Permit Application Status

B0901012


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0901012
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS TO AN EXISTING MEDICAL OFFICE TENANT SPACE
10/05/2009
11/05/2009
05/04/2010
03/31/2010
Locations
Contacts
J E DUNN CONSTRUCTION, Address:929 HOLMES RD  
GUY GRONBERG ARCHITECTS, PC, Address:113 SE 3RD ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/12/2010 10/29/2010
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied.
Correction

Fire Department - 2006 IFC 1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $593.82 $593.82 Paid 11/05/2009
89 Sewer Tap Fees $120.00 $120.00 Paid 11/05/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 11/19/2009
Correction
Partial Correction
11/19/2009
WALL FRAMING + IN-WALL SYSTEMS PHASE 1: 10; 24; 25A; 25B; 26A; 26B; 26C OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 11/23/2009
Correction
Partial Correction
11/23/2009
WALL FRAMING + IN-WALL SYSTEMS PHASE 1: 10; 24; 25A; 25B; 26A; 26B; 26C; 08 WEST WALL OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Partial 12/08/2009
Correction
Partial Correction
12/08/2009
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS PHASE 1 SPACES; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Occupancy Inspection - Codes Commercial Partial 12/18/2009
Correction
Partial Correction
12/18/2009
USE/OCCUPANCY OF PHASED RENOVATION PROGRAM PHASE 1 AREA; AREA(S) LISTED BELOW OK FOR USE/OCCUPANCY:
All Rough Inspection - Commercial Partial 01/06/2010
Correction
Partial Correction
01/06/2010
WALL FRAMING + IN-WALL SYSTEMS PHASE I: 10; 24; 25A; 25B; 26A; 26B; 26C; 08 WEST WALL PHASE II: 74; 75 S,E,N; 85; 86; 87; 88; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Failed 01/20/2010
Correction
Partial Correction
01/20/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS PHASE I SPACES; PHASE II SPACES NOT APPROVED TO COVER: 1) REMOVE OR CUT BACK ABANDONED HANGER STRAPS/WIRES 2) RESTORE SPRAY-ON FIREPROOFING TO S/S WHERE MISSING 3) RUN LOW-VOLTAGE CABLE >=18" ABOVE GRID OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 01/21/2010
Correction
Partial Correction
01/21/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS PHASE I SPACES; PHASE II SPACES EXCLUDING 52B; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
All Rough Inspection - Commercial Partial 01/21/2010
Correction
Partial Correction
01/21/2010
WALL FRAMING + IN-WALL SYSTEMS PHASE I; PHASE II: 74; 75 S,E,N; 85; 86; 87; 88; 52B/46; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 01/28/2010
Correction
Partial Correction
01/28/2010
WALL FRAMING + IN-WALL SYSTEMS PHASE I; PHASE II: 74; 75 S,E,N; 85; 86; 87; 88; 52B/46; 13 EAST; 18 SOUTHEAST OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Partial 01/28/2010
Correction
Partial Correction
01/28/2010
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS SOFFIT @ 13 EAST; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
All Rough Inspection - Commercial Partial 02/02/2010
Correction
Partial Correction
02/02/2010
WALL FRAMING + IN-WALL SYSTEMS PHASE I; PHASE II: 74; 75 S,E,N; 85; 86; 87; 88; 52B/46; PHASE III: 84 S&W; 13 EAST; 18 SOUTHEAST; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Occupancy Inspection - Codes Commercial Partial 02/03/2010
Correction
Partial Correction
02/03/2010
USE/OCCUPANCY OF PHASED RENOVATION PROGRAM PHASE I AREA; PHASE II AREA; AREA(S) LISTED BELOW OK FOR USE/OCCUPANCY:
Correction
Partial Correction
02/03/2010
Receive Fire Department approval PHASE I AREA; PHASE II AREA; FOLLOWING AREAS APPROVED BY F.D. FOR USE
Above Ceiling Inspection Partial 02/11/2010
Correction
Partial Correction
02/11/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS PHASE I SPACES; PHASE II SPACES EXCLUDING 52B; 13, 18, 52B OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
All Rough Inspection - Commercial Partial 02/16/2010
Correction
Partial Correction
02/16/2010
WALL FRAMING + IN-WALL SYSTEMS PHASE I; PHASE II: 74; 75 S,E,N; 85; 86; 87; 88; 52B/46; PHASE III: 84 S&W; EXAM ROOMS 1, 7, DOC OFFICE 13 EAST; 18 SOUTHEAST; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Passed 03/01/2010
Correction
Resolved
03/01/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS PHASE I SPACES; PHASE II SPACES; PHASE III SPACES 20, 21A, 21B, 31, WORK STATION RECESS @ CORR 45 OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Correction
Resolved
03/01/2010
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS
All Rough Inspection - Commercial Passed 03/01/2010
Correction
Resolved
03/01/2010
WALL FRAMING + IN-WALL SYSTEMS
Occupancy Inspection - Codes Commercial Partial 03/09/2010
Correction
Partial Correction
03/09/2010
USE/OCCUPANCY OF PHASED RENOVATION PROGRAM PHASE I AREA; PHASE II AREA; PHASE III AREA AREA(S) LISTED BELOW OK FOR USE/OCCUPANCY:
Correction
Partial Correction
03/09/2010
Receive Fire Department approval PHASE I AREA; PHASE II AREA; PHASE III AREA FOLLOWING AREAS APPROVED BY F.D. FOR USE
All Rough Inspection - Commercial Passed 03/17/2010
Correction
Resolved
03/17/2010
WALL FRAMING + IN-WALL SYSTEMS ALL INCLUDING NEW/REVISED FRAMING FOR DOOR ADDED AT CORRIDOR 10 SOUTH END
Rough Framing Inspection - Commercial Request Complete 3/16/2010 3/17/2010 03/17/2010
Occupancy Inspection - Codes Commercial Passed 03/30/2010
Correction
Resolved
03/30/2010
USE/OCCUPANCY OF PHASED RENOVATION PROGRAM ALL AREAS OK FOR USE / OCCUPANCY
Correction
Resolved
03/30/2010
Receive Fire Department approval PER CPT JOE DIR 3/30/2010
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home