Permit Application Status

B1001328


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B1001328
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
NEW TENANT FINISH
Full tenant finish for mall leasing/business office
10/26/2010
11/05/2010
01/05/2011
Locations
Contacts
CAMM CONSTRUCTION, Address:7216 MAPLE  
STEVE THE PLUMBER, Address:601 S STELLA  
PALMER ELECTRIC, INC., Address:6600 ROYAL ST BLDG B  
SOUP DESIGN, Address:6300 BROOKSIDE PLAZA, STE 511 I  
J D TOWNSEND CONSTRUCTION LLC, Address:12651 HEMLOCK ST  
AEGIS FIRE PROTECTION LLC, Address:11936 W 119TH ST #262, Phone:(913) 825-0343  
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Approved 11/11/2010
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
11/11/2010

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans submitted November 5, 2010.
Installation acceptance testing
Corrective Action Required
11/11/2010

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule testing.
Misc
Corrective Action Required
11/11/2010

Fire Department - Coordinate addressing of the tamper flow switches with the alarm suystem contractor.
Internal Plan Review (Res) Approved 11/05/2010 11/05/2010
Mike Weisenborn
Alarm Plan Review Approved 11/04/2010
Jim Eden
Fire Plan Review Approved 11/05/2010 11/04/2010
Jim Eden
Address numbers required
Corrective Action Required
11/04/2010

Fire Department- 2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required: Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
11/04/2010

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required: Provide shop drawings for sprinkler alterations.
Construction documents for fire alarm systems
Corrective Action Required
11/04/2010

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required: Provide shop drawings for alarm system alterations.
Installation acceptance testing
Corrective Action Required
11/04/2010

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action required: Call (816) 969-1300 to schedule a test.
Building Plan Review Approved 11/05/2010 11/04/2010
Mike Weisenborn
Zoning Review Approved 11/05/2010 11/03/2010
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $461.58 $461.58 Paid 11/05/2010
8331507-Sewer Connection Fee $90.00 $90.00 Paid 11/05/2010
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 11/08/2010
Misc
Partial Correction
11/08/2010
WALL FRAMING + IN-WALL SYSTEMS OK TO COVER WHEN READY: EXTERIOR WALLS ONLY;
Misc
Corrective Action Required
11/08/2010
ISOLATE COPPER WATER PIPING FROM STEEL STUD EDGE
Misc
Corrective Action Required
11/08/2010
PROTECT PVC VENT PIPE AT TOP TRACK
Misc
Corrective Action Required
11/08/2010
SCREW ALL CONNECTIONS OF LIGHT GUAGE FRAMING WITHIN WIDTH OF ALL OPENINGS
Underslab Plumbing Inspection - Commercial Passed 11/8/2010 at 12:00 AM 11/08/2010
All Rough Inspection - Commercial Passed 11/9/2010 at 12:00 AM 11/09/2010
Misc
Resolved
11/09/2010
Gas Service Inspection - Commercial Passed 11/10/2010 at 12:00 AM 11/10/2010
Gas Piping Inspection - Commercial Passed 11/10/2010
Rated Assembly Inspection Partial 11/11/2010 at 12:00 AM 11/11/2010
Misc
Corrective Action Required
11/11/2010
5/8" TYPE X GWB @ TYPE B NORTH & WEST WALLS OK TO TAPE, MUD, & FIRE-SEAL AFTER GWB IS SCREWED AT 8" O/C AT BOTTOM TRACK
Underslab Electrical Inspection - Commercial Passed 11/23/2010 at 12:00 AM 11/23/2010
Above Ceiling Inspection Partial 11/23/2010 at 12:00 AM 11/23/2010
Misc
Partial Correction
11/23/2010
OK TO COVER WHEN READY FRAMING & ABOVE-CEILING SYSTEMS AT GWB CEILING AT RECEPTION/WAITING
Above Ceiling Inspection Partial 11/24/2010 at 12:00 AM 11/24/2010
Misc
Partial Correction
11/23/2010
OK TO COVER WHEN READY FRAMING & ABOVE-CEILING SYSTEMS AT: GWB CEILINGS / SOFFITS @ RECEPTION/WAITING & @ FRONT ENTRANCE
Sprinkler - Flow Test Passed 8/19/2010 at 12:00 AM 12/01/2010
Electrical Service Inspection Passed 12/1/2010 at 12:00 AM 12/01/2010
Above Ceiling Inspection Passed 12/6/2010 at 12:00 AM 12/06/2010
Misc
Resolved
12/06/2010
OK TO COVER WHEN READY FRAMING & ABOVE-CEILING SYSTEMS AT: GWB CEILINGS / SOFFITS @ RECEPTION/WAITING & @ FRONT ENTRANCE
Alarm Test Passed 12/15/2010 at 12:00 AM 12/15/2010
Occupancy Inspection - Fire Passed 12/15/2010 at 12:00 AM 12/15/2010
Gas Piping Inspection - Commercial Passed 12/15/2010 at 12:00 AM 12/15/2010
Rated Assembly Inspection Passed 12/15/2010
Misc
Resolved
12/15/2010
5/8" TYPE X GWB @ TYPE B NORTH & WEST WALLS OK TO TAPE, MUD, & FIRE-SEAL AFTER GWB IS SCREWED AT 8" O/C AT BOTTOM TRACK
Occupancy Inspection - Codes Commercial Temporary C of O 12/15/2010 at 12:00 AM 12/15/2010
Misc
Corrective Action Required
12/15/2010
HOT-NEUTRAL REVERSE AT RECEPTACLE POINTED-OUT -- CORRECTED.
Misc
Corrective Action Required
12/15/2010
SETBACK OF RECEPTACLE FOR MICROWAVE OVEN: COMBUSTIBLE SURFACE REQUIRES ZERO SETBACK
Misc
Corrective Action Required
12/15/2010
BORROWED LIGHT UNIT SIDELIGHTS NOT GLAZED -- SUBJECT TO APPROVAL -- MUST BE SAFETY GLAZED.
Misc
Corrective Action Required
12/15/2010
ELECTRICAL SERVICE PANELS NOT DESIGNATED -- LABEL EXTERIOR PER DRAWING OR PER OCCUPANT PREFERENCE.
Misc
Corrective Action Required
12/15/2010
CHECK CLAMPS ON ROOFTOP GAS PIPING BLOCKS -- USE CORRECT SIZE CLAMPS TO PREVENT BLOCKS FROM DRIFTING.
Misc
Corrective Action Required
12/15/2010
PENDANT LIGHTS + ONE CAN LIGHT NOT YET INSTALLED -- SUBJECT TO APPROVAL
Occupancy Inspection - Codes Commercial Temporary C of O 12/15/2010
Misc
Corrective Action Required
12/15/2010
HOT-NEUTRAL REVERSE AT RECEPTACLE POINTED-OUT -- CORRECTED.
Misc
Corrective Action Required
12/15/2010
SETBACK OF RECEPTACLE FOR MICROWAVE OVEN: COMBUSTIBLE SURFACE REQUIRES ZERO SETBACK
Misc
Corrective Action Required
12/15/2010
BORROWED LIGHT UNIT SIDELIGHTS NOT GLAZED -- SUBJECT TO APPROVAL -- MUST BE SAFETY GLAZED.
Misc
Corrective Action Required
12/15/2010
ELECTRICAL SERVICE PANELS NOT DESIGNATED -- LABEL EXTERIOR PER DRAWING OR PER OCCUPANT PREFERENCE.
Misc
Corrective Action Required
12/15/2010
CHECK CLAMPS ON ROOFTOP GAS PIPING BLOCKS -- USE CORRECT SIZE CLAMPS TO PREVENT BLOCKS FROM DRIFTING.
Misc
Corrective Action Required
12/15/2010
PENDANT LIGHTS + ONE CAN LIGHT NOT YET INSTALLED -- SUBJECT TO APPROVAL
Sprinkler - Flow Test Partial 8/19/2010 at 12:00 AM 12/16/2010
Corrective Action Required
12/16/2010
Flow alarm and Tamper switch at the isolation valve of the suite need to addressed in the FACP as Suite B
Occupancy Inspection - Codes Commercial Full C of O 1/5/2011 at 12:00 AM 01/05/2011
Misc
Resolved
01/05/2011
HOT-NEUTRAL REVERSE AT RECEPTACLE POINTED-OUT -- CORRECTED.
Misc
Resolved
01/05/2011
SETBACK OF RECEPTACLE FOR MICROWAVE OVEN: COMBUSTIBLE SURFACE REQUIRES ZERO SETBACK
Misc
Resolved
01/05/2011
BORROWED LIGHT UNIT SIDELIGHTS NOT GLAZED -- SUBJECT TO APPROVAL -- MUST BE SAFETY GLAZED.
Misc
Resolved
01/05/2011
ELECTRICAL SERVICE PANELS NOT DESIGNATED -- LABEL EXTERIOR PER DRAWING OR PER OCCUPANT PREFERENCE.
Misc
Resolved
01/05/2011
CHECK CLAMPS ON ROOFTOP GAS PIPING BLOCKS -- USE CORRECT SIZE CLAMPS TO PREVENT BLOCKS FROM DRIFTING.
Misc
Resolved
01/05/2011
PENDANT LIGHTS + ONE CAN LIGHT NOT YET INSTALLED -- SUBJECT TO APPROVAL
Documents & Images
Date Uploaded File Type Document Name
11/05/2010 Letter Building Permit
11/05/2010 Letter Plan Review Conditions
11/08/2010 Letter Inspection Summary
11/08/2010 Letter Inspection Summary
11/09/2010 Letter Inspection Summary
11/10/2010 Letter Inspection Summary
11/11/2010 Letter Inspection Summary
11/11/2010 Letter Fire (Sprinkler) Plan Review
11/23/2010 Letter Inspection Summary
11/24/2010 Letter Inspection Summary
12/01/2010 Letter Inspection Summary
12/06/2010 Letter Inspection Summary
12/06/2010 Letter Inspection Summary
12/15/2010 Letter Fire Loss Reduction Form
12/15/2010 Letter Fire Loss Reduction Form
12/15/2010 Letter Fire Loss Reduction Form
12/15/2010 Letter Fire Loss Reduction Form
12/15/2010 Letter Temporary Certificate of Occupancy
12/16/2010 Letter Fire Loss Reduction Form
01/05/2011 Letter Final Certificate of Occupancy
01/06/2011 Letter Final Certificate of Occupancy
01/06/2011 Letter Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home