Permit Application Status

B1001158


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B1001158
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
RESPIRATORY THERAPY REMODEL
09/20/2010
10/14/2010
04/12/2011
12/28/2010
Locations
Contacts
ACI BOLAND - KANSAS CITY, Address:1421 E 104TH STREET  
J E DUNN CONSTRUCTION, Address:1001 LOCUST  
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
P1 GROUP INC, Address:16210 WEST 108TH ST  
CATES SHEET METAL IND INC, Address:15555 W 108TH ST  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/11/2011 10/29/2010
Correction

Fire Department- 2006 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department: Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators, and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Documentation shall be provided of the pressure test of at least 150 psi for a minimum of 24 hours on installers letterhead.
Correction

Codes Administration - 2006 IBC 706.10 - Ducts and air transfer openings. Penetrations in a fire barrier by ducts and air transfer openings shall comply with Section 716.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $494.85 $494.85 Paid 10/14/2010
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rated Assembly Inspection Partial 11/17/2010 at 12:00 AM 11/17/2010
Misc
Partial Correction
11/17/2010
CONSTRUCTION OF FIRE-RATED WALLS OK TO COVER WHEN READY FOLLOWING ELEMENTS: 1A029 S WALL + 1A030B S & E WALLS OK TO TAPE, MUD, FIRE-SEAL;
In-wall Inspection Partial 11/17/2010 at 12:00 AM 11/17/2010
Misc
Partial Correction
11/12/2010
OK TO COVER WHEN READY FRAMING & IN-WALL SYSTEMS @ FOLLOWING SPACES: ALL INCLUDING 1A031 & 1A032 N WALLS + 1A029 W WALL;
Rated Assembly Inspection Partial 11/18/2010 at 12:00 AM 11/18/2010
Misc
Partial Correction
11/17/2010
CONSTRUCTION OF FIRE-RATED WALLS OK TO TAPE, MUD, FIRE-SEAL WHEN READY FOLLOWING ELEMENTS: 1A029 S WALL + 1A030B S & E WALLS; 1A029 W WALL; 1A030 S WALL;
Rated Assembly Inspection Partial 11/19/2010
Misc
Partial Correction
11/18/2010
CONSTRUCTION OF FIRE-RATED WALLS OK TO TAPE, MUD, FIRE-SEAL WHEN READY FOLLOWING ELEMENTS: 1A029 S WALL + 1A030B S & E WALLS; 1A029 W WALL; 1A030 S WALL; 1A029 N & E WALLS; 1A030B N & W WALLS;
Rated Assembly Inspection Partial 11/23/2010 at 12:00 AM 11/23/2010
Misc
Partial Correction
11/19/2010
CONSTRUCTION OF FIRE-RATED WALLS OK TO TAPE, MUD, FIRE-SEAL WHEN READY FOLLOWING ELEMENTS: 1A029 S WALL + 1A030B S & E WALLS; 1A029 W WALL; 1A030 S WALL; 1A029 N & E WALLS; 1A030B N & W WALLS;
Misc
Partial Correction
11/23/2010
PER ASI#1 CONSTRUCTION OF 1-HR FIRE-RATED LID ABOVE ACOUSTICAL CEILING AT 1A029 OK TO COVER FOLLOWING ELEMENTS: FRAMING AND SHAFT LINER BOARD AT TOP FACE;
In-wall Inspection Passed 11/24/2010 at 12:00 AM 11/24/2010
Misc
Resolved
11/24/2010
OK TO COVER WHEN READY FRAMING & IN-WALL SYSTEMS @ FOLLOWING SPACES: ALL INCLUDING 1A031 & 1A032 N WALLS + 1A029 W WALL;
Rated Assembly Inspection Partial 11/24/2010 at 12:00 AM 11/24/2010
Misc
Partial Correction
11/23/2010
CONSTRUCTION OF FIRE-RATED WALLS OK TO TAPE, MUD, FIRE-SEAL WHEN READY FOLLOWING ELEMENTS: 1A029 S WALL + 1A030B S & E WALLS; 1A029 W WALL; 1A030 S WALL; 1A029 N & E WALLS; 1A030B N & W WALLS;
Misc
Partial Correction
11/23/2010
PER ASI#1 CONSTRUCTION OF 1-HR FIRE-RATED LID ABOVE ACOUSTICAL CEILING AT 1A029 -- OK TO COVER FOLLOWING ELEMENTS: FRAMING AND SHAFT LINER BOARD AT TOP FACE; SINGLE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, & FIRE SEAL
Rated Assembly Inspection Partial 11/29/2010 at 12:00 AM 11/29/2010
Misc
Partial Correction
11/24/2010
CONSTRUCTION OF FIRE-RATED WALLS OK TO TAPE, MUD, FIRE-SEAL WHEN READY FOLLOWING ELEMENTS: 1A029 S WALL + 1A030B S & E WALLS; 1A029 W WALL; 1A030 S WALL; 1A029 N & E WALLS; 1A030B N & W WALLS; 1A029 W WALL CORRIDOR FACE ABOVE CEILING TAPED, MUDDED, & FIRE-SEALED
Misc
Partial Correction
11/24/2010
PER ASI#1 CONSTRUCTION OF 1-HR FIRE-RATED LID ABOVE ACOUSTICAL CEILING AT 1A029 -- OK TO COVER FOLLOWING ELEMENTS: FRAMING AND SHAFT LINER BOARD AT TOP FACE; SINGLE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, & FIRE SEAL
Above Ceiling Inspection Partial 12/6/2010 at 12:00 AM 12/06/2010
Misc
Partial Correction
12/06/2010
ABOVE CEILING ROOMS: 1A030-A,C,D,E
Above Ceiling Inspection Partial 12/7/2010 at 12:00 AM 12/07/2010
Misc
Partial Correction
12/06/2010
ABOVE CEILING ROOMS: 1A0-29,30-A,B,C,D,E. 31,32
Occupancy Inspection - Fire Passed 12/27/2010 at 12:00 AM 12/27/2010
Above Ceiling Inspection Passed 12/27/2010 at 12:00 AM 12/27/2010
Misc
Resolved
12/27/2010
ABOVE CEILING ROOMS: 1A0-29,30-A,B,C,D,E. 31,32
In-wall Inspection Partial 11/12/2010 at 12:00 AM 12/27/2010
Misc
Partial Correction
11/12/2010
OK TO COVER WHEN READY FRAMING & IN-WALL SYSTEMS @ FOLLOWING SPACES: ALL EXCEPT 031 & 032 N WALLS
In-wall Inspection Passed 12/27/2010 at 12:00 AM 12/27/2010
Rated Assembly Inspection Passed 12/27/2010 at 12:00 AM 12/27/2010
Misc
Resolved
12/27/2010
CONSTRUCTION OF FIRE-RATED WALLS OK TO TAPE, MUD, FIRE-SEAL WHEN READY FOLLOWING ELEMENTS: 1A029 S WALL + 1A030B S & E WALLS; 1A029 W WALL; 1A030 S WALL; 1A029 N & E WALLS; 1A030B N & W WALLS; 1A029 W WALL CORRIDOR FACE ABOVE CEILING TAPED, MUDDED, & FIRE-SEALED
Misc
Resolved
12/27/2010
PER ASI#1 CONSTRUCTION OF 1-HR FIRE-RATED LID ABOVE ACOUSTICAL CEILING AT 1A029 -- OK TO COVER FOLLOWING ELEMENTS: FRAMING AND SHAFT LINER BOARD AT TOP FACE; SINGLE LAYER 5/8" TYPE X GWB OK TO TAPE, MUD, & FIRE SEAL
Final Inspection - Commercial Passed 12/27/2010 at 12:00 AM 12/27/2010
Documents & Images
Date Uploaded File Type Document Name
11/12/2010 Letter Inspection Summary
11/17/2010 Letter Inspection Summary
11/18/2010 Letter Inspection Summary
11/19/2010 Letter Inspection Summary
11/23/2010 Letter Inspection Summary
11/24/2010 Letter Inspection Summary
11/29/2010 Letter Inspection Summary
12/06/2010 Letter Inspection Summary
12/07/2010 Letter Inspection Summary
12/27/2010 Letter Fire Loss Reduction Form
12/27/2010 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home