Permit Application Status

B9900026


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B9900026
Building Permit - Commercial
Voided
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
REMODEL OFFICE
01/12/1999
01/12/1999
07/11/1999
01/26/1999
Locations
Contacts
CITY OF LEE'S SUMMIT, Address:207 SW MARKET ST.  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
3RD STREET RESTAURANT ASSOCIATES LLC, Address:123 SE 3RD ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/11/1999 10/29/2010
Correction

Codes Administration- No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

Codes Administration- Erosion control shall be provided in conformance with Article VIII, Section VIII(c) & (d) and details 48 and 48A of the City of Lee's Summit Design and Construction Manual. Erosion control devices shall be installed and maintained during all phases of the construction process. Failure to provide or maintain erosion control may result in an issuance of a stop work order which is authorized by Article I, Section XXIV.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $23.00 $23.00 Paid 01/12/1999
24 BLDG Plan Check Fees $3.75 $3.75 Paid 01/12/1999
25 Electrical Permit Fee $15.00 $15.00 Paid 01/12/1999
24 BLDG Permit Fees ($23.00) ($23.00) $0.00 N/A
24 BLDG Plan Check Fees ($3.75) ($3.75) $0.00 N/A
25 Electrical Permit Fee ($15.00) ($15.00) $0.00 N/A
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home