Permit Application Status

B9901915


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B9901915
Building Permit - Commercial
Final Completion
PFIZER INC
ALTERATION COMMERCIAL
BLISTER BLDG/GENERATOR
09/16/1999
09/29/1999
03/27/2000
12/05/2001
Locations
Contacts
SKCE ELECTRIC, Address:14335  
PFIZER INC, Address:150 E 42ND ST FL 38TH  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/14/2000 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration- The engineer or architect in responsible charge of the structural design work shall include in the construction documents the special inspections required by UBC section 306 and other structural inspections required by the engineer or architect. (UBC Section 302.(c))
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Codes Administration- The special inspector shall observe the work assigned for conformance, shall furnish inspection reports to the Codes Administration Department and the engineer or architect of record and shall submit a final signed report stating whether the work requiring special inspection was in conformance with the approved plans and applicable sections of this code. The final report shall be submitted prior to receiving a Certificate of Occupancy. (UBC Section 306.(c))
Correction

Codes Administration- This permit is for the structure and the pad site only. It does not include any plumbing, electrical or mechanical work.
Correction

Community Development - provide overall site plan indicating location of proposed generator pad, blister bldg, etc.; provide north arrow; exterior wall color to match existing building #100.
Correction

Fire Department- General. Buildings or portions thereof, in which hazardous materials are stored, handled or used shall be constructed in accordance with the Building Code. (UFC Section 80.108.(a))
Correction

Fire Department- Tanks shall be installed in accordance with article 79, Division V, and shall be installed in special enclosures constructed in accordance with Section 79.902(c) or in listed and approved tank enclosures or materials providing fire protection of not less than 2 hours. The following additional criteria shall apply: (a) Gaurd posts or other means shall be provided to protect the area where tanks are installed. The design shall be in accordance with Sec. 80.301(w). (b) Each tank and each special enclosure shall be surrounded by a clear space of not less than 3 feet to allow for maintenance and inspection. (c) Conspicuous signs prohibiting simultaneous tank filling and fuel dispensing shall be posted. (e) Tanks shall be provided with automatic fuel shut off devices capable of stopping the delivery of fuel when the level of the tank reaches 90 percent of tank capacity. UFC Appendix II-F
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $74.00 $74.00 Paid 09/29/1999
24 BLDG Plan Check Fees $8.00 $8.00 Paid 09/29/1999
99 Erosion Control $200.00 $200.00 Paid 09/29/1999
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home