Permit Application Status

B9901900


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B9901900
Building Permit - Commercial
Final Completion
PFIZER INC
NEW OTHER
CHILLERS FOR BLDG 102
09/15/1999
05/03/2000
10/30/2000
01/28/2002
Locations
Contacts
DOWDALL ENGINEERING, INC., Address:17659 CODY  
PFIZER INC, Address:150 E 42ND ST FL 38TH  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/13/2000 10/29/2010
Correction

Codes Administration- Each structure shall have the address of that structure visibly posted on the jobsite throughout the construction process.
Correction

Codes Administration- A completed License Tax application must be submitted to the City of Lee's Summit and any applicable License Tax paid prior to issuing a building permit.
Correction

Codes Administration- It shall be the duty of the person doing the work authorized by a permit to notifiy the Building Inspections Division that such work is ready for inspection. (UBC Section 305.(c))
Correction

Fire Department- General Comment- Any work on this project associated with the generator shall comply with UFC Article 79 and the stipulations of the Hazardous Materials Permit.
Correction

Water Utilities- Pfizer's main water supply is isolated from the public wter supply, but I recommend that the new chiller system be isolated from the plants potable water supply at point of connection.
Correction

Fire Department- Protection From Vehicles. Guard posts or other means shall be provided to protect exterior storage tanks from vehicular damage. When guard posts are installed , the posts shall be installed in accordance with Section 80.301. UFC Sec. 79.406. (b).
Correction

Community Development - Submit reduced size plan of entire site indicating total project, adjacent roadways and area of proposed improvements; provide scale and north arrow; chillers are to be screened by opaque screen walls and landscaping north and west (presume correct directions) of chiller installation; provide elevations of chillers with dimensions.
Correction

Fire Department- Fire-protection or extinguishing system coverage, spacing and specifications shall be maintained accordance with recognized standards at all time. Such systems shall be extended, altered or augmented as necessary to maintain and continue protection whenever any building so equipped is altered, remondeled or added to. Additions, repairs, alterations and servicing shall be in accordance with recognized standards. UFC Section 10.504(a)
Correction

Fire Department- If building alteration adversely effects exit illumination, exit illumination shall be provided and maintained in accordance with the Building Code. UFC Section 12.110.(A).
Correction

Fire Department- A completed hazardous materials permit application shall be submitted to the Lee's Summit fire department. (UFC Section 4.103 and UFC Section 80.103.(a))
Correction

Fire Department- Above ground storage tanks over 100 - gallon water capacity permanently installed, mounted or affixed and used for the storage of Class I, II or III-A liquids shall bear a label or placard identifying the material therin in accordance with UFC Standard No. 79-3. UFC Section 79.110
Correction

Fire Department- Electrical wiring and equipment shall be installed in a manner which provides reasonable safety to persons and property. Evidence that wiring and equipment are of the type approved for use in the hazardous locations set forth in Table No. 79.905-A and that wiring and equipment have been installed in accordance with the Electrical Code shall be provided. (Lee's Summit Building Inspection approval) UFC Section79.905.(b)
Correction

Fire Department- Combustible debris shall not be accumulated within buildings. Combustible debris, rubbish and waste material shall be removed from buildings as often as practical. Combustible debris, waste material and trash shall not be burned on site. (UFC Section 87.103.(e))
Correction

Fire Department- During construction fire department access shall be maintained and not obstructed. UFC Section 87.103.(b)
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Plan Check Fees $19.60 $19.60 Paid 05/03/2000
25 Electrical Permit Fee $15.00 $15.00 Paid 05/03/2000
25 Mechanical Permit Fees $28.00 $28.00 Paid 05/03/2000
25 Plumbing Permit Fees $20.00 $20.00 Paid 05/03/2000
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home