Permit Application Status

B0901131


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0901131
Building Permit - Commercial
Final Completion
JHE FOSTER LLC
PARTIAL COMMERCIAL
FOUNDATION ONLY PERMIT
11/03/2009
11/03/2009
05/02/2010
11/25/2009
Locations
Contacts
JAKES REFRIGERATION HTG/COOLING, Address:1101 SW 1ST ST  
NORTON & SCHMIDT, Address:311 E 11TH AVENUE  
J & N UTILITIES, Address:PO BOX 1284  
SHUKLA AND ASSOCIATES, Address:3693 W 129TH PLACE  
SHUKLA AND ASSOCIATES, Address:3693 W 129TH PLACE  
A & A ELECTRICAL, INC, Address:PO BOX 576  
JHE FOSTER LLC, Address:4411 NE GEORGIAN DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/02/2010 10/29/2010
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Codes Administration - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $78.30 $78.30 Paid 11/03/2009
84 Water Meters $334.18 $334.18 Paid 11/11/2009
85 Water Taps $7,752.00 $7,752.00 Paid 11/11/2009
89 Sewer Tap Fees $480.00 $480.00 Paid 11/11/2009
Right of Way Permit $60.00 $60.00 Paid 11/11/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Not Ready 11/11/2009
Correction
Corrective Action Required
11/11/2009
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS
Correction
Corrective Action Required
11/11/2009
PREPARATION TO POUR GRADE BEAM + INTEGRAL COLUMN FOOTINGS
Footing Inspection - Commercial Partial 11/11/2009
Correction
Partial Correction
11/11/2009
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS (B)/(3.1); (B)/(2); OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
Correction
Partial Correction
11/11/2009
PREPARATION TO POUR GRADE BEAM + INTEGRAL COLUMN FOOTINGS (4)/(B.5) TO (4)/(B) TO (5)/(B) TO (5)/(C) TO (1)/(C) TO (1)/(B.4); TRASH ENCLOSURE + (1)/(B.4) TO (1)/(A) TO (A)/(1.7); OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Passed 11/12/2009
Correction
Resolved
11/12/2009
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS ALL COMPLETE OK TO POUR WHEN READY
Correction
Resolved
11/12/2009
PREPARATION TO POUR GRADE BEAM + INTEGRAL COLUMN FOOTINGS COMPLETE PERIMETER OK TO POUR WHEN READY
Foundation Inspection - Commercial Passed 11/19/2009
Correction
Resolved
11/19/2009
PREP TO POUR FOUNDATION WALL OK TO POUR WHEN READY AT EAST WALL INCLUDING STAIRWELL
Water Service Inspection Passed 11/23/2009
Correction
Resolved
11/23/2009
WATER SERVICE INSTALLATION OK TO COVER WHEN READY METER / WELL / TAP + SVC LINE TO BLDG ENTRY
Final Inspection - Commercial Passed 11/24/2009
Correction
Resolved
11/24/2009
CLOSE PERMIT
Sewer Service Inspection Passed 11/24/2009
Correction
Resolved
11/24/2009
SANITARY SEWER SERVICE INSTALLATION OK TO COVER WHEN READY FROM BUILDING ENTRY TO CONNECTION AT STUB
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home