Permit Application Status

B1000638


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B1000638
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
NEW TENANT FINISH
TENANT FINISH FOR CANDLE SALES
06/11/2010
08/11/2010
03/21/2011
09/24/2010
Locations
Contacts
MATTHEW DIX INC, Address:28710 FLINT ST  
DONALDSON MECHANICAL INC., Address:934 B SE 7TH TR  
PLOWMAN CONSTRUCTION COMPANY LLC, Address:905 E PARK  
J BIRD ELECTRIC INC, Address:11230 E 350 HWY  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/10/2011 10/29/2010
Correction

Fire Department- 2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenat commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Correction

Fire Department- 2006 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible.
Correction

Fire Department- 2006 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Codes Administration - 2006 IBC 1014.1 - Egress through intervening spaces. Egress through intervening spaces shall comply with this section. 1. Egress from a room or space shall not pass through adjoining or intervening rooms or areas, except where such adjoining rooms or areas are accessory to the area served, are not a high-hazard occupancy and provide a discernible path of egress travel to an exit. (See actual code for exceptions.) 2. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See actual code for exceptions.) 3. An exit access shall not pass through a room that can be locked to prevent egress. 4. Means of egress from dwelling units or sleeping areas shall not lead through other sleeping areas, toilet rooms or bathrooms.
Correction

Codes Administration - The rear wall of this space is part of a one-hour fire-rated corridor. The construction of the rated assembly shall be maintained/completed during the construction of this space.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $549.50 $549.50 Paid 08/11/2010
89 Sewer Tap Fees $120.00 $120.00 Paid 08/11/2010
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 08/16/2010
Correction
Resolved
08/16/2010
None RESTROOM UNDERSLAB PLUMBING OK
Rated Assembly Inspection Partial 08/20/2010
Correction
Partial Correction
08/20/2010
GWB AT UL RATED WALLS ATTACHMENT/FASTENING APPROVED. TOP OF WALL DETAIL TO BE RESOLVED BEFORE COVERING. NO & SO DEMISING WALLS 5/8" TYPE X
Underslab Electrical Inspection - Commercial Passed 08/20/2010
Correction
Resolved
08/20/2010
UNDER-SLAB ELECTRICAL CONDUIT OK TO COVER WHEN READY MATERIAL & WORKMANSHIP NO ISSUES FOUND
Underground Electrical Inspection - Commercial Request Complete 8/19/2010 8/20/2010 08/20/2010
All Rough Inspection - Commercial Passed 08/27/2010
Correction
Resolved
08/27/2010
WALL FRAMING + IN-WALL SYSTEMS OK TO COVER WHEN READY ALL INCLUDING E EXTERIOR & SOFFIT/BULKHEAD @ EAST
Electrical Service Inspection Passed 08/27/2010
Correction
Resolved
08/27/2010
ELECTRICAL SERVICE INSTALLATION RELEASE SERVICE 480/277V 3P > 30KVA XFMR > 208/120V 3P 4W 100A
All Rough Inspection - Commercial Passed 09/01/2010
Correction
Resolved
09/01/2010
None Pre-Wrap of Ducts
Above Ceiling Inspection Passed 09/13/2010
Correction
Resolved
09/13/2010
None OKAY TO HANG TILE
Rated Assembly Inspection Passed 09/23/2010
Correction
Resolved
09/23/2010
GWB AT UL RATED WALLS ATTACHMENT/FASTENING APPROVED. TOP OF WALL DETAIL TO BE RESOLVED BEFORE COVERING. NO & SO DEMISING WALLS 5/8" TYPE X
Occupancy Inspection - Codes Commercial Passed 09/23/2010
Correction
Resolved
09/23/2010
None
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home