Permit Application Status

B1000104


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B1000104
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
NEW TENANT FINISH
JOS A BANK TENANT FINISH
02/09/2010
03/03/2010
08/30/2010
06/04/2010
Locations
Contacts
J BIRD ELECTRIC INC, Address:11230 E 350 HWY  
PLOWMAN CONSTRUCTION COMPANY LLC, Address:905 E PARK ST  
MATTHEW DIX INC, Address:28710 FLINT ST  
DONALDSON MECHANICAL INC., Address:934 B SE 7TH TR  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/29/2010 10/29/2010
Correction

Fire Department- 2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenat commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Correction

Fire Department- 2006 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Codes Administration - 2006 IBC 1008.1.1 - Size of doors. The minimum width of each door opening shall be sufficient for the occupant load thereof and shall provide a clear width of not less than 32 inches. Clear openings of doorways with swinging doors shall be measured between the face of the door and the stop, with the door open 90 degrees. Where this section requires a minimum clear width of 32 inches and a door opening includes two door leaves without a mullion, one leaf shall provide a clear width of 32 inches. The maximum width of a swinging door leaf shall be 48 inches nominal. Means of egress doors in Group I-2 occupancy used for the movement of beds shall provide a clear width not less than 41.5 inches. The height of doors shall not be less than 80 inches.
Correction

Codes Administration - 2006 IBC 1210.1 - Floors. In other than dwelling units, toilet and bathing room floors shall have a smooth, hard, nonabsorbant surface that extends upward onto the walls at least 6 inches.
Correction

Codes Administration - The location of the door into the egress corridor for the second exit does not match what was shown and permitted for the construction of the corridor.
Correction

Codes Administration - Per the structural plans for the shell building, there is a column at the entersection of gridlines C2 and CH. This would be in the middle of the cashwrap area and is not shown on your plans.
Correction

Codes Administration - The bottom chord braces at the rtu(s) shall be welded once the units have been installed. This will be verified by the city inspection staff.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $329.70 $329.70 Paid 03/03/2010
89 Sewer Tap Fees $180.00 $180.00 Paid 03/03/2010
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Passed 03/11/2010
Correction
Resolved
03/11/2010
UNDER-SLAB ELECTRICAL CONDUIT OK TO COVER WHEN READY MATERIAL & WORKMANSHIP NO ISSUES FOUND
Underslab Plumbing Inspection - Commercial Passed 03/11/2010
Correction
Resolved
03/11/2010
UNDER-SLAB SANITARY WASTE, SOIL, VENT PIPING OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Request Complete 3/10/2010 3/11/2010 03/11/2010
All Rough Inspection - Commercial Partial 03/15/2010
Correction
Partial Correction
03/15/2010
WALL FRAMING + IN-WALL SYSTEMS AFTER ALL STUD TOPS ARE FRAMED TO PRIMARY STRUCTURE OR HEADERS NORTH DEMISING WALL OK TO COVER EXCEPT WHERE ELECTRICAL TO BE INSTALLED; OK TO COVER WHEN READY WALLS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 3/12/2010 3/15/2010 03/15/2010
All Rough Inspection - Commercial Partial 03/16/2010
Correction
Partial Correction
03/16/2010
WALL FRAMING + IN-WALL SYSTEMS ALL EXCEPT FITTING ROOMS, RESTROOMS, AND 3-WAY MIRROR ENCLOSURE; OK TO COVER WHEN READY WALLS LISTED BELOW:
All Rough Inspection - Commercial Partial 03/19/2010
Correction
Partial Correction
03/19/2010
WALL FRAMING + IN-WALL SYSTEMS ALL EXCEPT RESTROOMS, 3-WAY MIRROR ENCLOSURE AND HANGING FRAMING AT PERIMETER (FITTING ROOMS OK TO COVER); RESTROOMS: SHIELD PLATES REQUIRED AT ALL FRAMING (INCLUDING STUDS) WHERE PVC OR COPPER PIPE ARE <1-1/2" FROM FACE OK TO COVER WHEN READY WALLS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 3/18/2010 3/19/2010 03/19/2010
All Rough Inspection - Commercial Partial 03/23/2010
Correction
Partial Correction
03/23/2010
WALL FRAMING + IN-WALL SYSTEMS REAR AREA INCLUDING FITTING ROOMS & RESTROOMS; 3-WAY MIRROR ENCLOSURE; HANGING FRAMING AT PERIMETER; OK TO COVER WHEN READY WALLS LISTED BELOW:
Rough Mechanical Inspection - Commercial Passed 03/23/2010
Correction
Resolved
03/23/2010
HVAC DUCT OK TO INSULATE
All Rough Inspection - Commercial Partial 03/24/2010
Correction
Partial Correction
03/24/2010
WALL FRAMING + IN-WALL SYSTEMS REAR AREA INCLUDING FITTING ROOMS & RESTROOMS; 3-WAY MIRROR ENCLOSURE; HANGING FRAMING AT PERIMETER; ALL REMAINING VERTICAL FRAMED STRUCTURE EXCEPT HORSESHOE FASCIA OK TO COVER WHEN READY WALLS LISTED BELOW:
All Rough Inspection - Commercial Partial 03/26/2010
Correction
Partial Correction
03/26/2010
WALL FRAMING + IN-WALL SYSTEMS REAR AREA INCLUDING FITTING ROOMS & RESTROOMS; 3-WAY MIRROR ENCLOSURE; HANGING FRAMING AT PERIMETER; ALL REMAINING VERTICAL FRAMED STRUCTURE EXCEPT HORSESHOE FASCIA (FLANGES NOT FULLY SCREWED) OK TO COVER WHEN READY WALLS LISTED BELOW:
Gas Piping Inspection - Commercial Passed 03/26/2010
Gas Service Inspection - Commercial Passed 03/26/2010
Correction
Resolved
03/26/2010
GAS PIPING PRESSURE TEST RELEASE GAS SERVICE PRESSURE HELD STEADY AT >= 10 PSI FOR >=10 MIN
Rough Framing Inspection - Commercial Request Complete 3/25/2010 3/26/2010 03/26/2010
Electrical Service Inspection Passed 04/01/2010
Correction
Resolved
04/01/2010
ELECTRICAL SERVICE INSTALLATION ENSURE PANEL FRONTS ARE IN PLACE BEFORE SERVICE ACTIVATION. 277/480V; 3P; 200A +XFRMR RELEASE SERVICE
All Rough Inspection - Commercial Passed 04/01/2010
Correction
Resolved
04/01/2010
WALL FRAMING + IN-WALL SYSTEMS OK TO COVER WHEN READY
Electrical Service Inspection Passed 04/01/2010
All Rough Inspection - Commercial Passed 04/01/2010
Above Ceiling Inspection Not Ready 04/20/2010
Correction
Corrective Action Required
04/20/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS NOT READY FOR INSPECTION
Above Ceiling Inspection Partial 04/21/2010
Correction
Partial Correction
04/21/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS PER NEC, WET PIPING NOT ALLOWED ABOVE UNPROTECTED ELECTRICAL EQUIPMENT. OK TO COVER WHEN READY EXCEPT ABOVE TRANSFORMER
Occupancy Inspection - Codes Commercial Partial 04/22/2010
Correction
Partial Correction
04/22/2010
INSTALLATION OF LIGHTED SIGNS
Correction
Corrective Action Required
04/22/2010
Receive Fire Department approval
Miscellaneous Inspection Partial 04/23/2010
Correction
Partial Correction
04/23/2010
PROGRESSIVE PRE-FINAL INSPECTION
Occupancy Inspection - Codes Commercial Not Ready 04/23/2010
Correction
Corrective Action Required
04/23/2010
ROOFTOP FINAL INSPECTION SUBJECT TO APPROVAL WHEN READY
Correction
Corrective Action Required
04/23/2010
"NO SMOKING" SIGN TO BE AFFIXED PUBLIC ENTRANCE
Correction
Resolved
04/23/2010
INSTALLATION OF LIGHTED SIGNS NO ISSUES FOUND ALL SIGN ELEMENTS LABELED
Occupancy Inspection - Codes Commercial Failed 04/30/2010
Correction
Corrective Action Required
04/30/2010
ROOFTOP FINAL INSPECTION 1) ROOFTOP GAS PIPING SUPPORTS: STACKED BLOCKS NOT FASTENED TOGETHER 2) FINAL CLEANUP NOT COMPLETED: REMOVE ALL DEBRIS AND UNUSED MATERIAL & HARDWARE ISSUES STATED BELOW:
Correction
Corrective Action Required
04/30/2010
PERMANENT ADDRESS LABELING OF SERVICE METER/DISCONNECT FELT-TIP MARKER NOT CONSIDERED PERMANENT LABEL NOT AFFIXED
Correction
Corrective Action Required
04/30/2010
REAR EGRESS CORRIDOR CONTACT RED DEVELOPMENT UNDER OTHER'S PERMIT NOT APPROVED
Correction
Corrective Action Required
04/30/2010
ELECTRICAL PANEL SCHEDULE TO BE UPDATED/COMPLETED
Correction
Corrective Action Required
04/30/2010
STATE BOILER INSPECTION PROVIDE DOCUMENTATION OF INSPECTION APPROVAL
Correction
Resolved
04/30/2010
Receive Fire Department approval PER CPT JOE DIR 4/30/2010
Miscellaneous Inspection Passed 04/30/2010
Correction
Resolved
04/30/2010
PROGRESSIVE PRE-FINAL INSPECTION
Above Ceiling Inspection Passed 04/30/2010
Correction
Resolved
04/30/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS
Occupancy Inspection - Codes Commercial Failed 05/03/2010
Correction
Partial Correction
05/03/2010
REAR EGRESS CORRIDOR CORRECTIONS IN PROGRESS UNDER OTHER'S PERMIT
Correction
Partial Correction
05/03/2010
USE / OCCUPANCY APPROVAL STATUS UNTIL APPROVED OK TO SET UP FOR BUSINESS NO PUBLIC ENTRY
Occupancy Inspection - Codes Commercial Failed 05/05/2010
Correction
Resolved
05/05/2010
ROOFTOP FINAL INSPECTION
Correction
Resolved
05/05/2010
"NO SMOKING" SIGN
Correction
Resolved
05/05/2010
PERMANENT ADDRESS LABELING OF SERVICE METER/DISCONNECT
Correction
Resolved
05/05/2010
REAR EGRESS CORRIDOR COMPLETION IN PROGRESS UNDER OTHER'S PERMIT
Correction
Resolved
05/05/2010
ELECTRICAL PANEL SCHEDULE
Correction
Partial Correction
05/05/2010
USE / OCCUPANCY APPROVAL STATUS SEE TEMPORARY OCCUPANCY
Occupancy Inspection - Codes Commercial Passed 06/03/2010
Correction
Resolved
06/03/2010
STATE BOILER INSPECTION PROVIDE DOCUMENTATION OF INSPECTION APPROVAL
Correction
Resolved
06/03/2010
USE / OCCUPANCY APPROVAL STATUS SEE TEMPORARY OCCUPANCY
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home