Permit Application Status

B9801212


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B9801212
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW COMMERCIAL
NEW BUILDING
07/21/1998
09/30/1998
03/29/1999
09/03/1999
Locations
Contacts
CITY OF LEE'S SUMMIT, Address:207 SW MARKET ST.  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/29/1999 10/29/2010
Correction

Codes Administration- The engineer or architect in responsible charge of the structural design work shall include in the construction documents the special inspections required by UBC section 306 and other structural inspections required by the engineer or architect. (UBC Section 302.(c))
Correction

Codes Administration- The plans, computations and specifications are required to be prepared by an architect or engineer licensed by the state to practice as such even if not required by state law. (UBC Section 302.(b))
Correction

Codes Administration- A reinspection fee may be assessed if an approved set of plans are not readily available to the inspector and the permit card is not posted at the time of the inspection. (UBC Section 305.(g))
Correction

It is our understanding that the only electrical work to be done on this project is a ventilation fan and lighting which are to be supplied by a 100amp service. As the amount of electrical work is minimal, additional plans will not be required but all work shall conform to the 1990 National Electrical Code. Code compliance will be verified in the field by the inspector in the field and any needed corrections will be made to the satisfaction of the Building Inspections Division.
Correction

A variance was granted to allow a gravel drive aisle and a variance was granted to the curbing requirement.
Correction

A waiver was granted in the installation of the landscaping to future phases of development.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $428.00 $428.00 Paid 09/30/1998
24 BLDG Plan Check Fees $27.10 $27.10 Paid 09/30/1998
25 Electrical Permit Fee $30.00 $30.00 Paid 09/30/1998
99 Erosion Control $200.00 $200.00 Paid 09/30/1998
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home