Permit Application Status

B9901970


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B9901970
Building Permit - Commercial
Final Completion
THE RAVEN COMPANY OF LEES SUMMIT LLP
NEW OTHER
EXTERIOR ATM MACHINE
09/23/1999
10/12/1999
04/09/2000
01/28/2002
Locations
Contacts
HOWELL CONSTRUCTION, Address:1009 W. 17TH ST.  
THE RAVEN COMPANY OF LEES SUMMIT LLP, Address:4210 NW LAKE DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/21/2000 10/29/2010
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration- A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. ( UBC Section 305.(g))
Correction

Codes Administration- A reinspection fee may be assessed if an approved set of plans are not readily available to the inspector and the permit card is not posted at the time of the inspection. (UBC Section 305.(g))
Correction

Conduit below grade shall have a minimum of 18 inches of earth cover. Conduit below drive and parking areas shall have 24 inches minimum of earth cover. (1990 NEC).
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $56.00 $56.00 Paid 10/12/1999
24 BLDG Plan Check Fees $6.50 $6.50 Paid 10/12/1999
25 Electrical Permit Fee $15.00 $15.00 Paid 10/12/1999
99 Erosion Control $200.00 $200.00 Paid 10/12/1999
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home