Permit Application Status

PRCOM20110759


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20110759
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW TENANT FINISH
NICU TENANT FINISH
04/21/2011
06/13/2011
10/06/2014
12/05/2011
Locations
Contacts
ACI BOLAND, Address:11229 NALL, SUITE 140  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
TURNER CONSTRUCTION COMPANY, Address:1220 WASHINGTON STE 1000, Phone:(816) 283-0555  
MMC CONTRACTORS NATIONAL INC, Address:13800 WYANDOTTE, Phone:(816) 941-5300  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
MMC CONTRACTORS NATIONAL INC, Address:13800 WYANDOTTE, Phone:(816) 941-5300  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 06/17/2011 07/18/2011
Brian Austerman
Fire Plan Review Approved 06/17/2011 07/05/2011
Brian Austerman
Misc
Corrective Action Required
07/05/2011

APPROVED PER CONDITIONS LISTED ON FIRST SUBMITTAL
Sprinkler Plan Review Released for Construction 07/05/2011
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
07/05/2011

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received 6/23/2011.
Misc
Corrective Action Required
07/05/2011

Sprinkler design shall be to the 2002 Edition of NFPA 13 as referenced by the 2006 Edition of the International Fire and Building Codes. For information only.
Installation acceptance testing
Corrective Action Required
07/05/2011

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action required: Call (816) 969-1300 to schedule hydrostatic and flow tests.
Internal Plan Review (Res) Approved 06/10/2011
Mike Weisenborn
Building Plan Review Approved 06/15/2011 06/10/2011
Mike Weisenborn
Misc
Resolved
06/10/2011

The application is not clear on how this space is to be addressed. It is part of the birthing center which is in the building addressed 100 NE Saint Luke's Blvd but it is located in the building addressed 110 NE Saint Luke's Blvd. Action required - Indicate how this space is to be identified. This will need to be approved by the Fire Department.
Misc
Resolved
06/10/2011

Results of the third party electrical review shall be provided. Action required - Provide documentation of the findings of the third party review. Approval of the design shall be provided prior to permit issuance. Mike Weisenborn June 10, 2011 - Comments and corrections have been provided.
Accessibility - Shower - Transfer-type dimensions
Resolved
06/10/2011

ICC/ANSI A117.1-2003 608.2.1 - Transfer-type shower compartments. Transfer-type shower compartments shall have a clear inside dimension of 36 inches in width and 36 inches in depth, measured at the center point of opposing sides. An entry 36 inches minimum in width shall be provided. A clearance of 48 inches minimum in length measured perpendicular from the control wall, and 36 inches minimum in depth shall be provided adjacent to the pen face of the compartment. Action required - The 48 inch clear space required at the transition type showers is required to be measured from the control side of the show compartment. This allows for a the seat of the wheelchair and the shower seat to line up. Make needed corrections. Mike Weisenborn June 10, 2011 - Corrections have been made.
Internal Plan Review (Res) Rejected 05/03/2011 05/04/2011
Mike Weisenborn
Building Plan Review Rejected 05/03/2011 05/04/2011
Mike Weisenborn
Misc
Corrective Action Required
05/04/2011

The application is not clear on how this space is to be addressed. It is part of the birthing center which is in the building addressed 100 NE Saint Luke's Blvd but it is located in the building addressed 110 NE Saint Luke's Blvd. Action required - Indicate how this space is to be identified. This will need to be approved by the Fire Department.
Misc
Corrective Action Required
05/04/2011

Results of the third party electrical review shall be provided. Action required - Provide documentation of the findings of the third party review. Approval of the design shall be provided prior to permit issuance.
Accessibility - Shower - Transfer-type dimensions
Corrective Action Required
05/04/2011

ICC/ANSI A117.1-2003 608.2.1 - Transfer-type shower compartments. Transfer-type shower compartments shall have a clear inside dimension of 36 inches in width and 36 inches in depth, measured at the center point of opposing sides. An entry 36 inches minimum in width shall be provided. A clearance of 48 inches minimum in length measured perpendicular from the control wall, and 36 inches minimum in depth shall be provided adjacent to the open face of the compartment. Action required - The 48 inch clear space required at the transition type showers is required to be measured from the control side of the show compartment. This allows for a the seat of the wheelchair and the shower seat to line up. Make needed corrections.
License Tax Codes Approved 05/03/2011 05/03/2011
Mike Weisenborn
Fire Plan Review Approved 05/03/2011 05/02/2011
Brian Austerman
Construction documents - Fire protection systems
Corrective Action Required
05/02/2011

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: PROVIDE SHOP DRAWINGS FOR SPRINKLER ALTERATIONS
Construction documents for fire alarm systems
Corrective Action Required
05/02/2011

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: PROVIDE SHOP DRAWINGS FOR ALARM SYSTEM ALTERATIONS
Installation acceptance testing
Corrective Action Required
05/02/2011

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: CALL 969-1300 TO SCHEDULE TESTING PRIOR TO THE FINAL
Misc
Corrective Action Required
05/02/2011

Provide Med Gas piping certifications prior to final
Portable fire extinguishers - general
Corrective Action Required
05/02/2011

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED: PROVIDE FIRE EXTINGUISHERS, 2A10B:C
Misc
Corrective Action Required
05/02/2011

2006 IFC 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble. ACTION REQUIRED: FOR UNITS 2000 CFM OR GREATER PROVIDE DUCT DETECTION THAT UPON ACTIVATION WILL SHUT DOWN THE UNIT AND SEND A SUPERVISORY SIGNAL TO THE FACP
Misc
Corrective Action Required
05/02/2011

2006 IFC 1008.1.8.6 Delayed egress locks. Approved, listed, delayed egress locks shall be permitted to be installed on doors serving any occupancy except Group A, E and H occupancies in buildings that are equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or an approved automatic smoke or heat detection system installed in accordance with Section 907, provided that the doors unlock in accordance with Items 1 through 6 below. A building occupant shall not be required to pass through more than one door equipped with a delayed egress lock before entering an exit. 1. The doors unlock upon actuation of the automatic sprinkler system or automatic fire detection system. 2. The doors unlock upon loss of power controlling the lock or lock mechanism. 3. The door locks shall have the capability of being unlocked by a signal from the fire command center. 4. The initiation of an irreversible process which will release the latch in not more than 15 seconds when a force of not more than 15 pounds (67 N) is applied for 1 second to the release device. Initiation of the irreversible process shall activate an audible signal in the vicinity of the door. Once the door lock has been released by the application of force to the releasing device, relocking shall be by manual means only. Exception: Where approved, a delay of not more than 30 seconds is permitted. 5. A sign shall be provided on the door located above and within 12 inches (305 mm) of the release device reading: PUSH UNTIL ALARM SOUNDS. DOOR CAN BE OPENED IN 15 [30] SECONDS. 6. Emergency lighting shall be provided at the door. ACTION REQUIRED: ELECTRONICALLY COLTROLLED DOORS SHALL COMPLY WITH THIS SECTION, INCLUDING LOCKS DROPPING OFF WITH A GENERAL FIRE ALARM ACTIVATION
Misc
Corrective Action Required
05/02/2011

Manual pull stations are not shown on plans
Zoning Review Approved 05/03/2011 04/22/2011
Chris Hughey
Historical Preservation Review Approved 05/03/2011 04/21/2011
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $11,605.44 $11,605.44 Paid 06/13/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Partial 7/6/2011 at 12:00 AM 07/06/2011
Misc
Partial Correction
07/06/2011
COURTESY WALK-THRU W/ SUPT TO DISCUSS UPCOMING INSPECTIONS
Rated Assembly Inspection Partial 7/20/2011 at 12:00 AM 07/20/2011
Misc
Partial Correction
07/20/2011
RATED ASSEMBLY @ NORTH, WEST, & SOUTH WALLS @ FUTURE ELEVATOR SHAFT: FRAMING + LINER BOARD OK TO COVER WHEN READY;
In-wall Inspection Partial 7/22/2011 7/22/2011 at 12:00 AM 07/22/2011
Misc
Partial Correction
07/22/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 06; 15; 19; 21; 25; 27; 38; 40; 71; 74; 75;
Rated Assembly Inspection Partial 7/27/2011 at 12:00 AM 07/27/2011
Misc
Partial Correction
07/20/2011
RATED ASSEMBLY @ NORTH, WEST, & SOUTH WALLS @ FUTURE ELEVATOR SHAFT: FRAMING + LINER BOARD OK TO COVER WHEN READY; 1ST LAYER OF 1/2" GWB;
In-wall Inspection Partial 7/27/2011 at 12:00 AM 07/27/2011
Misc
Partial Correction
07/22/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 06; 15; 19; 21; 25; 27; 38; 40; 71; 74; 75; 01 E WALL; 5; 10; 29; 73; 77;
In-wall Inspection Partial 7/28/2011 at 12:00 AM 07/28/2011
Misc
Partial Correction
07/27/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 01 E WALL; 5; 06; 10; 15; 19; 21; 25; 27; 29; 38; 40; 71; 73; 74; 75; 77; 3; 4; 8; 11; 13; 17; 23; 31; 80; 83; 84
Rated Assembly Inspection Partial 7/28/2011 at 12:00 AM 07/28/2011
Misc
Partial Correction
07/27/2011
RATED ASSEMBLY @ NORTH, WEST, & SOUTH WALLS @ FUTURE ELEVATOR SHAFT: FRAMING + LINER BOARD OK TO COVER WHEN READY; 1ST LAYER OF 1/2" GWB; 2ND LAYER OF 1/2" GWB
Misc
Partial Correction
07/28/2011
OK TO TAPE, MUD, AND FIRE-SEAL FOLLOWING RATED WALLS: CORRIDOR FACE OF EAST WALLS OF SPACES 19, 29;
In-wall Inspection Partial 8/1/2011 8/1/2011 at 12:00 AM 08/01/2011
Misc
Partial Correction
07/28/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 01 E WALL; 3; 4; 5; 06; 8; 10; 11; 13; 15; 17; 19; 21; 23; 25; 27; 29; 31; 38; 40; 71; 73; 74; 75; 77; 80; 83; 84; 00; 01; 02; 33A; 35A; 81;
Rated Assembly Inspection Partial 8/4/2011 at 12:00 AM 08/04/2011
Misc
Partial Correction
07/28/2011
RATED ASSEMBLY @ NORTH, WEST, & SOUTH WALLS @ FUTURE ELEVATOR SHAFT: FRAMING + LINER BOARD OK TO COVER WHEN READY; 1ST LAYER OF 1/2" GWB; 2ND LAYER OF 1/2" GWB
Misc
Partial Correction
07/28/2011
OK TO TAPE, MUD, AND FIRE-SEAL FOLLOWING RATED WALLS: 04; 06; 08; 10; 13; 15; 19; 21; 29; 83;
In-wall Inspection Partial 8/4/2011 at 12:00 AM 08/04/2011
Misc
Partial Correction
08/01/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 10; 11; 13; 15; 17; 19; 21; 23; 25; 27; 29; 31; 33A; 35A; 38; 40; 71; 73; 74; 75; 77; 80; 81; 83; 84; 09; 18; 30; 82 N WALL ONLY; 85; PATIENT ROOMS 54-69 EXCEPT FOR MEP BUMP-OUTS;
Rated Assembly Inspection Partial 8/8/2011 8/8/2011 at 12:00 AM 08/08/2011
Misc
Partial Correction
08/04/2011
RATED ASSEMBLY @ NORTH, WEST, & SOUTH WALLS @ FUTURE ELEVATOR SHAFT: FRAMING + LINER BOARD OK TO COVER WHEN READY; 1ST LAYER OF 1/2" GWB; 2ND LAYER OF 1/2" GWB
Misc
Partial Correction
08/04/2011
OK TO TAPE, MUD, AND FIRE-SEAL FOLLOWING RATED WALLS: 04; 06; 08; 10; 13; 15; 19; 21; 29; 83; 02; 09; 17; 30; 84;
In-wall Inspection Partial 8/8/2011 8/8/2011 at 12:00 AM 08/08/2011
Misc
Partial Correction
08/04/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 31; 33A; 35A; 38; 40; 71; 73; 74; 75; 77; 80; 81; 83; 84; 30; 82; 85; PATIENT ROOMS 52; 53; 54-69 EXCEPT FOR MEP BUMP-OUTS
Rough Plumbing Inspection - Commercial Partial 8/8/2011 at 12:00 AM 08/08/2011
Misc
Partial Correction
08/08/2011
NO ISSUES FOUND ON C.I. DWV PIPING AT UNDERSIDE OF FRONT CANOPY ROOF
In-wall Inspection Partial 8/11/2011 at 12:00 AM 08/11/2011
Misc
Partial Correction
08/08/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 31; 33A; 35A; 38; 40; PATIENT ROOMS 52-69 INCLUDING MEP BUMP-OUTS; 71; 73; 74; 75; 77; 80; 81; 83; 84; 30; 82; 85;
Rated Assembly Inspection Passed 8/16/2011 8/16/2011 at 12:00 AM 08/16/2011
Misc
Resolved
08/16/2011
RATED ASSEMBLY @ NORTH, WEST, & SOUTH WALLS @ FUTURE ELEVATOR SHAFT: FRAMING + LINER BOARD OK TO COVER WHEN READY; 1ST LAYER OF 1/2" GWB; 2ND LAYER OF 1/2" GWB
Misc
Resolved
08/16/2011
OK TO TAPE, MUD, AND FIRE-SEAL FOLLOWING RATED WALLS: 02; 04; 06; 08; 09; 10; 13; 15; 17; 19; 21; 27; 29; 30; 69 PER RFI #1; 83; 84
In-wall Inspection Partial 8/16/2011 8/16/2011 at 12:00 AM 08/16/2011
Misc
Partial Correction
08/11/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 30; 31; 33A; 35A; 38; 40; PATIENT ROOMS 52-69 INCLUDING MEP BUMP-OUTS; 71; 73; 74; 75; 77; 80; 81; 82; 83; 84; 85; 33B; 35B;
Above Ceiling Inspection Failed 8/11/2011 at 12:00 AM 08/26/2011
Misc
Corrective Action Required
08/26/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 2F002 & 2F023 NOT APPROVED TO COVER -- FULLY SCREW ALL CONNECTIONS ON FRAMING OF HANGING STRUCTURES
In-wall Inspection Partial 8/26/2011 at 12:00 AM 08/26/2011
Misc
Partial Correction
08/16/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 30; 31; 33A; 35A; 38; 40; PATIENT ROOMS 52-69 INCLUDING MEP BUMP-OUTS; 71; 73; 74; 75; 77; 80; 81; 82; 83; 84; 85; 33B; 35B; S WALL OF 2F082/N WALL OF 2F085
Above Ceiling Inspection Partial 8/30/2011 8/30/2011 at 12:00 AM 08/30/2011
Misc
Partial Correction
08/30/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 00; 01; 02; 05; 23; 77;
Rated Assembly Inspection Partial 8/30/2011 8/30/2011 at 12:00 AM 08/30/2011
Misc
Partial Correction
08/30/2011
OK TO TAPE, MUD, AND FIRE-SEAL FOLLOWING RATED WALLS: 02; 04; 06; 08; 09; 10; 13; 15; 17; 19; 21; 27; 29; 30; 69 PER RFI #1; 82 S END WALL; 83; 84; 85
Above Ceiling Inspection Partial 9/1/2011 9/1/2011 at 12:00 AM 09/01/2011
Misc
Partial Correction
08/30/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 00; 01; 02; 05; 23; 77;
Misc
Partial Correction
09/01/2011
CEILING FRAMING & ABOVE-CEILING SYSTEMS AT NORTH ENTRANCE CANOPY OK TO COVER WHEN READY.
Misc
Partial Correction
09/01/2011
OK TO COVER WHEN READY EYEBROW SOFFIT/FASCIA FRAMING AT OUTSIDE WALL BORDERING PATIENT ROOMS AT CORRIDORS 18, 30, & 81
In-wall Inspection Partial 9/2/2011 at 12:00 AM 09/02/2011
Misc
Partial Correction
08/26/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 30; 31; 33A; 35A; 38; 40; PATIENT ROOMS 52-69 INCLUDING MEP BUMP-OUTS; 71; 73; 74; 75; 77; 80; 81; 82; 83; 84; 85; 33B; 35B; S WALL OF 2F082/N WALL OF 2F085; WALL ADDED BY PR#3 @ 007 WEST OK TO COVER WHEN READY ON 007 FACE FROM DECK ABOVE TO 10' A.F.F.
Above Ceiling Inspection Partial 9/12/2011 9/12/2011 at 12:00 AM 09/12/2011
Misc
Partial Correction
09/01/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 00; 01; 02; 05; 23; 77;
Misc
Partial Correction
09/01/2011
CEILING FRAMING & ABOVE-CEILING SYSTEMS AT NORTH ENTRANCE CANOPY OK TO COVER WHEN READY.
Misc
Partial Correction
09/01/2011
OK TO COVER WHEN READY EYEBROW SOFFIT/FASCIA FRAMING AT OUTSIDE WALL BORDERING PATIENT ROOMS AT CORRIDORS 18, 30, & 81
Misc
Partial Correction
09/12/2011
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT SPACES: 15; 21; 29; 31; 33A; 35A; 35B;
In-wall Inspection Partial 9/14/2011 9/14/2011 at 12:00 AM 09/14/2011
Misc
Partial Correction
09/02/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 30; 31; 33A; 35A; 38; 40; PATIENT ROOMS 52-69 INCLUDING MEP BUMP-OUTS; 71; 73; 74; 75; 77; 80; 81; 82; 83; 84; 85; 33B; 35B; S WALL OF 2F082/N WALL OF 2F085; WALL ADDED BY PR#3 @ 3F007 WEST -- FULL HEIGHT
Above Ceiling Inspection Partial 9/14/2011 9/14/2011 at 12:00 AM 09/14/2011
Misc
Partial Correction
09/12/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 00; 01; 02; 05; 23; 77;
Misc
Partial Correction
09/12/2011
CEILING FRAMING & ABOVE-CEILING SYSTEMS AT NORTH ENTRANCE CANOPY OK TO COVER WHEN READY.
Misc
Partial Correction
09/12/2011
OK TO COVER WHEN READY EYEBROW SOFFIT/FASCIA FRAMING AT OUTSIDE WALL BORDERING PATIENT ROOMS AT CORRIDORS 18, 30, & 81
Misc
Partial Correction
09/12/2011
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT SPACES: 13; 15; 19; 21; 29; 31; 33A; 33B; 35A; 35B; 38; 40;
Rough Plumbing Inspection - Commercial Partial 9/16/2011 at 12:00 AM 09/16/2011
Misc
Partial Correction
08/08/2011
NO ISSUES FOUND ON C.I. PIPING AT: DWV ABOVE CEILING AT FRONT ENTRANCE CANOPY; VENTS FOR TWO FLOOR DRAINS @ PENTHOUSE FLOOR; DWV UNDER SECOND FLOOR PAN DECK;
In-wall Inspection Partial 9/20/2011 at 12:00 AM 09/20/2011
Misc
Partial Correction
09/14/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 30; 31; 33A; 35A; 38; 40; PATIENT ROOMS 52-69 INCLUDING MEP BUMP-OUTS; 71; 73; 74; 75; 77; 80; 81; 82; 83; 84; 85; 33B; 35B; S WALL OF 2F082/N WALL OF 2F085; WALL ADDED BY PR#3 @ 3F007 WEST -- FULL HEIGHT; FIRE WALL AT DOOR OPENING 3F00-A, AROUND OBSTRUCTIONS AND TO DECK ABOVE;
In-wall Inspection Partial 9/21/2011 (8:00 to 5:00) 9/21/2011 at 12:00 AM 09/21/2011
Misc
Partial Correction
09/20/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 30; 31; 33A; 35A; 38; 40; PATIENT ROOMS 52-69 INCLUDING MEP BUMP-OUTS; 71; 73; 74; 75; 77; 80; 81; 82; 83; 84; 85; 33B; 35B; S WALL OF 2F082/N WALL OF 2F085; WALL ADDED BY PR#3 @ 3F007 WEST -- FULL HEIGHT; FIRE WALL AT DOOR OPENING 3F00-A, AROUND OBSTRUCTIONS AND TO DECK ABOVE; SMOKE WALL AT CORRIDOR 2A128 SOUTHEAST
Above Ceiling Inspection Partial 9/22/2011 at 12:00 AM 09/22/2011
Misc
Partial Correction
09/21/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 00; 01; 02; 05; 23; 77;
Misc
Partial Correction
09/21/2011
CEILING FRAMING & ABOVE-CEILING SYSTEMS AT NORTH ENTRANCE CANOPY OK TO COVER WHEN READY.
Misc
Partial Correction
09/21/2011
OK TO COVER WHEN READY EYEBROW SOFFIT/FASCIA FRAMING AT OUTSIDE WALL BORDERING PATIENT ROOMS AT CORRIDORS 18, 30, & 81
Misc
Partial Correction
09/21/2011
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT SPACES: 13; 15; 19; 21; 25; 27; 29; 31; 33A; 33B; 35A; 35B; 38; 40; 10; 52-69;
Misc
Resolved
09/22/2011
CHECK ALL CEILING SUPPORT WIRES AT SPACES 52-69 TO ENSURE NO LATERAL DEFLECTION BETWEEN UPPER POINT OF ATTACHMENT AND LOWER POINT OF ATTACHMENT
Misc
Resolved
09/22/2011
ELECTRICAL WORK IN PROGRESS AT SPACE 55
Rated Assembly Inspection Partial 9/22/2011 at 12:00 AM 09/22/2011
Misc
Partial Correction
08/30/2011
OK TO TAPE, MUD, AND FIRE-SEAL FOLLOWING RATED WALLS: 02; 04; 06; 08; 09; 10; 13; 15; 17; 19; 21; 27; 29; 30; 69 PER RFI #1; 82 S END WALL; 83; 84; 85; 3/4" TYPE X GWB 2 HR CORRIDOR CROSSWALL AT DOOR 2F00-A (BOTH FACES @ NORTH JAMB; CORRIDOR FACE ONLY @ SOUTH JAMB);
Above Ceiling Inspection Partial 9/26/2011 (8:00 to 5:00) 9/26/2011 at 12:00 AM 09/26/2011
Misc
Partial Correction
09/22/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 00; 01; 02; 05; 23; 77;
Misc
Partial Correction
09/22/2011
CEILING FRAMING & ABOVE-CEILING SYSTEMS AT NORTH ENTRANCE CANOPY OK TO COVER WHEN READY.
Misc
Partial Correction
09/22/2011
OK TO COVER WHEN READY EYEBROW SOFFIT/FASCIA FRAMING AT OUTSIDE WALL BORDERING PATIENT ROOMS AT CORRIDORS 18, 30, & 81
Misc
Partial Correction
09/22/2011
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT SPACES: 13; 15; 19; 21; 25; 27; 29; 31; 33A; 33B; 35A; 35B; 38; 40; 10; 52-69; 4; 6; 8; 9; 83; 82; 81; 30; 18; 11;
Above Ceiling Inspection Partial 9/28/2011 at 12:00 AM 09/28/2011
Misc
Partial Correction
09/27/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 00; 01; 02; 05; 23; 77;
Misc
Partial Correction
09/27/2011
CEILING FRAMING & ABOVE-CEILING SYSTEMS AT NORTH ENTRANCE CANOPY OK TO COVER WHEN READY.
Misc
Partial Correction
09/27/2011
OK TO COVER WHEN READY EYEBROW SOFFIT/FASCIA FRAMING AT OUTSIDE WALL BORDERING PATIENT ROOMS AT CORRIDORS 18, 30, & 81
Misc
Partial Correction
09/27/2011
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT SPACES: 4; 6; 8; 9; 10; 11; 13; 15; 18; 19; 21; 25; 27; 29; 30; 31; 33A; 33B; 35A; 35B; 38; 40; 52-69; 81; 82; 83; 0; 1; 3; 5; 23; 71; 74; 75; 77; 84;
Miscellaneous Inspection Partial 10/5/2011 at 12:00 AM 10/05/2011
Misc
Partial Correction
07/06/2011
PRE-FINAL INSPECTION
Miscellaneous Inspection Partial 10/6/2011 at 12:00 AM 10/06/2011
Misc
Partial Correction
10/05/2011
PRE-FINAL INSPECTION
Sprinkler - Hydrostatic Test Passed 10/07/2011
Sprinkler - Flow Test Passed 10/07/2011
Miscellaneous Inspection Partial 10/7/2011 at 12:00 AM 10/07/2011
Misc
Partial Correction
10/06/2011
PRE-FINAL INSPECTION
Miscellaneous Inspection Partial 10/10/2011 at 12:00 AM 10/11/2011
Misc
Partial Correction
10/07/2011
PRE-FINAL INSPECTION
Alarm Test Passed 10/11/2011 at 12:00 AM 10/11/2011
Miscellaneous Inspection Passed 10/11/2011 at 12:00 AM 10/11/2011
Misc
Resolved
10/11/2011
PRE-FINAL INSPECTION
Occupancy Inspection - Codes Commercial Partial 10/12/2011 10/12/2011 at 12:00 AM 10/12/2011
Misc
Partial Correction
10/12/2011
OK TO SET UP FOR BUSINESS OPERATION. NO PATIENTS OR PUBLIC PRIOR TO APPROVAL.
Misc
Corrective Action Required
10/12/2011
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
10/12/2011
INSPECTIONS OF ELECTRICAL PANEL TERMINATIONS AND PANEL SCHEDULES IN PROGRESS.
Misc
Corrective Action Required
10/12/2011
INTERIOR SIGNAGE SUBJECT TO APPROVAL WHEN COMPLETED
Misc
Corrective Action Required
10/12/2011
COMPLETE PLACEMENT OF MISSING ELECTRICAL FACE PLATES BEFORE HOSPITAL PERSONNEL ENTER FACILITY.
Occupancy Inspection - Fire Temporary C of O 10/12/2011 at 12:00 AM 10/12/2011
Misc
Corrective Action Required
10/12/2011
(1) Coordinate the testing of the emergency lighting and the exit signs with the generator test. (2) Cooridnate the duct detection test with the HVAC contractor. (3) program the delayed egress doors to activate on the depression of the panic bar. (4) uncover the smoke dertectors throughout as the construction dust allows (5) provide the medical gas line test summary
Occupancy Inspection - Fire Passed 12/5/2011 at 12:00 AM 12/05/2011
Misc
Corrective Action Required
10/12/2011
(1) Coordinate the testing of the emergency lighting and the exit signs with the generator test. (2) Cooridnate the duct detection test with the HVAC contractor. (3) program the delayed egress doors to activate on the depression of the panic bar. (4) uncover the smoke dertectors throughout as the construction dust allows (5) provide the medical gas line test summary
Occupancy Inspection - Codes Commercial Full C of O 12/5/2011 at 12:00 AM 12/05/2011
Misc
Resolved
12/05/2011
OK TO SET UP FOR BUSINESS OPERATION. NO PATIENTS OR PUBLIC PRIOR TO APPROVAL.
Misc
Resolved
12/05/2011
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Resolved
12/05/2011
INSPECTIONS OF ELECTRICAL PANEL TERMINATIONS AND PANEL SCHEDULES IN PROGRESS.
Misc
Resolved
12/05/2011
INTERIOR SIGNAGE SUBJECT TO APPROVAL WHEN COMPLETED
Misc
Resolved
12/05/2011
COMPLETE PLACEMENT OF MISSING ELECTRICAL FACE PLATES BEFORE HOSPITAL PERSONNEL ENTER FACILITY.
Rough Plumbing Inspection - Commercial Passed 12/6/2011 at 12:00 AM 12/06/2011
Misc
Resolved
12/06/2011
NO ISSUES FOUND ON C.I. PIPING AT: DWV ABOVE CEILING AT FRONT ENTRANCE CANOPY; VENTS FOR TWO FLOOR DRAINS @ PENTHOUSE FLOOR; DWV UNDER SECOND FLOOR PAN DECK;
In-wall Inspection Passed 12/6/2011 at 12:00 AM 12/06/2011
Misc
Resolved
12/06/2011
OK TO COVER WHEN READY WALL FRAMING + IN-WALL SYSTEMS @ LOCATIONS: 00; 01; 02; 3; 4; 5; 06; 8; 09; 10; 11; 13; 15; 17; 18; 19; 21; 23; 25; 27; 29; 30; 31; 33A; 35A; 38; 40; PATIENT ROOMS 52-69 INCLUDING MEP BUMP-OUTS; 71; 73; 74; 75; 77; 80; 81; 82; 83; 84; 85; 33B; 35B; S WALL OF 2F082/N WALL OF 2F085; WALL ADDED BY PR#3 @ 3F007 WEST -- FULL HEIGHT; FIRE WALL AT DOOR OPENING 3F00-A, AROUND OBSTRUCTIONS AND TO DECK ABOVE; SMOKE WALL AT CORRIDOR 2A128 SOUTHEAST
Above Ceiling Inspection Passed 12/6/2011 at 12:00 AM 12/06/2011
Misc
Resolved
12/06/2011
FRAMING & ABOVE-CEILING SYSTEMS @ GWB CEILINGS & SOFFITS: SOFFITS @ 00; 01; 02; 05; 23; 77;
Misc
Resolved
12/06/2011
CEILING FRAMING & ABOVE-CEILING SYSTEMS AT NORTH ENTRANCE CANOPY OK TO COVER WHEN READY.
Misc
Resolved
12/06/2011
OK TO COVER WHEN READY EYEBROW SOFFIT/FASCIA FRAMING AT OUTSIDE WALL BORDERING PATIENT ROOMS AT CORRIDORS 18, 30, & 81
Misc
Resolved
12/06/2011
OK TO COVER WHEN READY ACT CEILING FRAMING & ABOVE-CEILING SYSTEMS AT SPACES: 4; 6; 8; 9; 10; 11; 13; 15; 18; 19; 21; 25; 27; 29; 30; 31; 33A; 33B; 35A; 35B; 38; 40; 52-69; 81; 82; 83; 0; 1; 3; 5; 23; 71; 74; 75; 77; 84;
Documents & Images
Date Uploaded File Type Document Name
05/04/2011 Letter Plan Review Conditions
05/04/2011 Letter Electrical Engineer Data
06/13/2011 Letter Building Permit
06/13/2011 Letter Plan Review Conditions
07/20/2011 Letter Inspection Summary
07/22/2011 Letter Inspection Summary
07/27/2011 Letter Inspection Summary
07/28/2011 Letter Inspection Summary
08/01/2011 Letter Inspection Summary
08/04/2011 Letter Inspection Summary
08/04/2011 Letter Inspection Summary
08/08/2011 Letter Inspection Summary
08/08/2011 Letter Inspection Summary
08/11/2011 Letter Inspection Summary
08/16/2011 Letter Inspection Summary
08/17/2011 Letter 20110817082807725.pdf
08/26/2011 Letter Inspection Summary
08/30/2011 Letter Inspection Summary
09/01/2011 Letter Inspection Summary
09/02/2011 Letter Inspection Summary
09/12/2011 Letter Inspection Summary
09/14/2011 Letter Inspection Summary
09/16/2011 Letter Inspection Summary
09/20/2011 Letter Inspection Summary
09/21/2011 Letter Inspection Summary
09/22/2011 Letter Inspection Summary
09/26/2011 Letter Inspection Summary
09/28/2011 Letter Inspection Summary
10/11/2011 Letter Fire Loss Reduction Form
10/12/2011 Letter Inspection Summary
10/12/2011 Letter Fire Loss Reduction Form
10/12/2011 Letter Fire Loss Reduction Form
10/12/2011 Letter Fire Loss Reduction Form
12/05/2011 Letter Fire Loss Reduction Form
12/05/2011 Letter Fire Loss Reduction Form
12/05/2011 Letter Field Certificate of Occupancy
12/07/2011 Letter Final Certificate of Occupancy
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire (Alarm) Plan Review Notice
06/21/2013 Letter Fire (Sprinkler) Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home