Permit Application Status

B0901105


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0901105
Building Permit - Commercial
Final Completion
RED SUMMIT FAIR LLC
ALTERATION COMMERCIAL
INSTALL STOREFRONT SYSTEMS AND MISC ELECTRICAL, PLUMBING AND 1500 GREASE INTERCEPTOR.
10/27/2009
11/23/2009
08/17/2010
03/01/2012
Locations
Contacts
PHOENIX BUILDING GROUP, Address:7387 W 162ND ST  
WESTHUES ELECTRIC INC., Address:4813 RAYTOWN RD  
ACCURATE MECHANICAL LLC, Address:1237 ATLANTIC  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/02/2010 10/29/2010
Correction

Fire Department- 2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenat commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $164.95 $164.95 Paid 11/23/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 12/08/2009
Correction
Partial Correction
12/08/2009
UNDER-SLAB GREASE WASTE PIPING SANITARY WASTE PIPING NOT SHOWN ON DRAWING; NOT APPROVED TO COVER. PER DRAWING PE1 OK TO COVER WHEN READY
Underslab Plumbing Inspection - Commercial Partial 01/28/2010
Correction
Resolved
01/28/2010
UNDER-SLAB GREASE WASTE PIPING PER DRAWING PE1 OK TO COVER WHEN READY
Correction
Resolved
01/28/2010
SANITARY WASTE PIPING OK TO COVER WHEN READY FROM INTERCEPTOR LOCATION TO CONN @EXSTG BLDG DRAIN
Correction
Corrective Action Required
01/28/2010
INSTALLATION & PIPING OF GREASE INTERCEPTOR SUBJECT TO APPROVAL WHEN INSTALLED
Underground Plumbing Inspection - Commercial Passed 02/17/2010
Correction
Resolved
02/17/2010
GREASE TANK APPROVED TO COVER GREASE TRAP
Underslab Plumbing Inspection - Commercial Passed 3/1/2012 at 12:00 AM 03/01/2012
Correction
Resolved
03/01/2012
INSTALLATION & PIPING OF GREASE INTERCEPTOR SUBJECT TO APPROVAL WHEN INSTALLED
Final Inspection - Commercial Passed 3/1/2012 at 12:00 AM 03/01/2012
Documents & Images
Date Uploaded File Type Document Name
03/01/2012 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home