage shall also state the story of, and the direction to the exit discharge and the availability of roof access from the stairway for the fire department. The sign shall be located 5 feet (1524 mm) above the floor landing in a position that is readily visible when the doors are in the open and closed positions.
Construction documents - Fire protection systems
Corrective Action Required
07/08/2011

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required: Provide shop drawings for the standpipe and sprinkler system.
Construction documents for fire alarm systems
Corrective Action Required
07/08/2011

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required: Provide shop drawings for the alarm system.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $6,392.00 $6,392.00 Paid 08/08/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Concrete Walls and Columns Inspection Partial 9/21/2011 (8:00 to 5:00) 9/22/2011 at 12:00 AM 09/21/2011
Misc
Partial Correction
09/21/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; C/1; B/5; B/6;
Concrete Walls and Columns Inspection Partial 9/22/2011 at 12:00 AM 09/22/2011
Misc
Partial Correction
09/21/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; C/1; B/5; B/6; H/9; L/9;
Concrete Walls and Columns Inspection Partial 9/22/2011 at 12:00 AM 09/22/2011
Misc
Partial Correction
09/22/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; C/1; B/5; B/6; H/9; L/9; F/7; H/7; L/7;
Concrete Walls and Columns Inspection Partial 9/23/2011 at 12:00 AM 09/23/2011
Misc
Partial Correction
09/22/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; B/5; B/6; C/1; H/7; F/7; H/9; L/7; L/9; M/5; N/6; P/7;
Concrete Walls and Columns Inspection Partial 9/26/2011 at 12:00 AM 09/26/2011
Misc
Partial Correction
09/26/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; B/5; B/6; C/1; H/7; F/7; H/9; L/7; L/9; M/5; N/6; P/7; C/1; D/4; E/1; E/2; F/4; G/3; K/3;
Concrete Walls and Columns Inspection Partial 9/27/2011 at 12:00 AM 09/27/2011
Misc
Partial Correction
09/26/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; B/5; B/6; C/1; H/7; F/7; H/9; L/7; L/9; M/5; N/6; P/7; C/1; D/4; E/1; E/2; F/4; G/3; K/3; A/1; B/5; D/7; BB/14; CC/14;
Concrete Walls and Columns Inspection Partial 9/28/2011 at 12:00 AM 09/28/2011
Misc
Partial Correction
09/28/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; B/5; B/6; C/1; H/7; F/7; H/9; L/7; L/9; M/5; N/6; P/7; C/1; D/4; E/1; E/2; F/4; G/3; K/3; A/1; B/5; D/7; BB/14; CC/14; B/6; AA/13
Suspended Slab Inspection Partial 10/7/2011 at 12:00 AM 10/07/2011
Misc
Partial Correction
10/07/2011
PREPARATION TO POUR PAN DECK FLOOR STRUCTURE OK TO POUR WHEN APPROVED BY SEA : 4TH FLOOR NORTH 2/3;
Concrete Walls and Columns Inspection Partial 10/11/2011 at 12:00 AM 10/11/2011
Misc
Partial Correction
09/28/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; B/5; B/6; C/1; H/7; F/7; H/9; L/7; L/9; M/5; N/6; P/7; C/1; D/4; E/1; E/2; F/4; G/3; K/3; A/1; B/5; D/7; BB/14; CC/14; B/6; AA/13; EE/12; EE/11; O/9; P/7; N/6; M/5;
Concrete Walls and Columns Inspection Partial 10/12/2011 (8:00) 10/12/2011 at 12:00 AM 10/12/2011
Misc
Partial Correction
10/11/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; B/5; B/6; C/1; H/7; F/7; H/9; L/7; L/9; M/5; N/6; P/7; C/1; D/4; E/1; E/2; F/4; G/3; K/3; A/1; B/5; D/7; BB/14; CC/14; B/6; AA/13; EE/12; EE/11; O/9; P/7; N/6; M/5; DD/12; L/7; L/9; H/7;
Concrete Walls and Columns Inspection Partial 10/13/2011 at 12:00 AM 10/13/2011
Misc
Partial Correction
10/12/2011
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS AT LOCATIONS AT 3RD LEVEL: A/1; B/5; B/6; C/1; H/7; F/7; H/9; L/7; L/9; M/5; N/6; P/7; C/1; D/4; E/1; E/2; F/4; G/3; K/3; A/1; B/5; D/7; BB/14; CC/14; B/6; AA/13; EE/12; EE/11; O/9; P/7; N/6; M/5; DD/12; L/7; L/9; H/7; H/9;
Suspended Slab Inspection Partial 10/13/2011 (1:30) 10/13/2011 at 12:00 AM 10/13/2011
Misc
Partial Correction
10/07/2011
OK TO POUR WHEN APPROVED BY SEA PAN DECK FLOOR STRUCTURE AT FOLLOWING LEVELS: 4TH FLOOR COMPLETE;
Concrete Walls and Columns Inspection Partial 10/14/2011 at 12:00 AM 10/14/2011
Misc
Partial Correction
10/13/2011
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL;
Concrete Walls and Columns Inspection Partial 10/25/2011 at 12:00 AM 10/25/2011
Misc
Partial Correction
10/13/2011
OK TO POUR WHEN READY CONTINGENT ON S.E.A. APPROVAL C.I.P. CONCRETE COLUMNS AT FOLLOWING LOCATIONS: 3 RD LEVEL; 4TH LEVEL;
Misc
Corrective Action Required
10/25/2011
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE WALLS + INTEGRAL COLUMNS AT STAIR/ELEVATOR SHAFT AT FOLLOWING LEVELS: 3 RD LEVEL; 4TH LEVEL;
Concrete Walls and Columns Inspection Failed 1/3/2012 (1:00) 1/3/2012 at 12:00 AM 01/03/2012
Misc
Partial Correction
10/25/2011
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL; 5TH LEVEL DD122,EE10-11-12,M5,N6,P7,K3,J5,H5; H/7; H/9;
Concrete Walls and Columns Inspection Partial 1/5/2012 at 12:00 AM 01/05/2012
Misc
Partial Correction
01/03/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL; column: DD122,EE10-11-12,M5,N6,P7,K3,J5,H5; H/7; H/9;
Concrete Walls and Columns Inspection Partial 1/6/2012 (8:00) 1/6/2012 at 12:00 AM 01/06/2012
Misc
Partial Correction
01/05/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL; column: DD122,EE10-11-12,M5,N6,P7,K3,J5,H5; H/7; H/9; L/7; L/9;
Suspended Slab Inspection Partial 1/6/2012 at 12:00 AM 01/06/2012
Misc
Partial Correction
10/13/2011
OK TO POUR WHEN APPROVED BY SEA PAN DECK STRUCTURE AT FOLLOWING LEVELS: 4TH FLOOR COMPLETE; 5TH FLOOR COMPLETE;
Concrete Walls and Columns Inspection Partial 1/9/2012 (10:00) 1/9/2012 at 12:00 AM 01/09/2012
Misc
Partial Correction
01/06/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL; column: DD122,EE10-11-12,M5,N6,P7,K3,J5,H5; H/7; H/9; L/7; L/9; A/1; C/1; E/1; G/3; D/4; F/4; B/5; D/5; F/5; H/5; B/6; D/6; D/7; F/8; E/12; AA/13; BB/14; CC/14;
Rough Framing Inspection - Commercial Partial 1/24/2012 at 12:00 AM 01/24/2012
Misc
Partial Correction
01/24/2012
OK TO COVER WHEN READY LIGHT GUAGE STEEL EXTERIOR WALL FRAMING @ 3RD LEVEL FROM E/EH SE / SW TO NEAR B/6
Suspended Slab Inspection Partial 1/24/2012 at 12:00 AM 01/24/2012
Misc
Partial Correction
01/06/2012
OK TO POUR WHEN APPROVED BY SEA PAN DECK STRUCTURE AT FOLLOWING LEVELS: 4TH FLOOR COMPLETE; 5TH FLOOR COMPLETE; ROOF NORTH 1/2 RE-BAR, INSETS, FORMS IN PROGRESS
Misc
Partial Correction
01/24/2012
OK TO POUR WHEN READY CONCRETE SLAB ON METAL DECK INFILL @ 4TH LEVEL NEAR B/6
Suspended Slab Inspection Partial 1/25/2012 at 12:00 AM 01/25/2012
Misc
Partial Correction
01/24/2012
OK TO POUR WHEN READY CONCRETE SLAB ON METAL DECK INFILL @ 4TH LEVEL NEAR B/6
Misc
Partial Correction
01/25/2012
OK TO POUR WHEN APPROVED BY SEA PAN DECK STRUCTURE AT FOLLOWING LEVELS: 4TH LEVEL COMPLETE; 5TH LEVEL COMPLETE; 6TH LEVEL NORTH 2/3 RE-BAR, INSETS, FORMS PREP NEARING COMPLETION FOR SCHEDULED 1/26/2012 POUR
Concrete Walls and Columns Inspection Partial 2/2/2012 (10:00) 2/2/2012 at 12:00 AM 02/02/2012
Misc
Partial Correction
01/09/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL; column: DD122,EE10-11-12,M5,N6,P7,K3,J5,H5; H/7; H/9; L/7; L/9; A/1; C/1; E/1; G/3; D/4; F/4; B/5; D/5; F/5; H/5; B/6; D/6; D/7; F/8; E/12; AA/13; BB/14; CC/14;
Misc
Partial Correction
02/02/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE STAIR AND ELEVATOR SHAFT WALLS AT LEVELS: 3RD; 4TH; 5TH; 6TH STAIR TOWER N & W WALLS ONLY
Concrete Walls and Columns Inspection Partial 2/6/2012 at 12:00 AM 02/06/2012
Misc
Partial Correction
02/02/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL; column: DD122,EE10-11-12,M5,N6,P7,K3,J5,H5; H/7; H/9; L/7; L/9; A/1; C/1; E/1; G/3; D/4; F/4; B/5; D/5; F/5; H/5; B/6; D/6; D/7; F/8; E/12; AA/13; BB/14; CC/14;
Misc
Partial Correction
02/02/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE STAIR AND ELEVATOR SHAFT WALLS AT LEVELS: 3RD; 4TH; 5TH; 6TH
Suspended Slab Inspection Partial 2/7/2012 (2:30) 2/7/2012 at 12:00 AM 02/07/2012
Misc
Partial Correction
02/01/2012
OK TO POUR WHEN READY CONCRETE SLAB ON METAL DECK INFILL NEAR B/6 @: 4TH LEVEL ; 5TH LEVEL
Misc
Partial Correction
02/01/2012
OK TO POUR WHEN APPROVED BY SEA PAN DECK STRUCTURE AT FOLLOWING LEVELS: 4TH LEVEL COMPLETE; 5TH LEVEL COMPLETE; 6TH LEVEL SOUTH PREP SUBSTANTIALLY COMPLETED FOR SCHEDULED 2/3/2012 POUR TO COMPLETE 6TH LEVEL
Concrete Walls and Columns Inspection Partial 2/8/2012 at 12:00 AM 02/08/2012
Misc
Partial Correction
02/06/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL; A19/AB' & A19/AC' TO COMPLETE 5TH LEVEL
Misc
Partial Correction
02/06/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE STAIR AND ELEVATOR SHAFT WALLS AT LEVELS: 3RD; 4TH; 5TH; 6TH
Concrete Walls and Columns Inspection Passed 7/26/2012 at 12:00 AM 07/26/2012
Misc
Resolved
07/26/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE COLUMNS AT LOCATIONS: 3RD LEVEL; 4TH LEVEL; A19/AB' & A19/AC' TO COMPLETE 5TH LEVEL
Misc
Resolved
07/26/2012
OK TO POUR WHEN READY, CONTINGENT ON S.E.A. APPROVAL, C.I.P. CONCRETE STAIR AND ELEVATOR SHAFT WALLS AT LEVELS: 3RD; 4TH; 5TH; 6TH
Rough Framing Inspection - Commercial Passed 7/26/2012 at 12:00 AM 07/26/2012
Misc
Resolved
07/26/2012
OK TO COVER WHEN READY LIGHT GUAGE STEEL EXTERIOR WALL FRAMING @ 3RD LEVEL FROM E/EH SE / SW TO NEAR B/6
Suspended Slab Inspection Partial 10/11/2011 at 12:00 AM 07/26/2012
Misc
Resolved
07/26/2012
OK TO POUR WHEN READY CONCRETE SLAB ON METAL DECK INFILL @ 4TH LEVEL NEAR B/6
Misc
Resolved
07/26/2012
OK TO POUR WHEN APPROVED BY SEA PAN DECK STRUCTURE AT FOLLOWING LEVELS: 4TH LEVEL COMPLETE; 5TH LEVEL COMPLETE; 6TH LEVEL SOUTH PREP SUBSTANTIALLY COMPLETED FOR SCHEDULED 2/3/2012 POUR TO COMPLETE 6TH LEVEL
Suspended Slab Inspection Passed 7/26/2012 at 12:00 AM 07/26/2012
Misc
Resolved
07/26/2012
OK TO POUR WHEN READY CONCRETE SLAB ON METAL DECK INFILL NEAR B/6 @: 4TH LEVEL ; 5TH LEVEL
Misc
Resolved
07/26/2012
OK TO POUR WHEN APPROVED BY SEA PAN DECK STRUCTURE AT FOLLOWING LEVELS: 4TH LEVEL COMPLETE; 5TH LEVEL COMPLETE; 6TH LEVEL SOUTH PREP SUBSTANTIALLY COMPLETED FOR SCHEDULED 2/3/2012 POUR TO COMPLETE 6TH LEVEL
Final Inspection - Commercial Passed 7/26/2012 at 12:00 AM 07/26/2012
Documents & Images
Date Uploaded File Type Document Name
07/11/2011 Letter Plan Review Conditions
08/08/2011 Letter Building Permit
08/08/2011 Letter Plan Review Conditions
09/21/2011 Letter Inspection Summary
09/22/2011 Letter Inspection Summary
09/23/2011 Letter Inspection Summary
09/26/2011 Letter Inspection Summary
09/27/2011 Letter Inspection Summary
09/28/2011 Letter Inspection Summary
10/11/2011 Letter Inspection Summary
10/12/2011 Letter Inspection Summary
10/12/2011 Letter Inspection Summary
10/13/2011 Letter Inspection Summary
10/13/2011 Letter Inspection Summary
10/13/2011 Letter Inspection Summary
10/14/2011 Letter Inspection Summary
10/25/2011 Letter Inspection Summary
01/03/2012 Letter Inspection Summary
01/05/2012 Letter Inspection Summary
01/06/2012 Letter Inspection Summary
01/09/2012 Letter Inspection Summary
01/24/2012 Letter Inspection Summary
01/24/2012 Letter Inspection Summary
01/25/2012 Letter Inspection Summary
02/01/2012 Letter Inspection Summary
02/02/2012 Letter Inspection Summary
02/06/2012 Letter Inspection Summary
02/07/2012 Letter Inspection Summary
02/08/2012 Letter Inspection Summary
07/26/2012 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home