Summary
PRCOM20100063
Building Permit - Commercial
Final Completion
NEW OTHER
Electric service for street light light controller
11/09/2010
11/09/2010
06/26/2011
11/12/2010
Locations
Contacts
METRO ELECTRIC CO., INC., Address:6107 BLUE RIDGE  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 11/09/2010
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $30.00 $30.00 Paid 11/09/2010
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Failed 11/10/2010 at 12:00 AM 11/10/2010
E250.50 Grounding Electrode System
Corrective Action Required
11/10/2010
EXPOSE GROUNDING CONNECTIONS TO 2 GROUNDING RODS
Misc
Corrective Action Required
11/10/2010
SERVICE ENTRANCE CONDUCTORS BENDING RADIUS IS LESS THAN 5X CONDUCTOR RADIUS *I WILL GET BACK WITH YOU ON THIS AFTER I TALK TO PUBLIC WORKS INSPECTOR
Electrical Service Inspection Passed 11/12/2010 at 12:00 AM 11/12/2010
E250.50 Grounding Electrode System
Resolved
11/12/2010
EXPOSE GROUNDING CONNECTIONS TO 2 GROUNDING RODS
Misc
Resolved
11/12/2010
SERVICE ENTRANCE CONDUCTORS BENDING RADIUS IS LESS THAN 5X CONDUCTOR RADIUS *I WILL GET BACK WITH YOU ON THIS AFTER I TALK TO PUBLIC WORKS INSPECTOR
Final Electrical Inspection - Commercial Passed 11/12/2010
Documents & Images
Date Uploaded File Type Document Name
11/09/2010 Letter Building Permit
11/10/2010 Letter Inspection Summary
11/12/2010 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home