B9902254
Building Permit - Commercial
Final Completion
PFIZER INC
REPAIR REPLACE UPGRADE
FIRE PUMP REPLACEMENT
10/20/1999
11/16/1999
05/14/2000
09/25/2000
Locations
Contacts
PFIZER INC, Address:1 PFIZER WAY  
PFIZER INC, Address:150 E 42ND ST FL 38TH  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/17/2000 10/29/2010
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration- A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. ( UBC Section 305.(g))
Correction

Codes Administration- A reinspection fee may be assessed if an approved set of plans are not readily available to the inspector and the permit card is not posted at the time of the inspection. (UBC Section 305.(g))
Correction

Fire Department- Piping systems shall be substantially supported and protected against physicall damage and excessive stresses arising from settlement, vibration, expansion or contraction.(UFC Sec. 79.704.)
Correction

Fire Department- Testing- All piping shall be tested in accordance with nationally recognized standards for pressure piping or this section. the fire department shall witness the test. (UFC Sec. 79.707)
Correction

Fire Department-The diesel storage tank shall be of double wall construction, and UL approved for the product stored. Tank plan recieved 11/02/99.
Correction

Fire Department- The fire department shall witness the test of the new fire pump, and test information sent to the department by the contractor conducting the test. (UFC Section 10.503)
Correction

Fire Department- Fire-protection or extinguishing system coverage, spacing and specifications shall be maintained accordance with recognized standards at all time. Such systems shall be extended, altered or augmented as necessary to maintain and continue protection whenever any building so equipped is altered, remondeled or added to. Additions, repairs, alterations and servicing shall be in accordance with recognized standards. UFC Section 10.504(a)
Correction

Fire Department- All valves controlling the water supply for automatic sprinkler systems and water-flow switches on all sprinkler systems shall be electrically supervised when the number of sprinkler heads are one-hundred or more. Valve supervision and water-flow alarm and trouble signals shall be distinctly different and shall be automatically transmitted to an approved central station, remote station or proprietary supervising station as defined by national standards. UFC 10.508
Correction

Fire Department- Above ground storage tanks over 100 - gallon water capacity permanently installed, mounted or affixed and used for the storage of Class I, II or III-A liquids shall bear a label or placard identifying the material therin in accordance with UFC Standard No. 79-3. UFC Section 79.110
Correction

Fire Department- Electrical wiring and equipment shall be installed in a manner which provides reasonable safety to persons and property. Evidence that wiring and equipment are of the type approved for use in the hazardous locations set forth in Table No. 79.905-A and that wiring and equipment have been installed in accordance with the Electrical Code shall be provided. (Lee's Summit Building Inspection approval) UFC Section79.905.(b)
Correction

Fire Department- A fire extinguisher with a minimum rating of 2-A.20-B:C shall be provided and located such that it is not more than 75 feet from any pump, dispenser or fill-pipe opening. UFC Section 79.908
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Plan Check Fees $18.00 $18.00 Paid 11/16/1999
25 Electrical Permit Fee $15.00 $15.00 Paid 11/16/1999
25 Plumbing Permit Fees $20.00 $20.00 Paid 11/16/1999
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home