Permit Application Status

B1000093


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B1000093
Building Permit - Commercial
Final Completion
RED SUMMIT FAIR LLC
ALTERATION COMMERCIAL
CONSTRUCT SOUTH INTERIOR CORRIDOR
02/05/2010
02/09/2010
10/30/2010
09/17/2012
Locations
Contacts
PHOENIX BUILDING GROUP, Address:7387 W 162ND ST  
WESTHUES ELECTRIC INC., Address:4813 RAYTOWN RD  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/08/2010 10/29/2010
Correction

Fire Department- 2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenat commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department- A standpipe connection shall be provided at the exterior door to the corridor.
Correction

Fire Department- 2006 IFC 1028.2 Reliability. Required exit accesses, exits or exit discharges shall be continuously maintained free from obstructions or impediments to full instant use in the case of fire or other emergency when the areas served by such exits are occupied. Security devices affecting means of egress shall be subject to approval of the fire code official.
Correction

Fire Department- If the occupant load of the spaces for doors 101 and 102 require the doors to swing in the direction of travel, they will need to be altered.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $30.00 $30.00 Paid 02/09/2010
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Not Ready 02/10/2010
Correction
Corrective Action Required
02/10/2010
READINESS FOR INSPECTION PERMIT DRAWINGS NOT FOUND ON SITE
Rough Framing Inspection - Commercial Request Complete 2/10/2010 2/10/2010 02/10/2010
All Rough Inspection - Commercial Not Ready 02/11/2010
Correction
Corrective Action Required
02/11/2010
READINESS FOR INSPECTION IBC 109.1; ALSO: FRAMING NOT CONFIGURED FOR CONTINUITY OF UL 465 RATED ASSEMBLY; NO APPARENT PROVISION FOR PENETRATION BY PVC (COMBUSTIBLE PIPING) WORK REQUESTED FOR INSP ALREADY COVERED
Rough Framing Inspection - Commercial Request Complete 2/10/2010 2/11/2010 02/11/2010
Miscellaneous Inspection Not Ready 02/12/2010
Correction
Corrective Action Required
02/12/2010
DISCUSSION OF INSPECTION REQUIREMENTS ELI, PHIL, ROBERT JOBSITE 2/12/10
Rated Assembly Inspection Failed 02/24/2010
Correction
Partial Correction
02/24/2010
SUSPENDED TOP OF WALL @ NW CORNER OF SUITE A DO NOT TAPE & MUD UNTIL APPROVED SCREW ALL CONNECTIONS OF SUSPENDED FRAMING
Rough Framing Inspection - Commercial Partial 02/24/2010
Correction
Resolved
02/24/2010
READINESS FOR INSPECTION
Correction
Partial Correction
02/24/2010
WEST WALL OF SUITE A FRAMING AT TOP 30" E FACE OK TO HANG GWB
Rough Framing Inspection - Commercial Request Complete 2/23/2010 2/24/2010 02/24/2010
Rated Assembly Inspection Partial 02/26/2010
Correction
Resolved
02/26/2010
SUSPENDED TOP OF WALL @ NW CORNER OF SUITE A
Correction
Partial Correction
02/26/2010
CORRIDOR WALL GWB AT CORRIDOR FACE -- BOTH WALLS GWB AT PVC PIPE PENETRATIONS SUBJECT TO APPROVAL AFTER PENETRATION VIOLATIONS ARE CORRECTED. SEE ROOF DRAIN PIPING PENETRATING RATED ASSEMBLY. ALL PENETRATION SEALS MUST BE OF APPROVED MATERIAL & METHOD. OPENINGS AT ROOF DECK MUST BE FIRE-SEALED. OK TO TAPE/MUD/FIRE SEAL EXCEPT @ PVC PENETRATIONS
Correction
Corrective Action Required
02/26/2010
GWB AT TENANT FACE OF CORRIDOR WALL 1) SCREW PATTERN NOT 8" x 12" PER UL 2) PATCHING OF GWB CUT-OUTS NOT STUD-TO-STUD 3) UL W-L-2005 TREATMENT OF PVC PIPE PENETRATIONS IN PROGRESS SEE ISSUES BELOW:
All Rough Inspection - Commercial Failed 03/03/2010
Correction
Resolved
03/03/2010
READINESS FOR INSPECTION
Correction
Corrective Action Required
03/03/2010
FRAMING AT DOOR OPENINGS & AT HEADERED STUDS 1) SOME STUDS DISCONTINUOUS ABOVE PIPE/CONDUIT; INSTALL UPPER HEADER + CRIPPLE STUDS TO RECEIVE GWB 2) SCREW ALL STUD FLANGES (INCLUDING CRIPPLE STUDS), EXCEPT AT SLIP TRACK, WITHIN WIDTH OF DOOR OPENINGS. SEE BELOW:
Correction
Corrective Action Required
03/03/2010
DAMAGE TO GWB AT UL RATED WALLS REPAIRS SUBJECT TO APPROVAL. HOLES / OPENINGS DAMAGE AT PENETRATIONS
Rated Assembly Inspection Partial 04/07/2010
Correction
Partial Correction
04/07/2010
GWB AT TENANT FACE OF CORRIDOR WALL AT STE 910A GWB + SEALING OF PENETRATIONS APPROVED; OK TO COVER WHEN READY PORTIONS OF WALL BELOW:
Rated Assembly Inspection Failed 04/29/2010
Correction
Resolved
04/29/2010
CORRIDOR WALL GWB AT CORRIDOR FACE -- BOTH WALLS
Correction
Resolved
04/29/2010
GWB AT TENANT FACE OF CORRIDOR WALL UNIT 910 A
Correction
Corrective Action Required
04/29/2010
SEALING OF GWB PENETRATIONS 1) ROOF JOIST PENETRATIONS NOT SEALED -- SEE AT TOP CHORDS 2) SPRINKLER PIPE PENETRATION NEAR SOUTH END NOT CAULKED 3) WH-1 NOT SURFACE MOUNTED PER DRAWING MEP; RECESS MOUNTING VIOLATES WALL RATING. SEE ISSUES BELOW:
Rough Framing Inspection - Commercial Passed 05/03/2010
Correction
Resolved
05/03/2010
WEST WALL OF SUITE A
Miscellaneous Inspection Passed 05/03/2010
Correction
Resolved
05/03/2010
DISCUSSION OF INSPECTION REQUIREMENTS ELI, PHIL, ROBERT JOBSITE 2/12/10
All Rough Inspection - Commercial Passed 05/03/2010
Correction
Resolved
05/03/2010
FRAMING AT DOOR OPENINGS & AT HEADERED STUDS
Correction
Resolved
05/03/2010
DAMAGE TO GWB AT UL RATED WALLS
Rated Assembly Inspection Passed 05/03/2010
Correction
Resolved
05/03/2010
SEALING OF GWB PENETRATIONS
Final Inspection - Commercial Failed 05/03/2010
Correction
Partial Correction
05/03/2010
CONSTRUCTION OF INTERIOR CORRIDOR NEAR SOUTH END OF BUILDING WH-1 TO BE SURFACE MOUNTED PER DRAWING MEP
Above Ceiling Inspection Passed 9/17/2012 at 12:00 AM 09/17/2012
Final Inspection - Commercial Passed 9/17/2012 at 12:00 AM 09/17/2012
Correction
Resolved
09/17/2012
CONSTRUCTION OF INTERIOR CORRIDOR NEAR SOUTH END OF BUILDING WH-1 TO BE SURFACE MOUNTED PER DRAWING MEP
Documents & Images
Date Uploaded File Type Document Name
09/17/2012 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home