Permit Application Status

B0901174


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0901174
Building Permit - Commercial
Final Completion
RED SUMMIT FAIR LLC
ALTERATION COMMERCIAL
WHITE BOX FINISH, INCLUDES DEMISING WALLS, TWO RESTROOMS, ELECTRICAL SERVICE AND ROOFTOP UNITS.
11/12/2009
12/01/2009
08/30/2010
09/17/2012
Locations
Contacts
MEYER BROTHERS BUILDING COMPANY, Address:200 NE MISSOURI RD  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD  
KLOVER ARCHITECTS, Address:10955 LOWELL AVE  
MEYER BROTHERS BLDG CO, Address:200 NE MISSOURI RD. STE 100  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/17/2010 10/29/2010
Correction

Fire Department- 2006 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Codes Administration - ICC/ANSI A117.1 2003 604.5.1 - Fixed sidewall grab bars. Fixed sidewall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located between 39 inches and 41 inches above the floor, and with the center line of the bar located between 39 inches and 41 inches from the rear wall.
Correction

Codes Administration - The bottom chord braces at the rtu(s) shall be welded once the units have been installed. This will need to be verified by the city inspection staff.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $362.89 $362.89 Paid 12/01/2009
89 Sewer Tap Fees $180.00 $180.00 Paid 12/01/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 12/15/2009
Correction
Resolved
12/15/2009
UNDER-SLAB SANITARY WASTE, SOIL, VENT PIPING OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 1/21/2010 at 12:00 AM 12/15/2009
Correction
Partial Correction
12/15/2009
WALL FRAMING + IN-WALL SYSTEMS EXTERIOR WALLS @ S, E, & W; N-S SECTION OF W SEPARATION WALL; OK TO COVER WHEN READY WALLS LISTED BELOW:
All Rough Inspection - Commercial Passed 12/17/2009
Correction
Resolved
12/17/2009
WALL FRAMING + IN-WALL SYSTEMS EXTERIOR WALLS @ S, E, & W; SEPARATION WALL @ W & N OK TO COVER WHEN READY WALLS LISTED BELOW:
Miscellaneous Inspection Partial 12/18/2009
Correction
Partial Correction
12/18/2009
CUSTOMER SERVICE VISIT(S) TO DISCUSS QUESTIONS
All Rough Inspection - Commercial Passed 12/23/2009
Correction
Resolved
12/23/2009
WALL FRAMING + IN-WALL SYSTEMS EXTERIOR WALLS; SEPARATION WALL; INTERIOR WALLS; RESTROOM CEILINGS; COLUMN BOX-OUTS OK TO COVER WHEN READY WALLS LISTED BELOW:
Electrical Service Inspection Passed 01/21/2010
Correction
Resolved
01/21/2010
ELECTRICAL SERVICE INSTALLATION RELEASE SERVICE 400 AMPS / TRANSFORMER SEPARATELY DERIVED SYSTEM
Above Ceiling Inspection Partial 01/21/2010
Correction
Partial Correction
01/21/2010
PERIMETER INSPECTION FOR BORDER TILE OK FOR BORDER CUTS + TILE FOR DEVICE MOUNTING
Gas Service Inspection - Commercial Passed 01/21/2010
Correction
Resolved
01/21/2010
GAS PIPING PRESSURE TEST RELEASE GAS SERVICE PRESSURE HELD STEADY AT >= 10 PSI FOR >=10 MIN
Gas Piping Inspection - Commercial Partial 01/21/2010
Correction
Partial Correction
01/21/2010
ROOFTOP GAS PIPING YET TO BE PAINTED BEFORE FINAL INSPECTION
Above Ceiling Inspection Passed 01/22/2010
Correction
Resolved
01/22/2010
PERIMETER INSPECTION FOR BORDER TILE
Correction
Resolved
01/22/2010
COMPLETE CEILING AREA OK TO COVER WHEN READY AFTER TEMP WIRING REMOVED
Final Inspection - Commercial Failed 03/02/2010
Correction
Corrective Action Required
03/02/2010
REMOVAL OF DEBRIS FROM ROOFTOP DEBRIS / UNUSED MATERIALS EXPECIALLY METALS
Correction
Corrective Action Required
03/02/2010
/EXPOSED / UNTERMINATED ELECTRICAL WIRE JB @ PARAPET @ NE CORNER
Correction
Corrective Action Required
03/02/2010
NUMBERING OF RTU's DESIGNATE SUITE + RTU #
Correction
Corrective Action Required
03/02/2010
ELECTRICAL RECEPTACLE @ RTU NOT HOT FOR TEST + LACKS IN-USE COVER
Correction
Resolved
03/02/2010
Receive Fire Department approval OK PER CPT JOE DIR 3/2/10
Correction
Corrective Action Required
03/02/2010
LABELING OF ELECTRICAL SERVICE PANEL FRONTS LABEL PANEL LP LABEL PANEL HP
Correction
Corrective Action Required
03/02/2010
LABELING OF ELECTRICAL CIRCUIT BREAKER POSITIONS PANEL HP LABEL ALL POSITIONS
Miscellaneous Inspection Passed 03/02/2010
Correction
Resolved
03/02/2010
CUSTOMER SERVICE VISIT(S) TO DISCUSS QUESTIONS
Gas Piping Inspection - Commercial Passed 03/02/2010
Correction
Resolved
03/02/2010
ROOFTOP GAS PIPING
Final Inspection - Commercial Passed 9/17/2012 at 12:00 AM 09/17/2012
Correction
Resolved
09/17/2012
LABELING OF ELECTRICAL CIRCUIT BREAKER POSITIONS PANEL HP LABEL ALL POSITIONS
Correction
Resolved
09/17/2012
LABELING OF ELECTRICAL SERVICE PANEL FRONTS LABEL PANEL LP LABEL PANEL HP
Correction
Resolved
09/17/2012
ELECTRICAL RECEPTACLE @ RTU NOT HOT FOR TEST + LACKS IN-USE COVER
Correction
Resolved
09/17/2012
NUMBERING OF RTU's DESIGNATE SUITE + RTU #
Correction
Resolved
09/17/2012
/EXPOSED / UNTERMINATED ELECTRICAL WIRE JB @ PARAPET @ NE CORNER
Correction
Resolved
09/17/2012
REMOVAL OF DEBRIS FROM ROOFTOP DEBRIS / UNUSED MATERIALS EXPECIALLY METALS
Documents & Images
Date Uploaded File Type Document Name
09/17/2012 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home