Permit Application Status

B0900866


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0900866
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW TENANT FINISH
SAINT LUKES 4TH FLOOR SOUTH IN-FILL
09/01/2009
10/13/2009
02/08/2011
08/18/2010
Locations
Contacts
ACI BOLAND, Address:11229 NALL SUITE 140  
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
J.E. DUNN CONSTRUCTION. INC, Address:1570 NE DOUGLAS RD  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/31/2010 10/29/2010
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department: Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators, and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Documentation shall be provided of the pressure test of at least 150 psi for a minimum of 24 hours on installers letterhead.
Correction

Codes Administration - ICC/ANSI A117.1 2003 804.6.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer compartment shelves, including the bottom of the freezer, 54 inches maximum above the floor when the shelves are installed at the maximum heights possible in the compartment. A clear floor space, positioned for a parallel approach to the space dedicated to a refrigerator/freezer, shall be provided. The centerline of the clear floor space shall be offset 24 inches maximum from the centerline of the dedicated space.
Correction

Codes Administration - 2006 IBC 1011.1 - Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in a corridor is more than 100 feet or the the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign.
Correction

Codes Administration - 2006 IBC 1109.4 - Kitchens and kitchenettes. Where kitchens and kitchenettes are provided in accessible spaces or rooms, they shall be accessible in accordance with ICC A117.1.
Correction

Codes Administration - 2006 IBC 1109.12.1 - Dressing, fitting and locker rooms. Where dressing rooms, fitting rooms or locker rooms are provided, at least 5 percent, but not less than one, of each type of use in each cluster shall be accessible.
Correction

Codes Administration - The exterior flue A5.0 will have to be approved by Planning and Development for UDO requirements.
Correction

Fire Department- 2006 IFC 1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $32,090.80 $32,090.80 Paid 10/13/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 10/14/2009
Correction
Partial Correction
10/14/2009
2' GWB TOP-OUT AT CORRIDOR SMOKE WALLS CORRIDOR 081 E & W WALLS CORRIDOR FACES; OK TO TOP-OUT WHEN READY WALLS DESCRIBED BELOW:
Rated Assembly Inspection Partial 10/14/2009
Correction
Partial Correction
10/14/2009
INFILL & FIRE PROTECTION @ EXISTING SLAB OPENINGS FRAMING @ 3 OPENINGS @ (3.2)/(B.2); OK TO COVER WHEN READY COMPONENT DESCRIBED BELOW
Rated Assembly Inspection Partial 10/20/2009
Correction
Partial Correction
10/20/2009
INFILL & FIRE PROTECTION @ EXISTING SLAB OPENINGS FRAMING @ 3 OPENINGS @ (3.2)/(B.2); FRAMING @ 1 OPENING @ (5.1)/(B.3); OK TO APPLY, TAPE, & MUD GWB OK TO COVER WHEN READY COMPONENT DESCRIBED BELOW
All Rough Inspection - Commercial Partial 10/20/2009
Correction
Partial Correction
10/20/2009
2' GWB TOP-OUT AT CORRIDOR SMOKE WALLS CORRIDOR 081 E & W WALLS CORRIDOR FACES; CORRIDOR 102 E & W WALLS CORRIDOR FACES; TOP-OUT DOWN TO 10' A.F.F. OK TO TOP-OUT WHEN READY WALLS DESCRIBED BELOW:
Rated Assembly Inspection Partial 10/22/2009
Correction
Resolved
10/22/2009
INFILL & FIRE PROTECTION @ EXISTING SLAB OPENINGS FRAMING @ 3 OPENINGS @ (3.2)/(B.2); FRAMING @ 1 OPENING @ (5.1)/(B.3) OK TO COVER WHEN READY COMPONENT DESCRIBED BELOW
Correction
Partial Correction
10/22/2009
GWB AT UL RATED WALLS TOP-OUT DOWN TO 10' A.F.F.: ON (C) FROM (1.3) TO (1.6) + FROM (2) TO (2.3); (C.3)/(5.5) TO (C.3)/(5.4) TO (C)/(5.4); OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
Rated Assembly Inspection Partial 10/26/2009
Correction
Partial Correction
10/26/2009
GWB AT UL RATED WALLS TOP-OUT DOWN TO 10' A.F.F.: ON (C) FROM (1.3) TO (1.6) + FROM (2) TO (2.3); (C.3)/(5.5) TO (C.3)/(5.4) TO (C)/(5.4); GWB @ 4A087 W WALL E FACE; OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
All Rough Inspection - Commercial Partial 10/26/2009
Correction
Partial Correction
10/26/2009
2' GWB TOP-OUT AT CORRIDOR SMOKE WALLS CORRIDOR 081 E & W WALLS CORRIDOR FACES; CORRIDOR 102 E & W WALLS CORRIDOR FACES; ALL BA SEPERATION WALLS*; 077 + 107 S WALLS; TOP-OUT DOWN TO 10' A.F.F. (OR 11'-2"*) OK TO TOP-OUT WHEN READY WALLS DESCRIBED BELOW:
Rated Assembly Inspection Partial 10/28/2009
Correction
Partial Correction
10/28/2009
GWB AT UL RATED WALLS TOP-OUT DOWN TO 10' A.F.F.: ON (C) FROM (1.3) TO (1.6) + FROM (2) TO (2.3); (C.3)/(5.5) TO (C.3)/(5.4) TO (C)/(5.4); 4A087 W WALL E FACE; GWB @ 077 + 107 S WALL S FACE; OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
All Rough Inspection - Commercial Partial 11/10/2009
Correction
Partial Correction
11/10/2009
2' GWB TOP-OUT AT CORRIDOR SMOKE WALLS CORR 081 E & W WALLS CORR FACES; CORR 102 E & W WALLS CORR FACES; ALL BA SEPERATION WALLS*; 077 + 107 S WALLS; (B)-(C) x (1)-(7) EXCLUDING NURSE STATION SOFFITS, MECHANICAL SHAFTS, 105, 080, 075, 085; TOP-OUT DOWN TO 10' A.F.F. (OR 11'-2"*) OK TO TOP-OUT WHEN READY WALLS DESCRIBED BELOW:
All Rough Inspection - Commercial Partial 11/23/2009
Correction
Resolved
11/23/2009
2' GWB TOP-OUT AT CORRIDOR SMOKE WALLS CORR 081 E & W WALLS CORR FACES; CORR 102 E & W WALLS CORR FACES; ALL BA SEPERATION WALLS*; 077 + 107 S WALLS; (B)-(C) x (1)-(7) EXCL NURSE STATION SOFFITS, MECHANICAL SHAFTS, 105, 080, 075, 085; TOP-OUT DOWN TO 10' A.F.F. (OR 11'-2"*) OK TO TOP-OUT WHEN READY WALLS DESCRIBED BELOW:
Correction
Partial Correction
11/23/2009
WALL FRAMING + IN-WALL SYSTEMS CORR 081 WEST WALL; CORR 102 WEST WALL; ROOMS 015-020; 011-014; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 12/03/2009
Correction
Partial Correction
12/03/2009
WALL FRAMING + IN-WALL SYSTEMS CORR 081 FROM (1) TO (6.5); CORR 102 FROM (1) TO (5.5); CORR BULKHEADS @ DOOR #s 000A & 000B; SPACES 015A-023A; 011A-004A; S03A; 077; 078; 080; 082; 082A; 083; 084; 085; 086; 087; 089; 093; 095; 096; 097; 101; 105; 106 107; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 12/10/2009
Correction
Partial Correction
12/10/2009
WALL FRAMING + IN-WALL SYSTEMS CORR 081 FROM (1) TO (6.5); CORR 102 FROM (1) TO (5.5); CORR BULKHEADS @ DOOR #s 000A & 000B; SPACES 015A-023A; 011A-004A; S03A; 077; 078; 080; 082; 082A; 083; 084; 085; 086; 087; 089; 093; 095; 096; 097; 101; 105; 106 107; CRASH CART RECESS @ (B)/(4.6); OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Partial Correction
12/10/2009
IN-WALL ROUGH @ SMOKE WALL TOP-OUT DOWN TO ~10' A.F.F. ON (C) FROM (1.3) TO (1.6) + FROM (2) TO (2.3); (C.3)/(5.5) TO (C.3)/(5.4) TO (C)/(5.4); 4A087 W WALL E FACE; GWB @ 077 + 107 S WALL S FACE; (C)/(8) TO (C)/(8.7) TO (C.7)/(8.7);
Rated Assembly Inspection Partial 12/10/2009
Correction
Partial Correction
12/10/2009
GWB AT UL RATED WALLS S03A 4 WALLS 1ST LAYER; 095 ONE LAYER 4 WALLS OK TO TAPE&MUD; 093 N WALL ONE LAYER + E WALL 1ST LAYER; OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
Above Ceiling Inspection Partial 12/10/2009
Correction
Partial Correction
12/10/2009
FRAMING & M/E/P SYSTEMS AT SUSPENDED GWB SOFFITS TOPS OF TENSION STUDS YET TO BE FULLY-SCREWED SUBJECT TO APPROVAL AT ADJACENT ACT ABOVE-CEILING INSPECTION. OK TO COVER WHEN READY NURSE STATIONS 075 & 085
Rated Assembly Inspection Partial 12/11/2009
Correction
Partial Correction
12/11/2009
GWB AT UL RATED WALLS S03A 4 WALLS TWO LAYERS; 095 ONE LAYER 4 WALLS OK TO TAPE&MUD; 093 COMPLETE OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
All Rough Inspection - Commercial Partial 12/15/2009
Correction
Resolved
12/15/2009
WALL FRAMING + IN-WALL SYSTEMS CORR 081 FROM (1) TO (6.5); CORR 102 FROM (1) TO (5.5); CORR BULKHEADS @DOOR #s 000A & 000B; SPACES 015A-023A; 011A-004A; S03A; 077; 078; 080; 082; 082A; 083; 084; 085; 086; 087; 089; 093; 095; 096; 097; 101; 105; 106 107; CART RECESS @ (B)/(4.6); CONT'D OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Resolved
12/15/2009
IN-WALL ROUGH @ SMOKE WALL TOP-OUT DOWN TO ~10' A.F.F.
Correction
Partial Correction
12/15/2009
WALL FRAMING + IN-WALL SYSTEMS, CONT'D CORRIDORS 081 & 102 COMPLETE; 024A-030A; 117; 118; 119; 074-077; 107; 112; 002; 003; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 12/21/2009
Correction
Partial Correction
12/21/2009
WALL FRAMING + IN-WALL SYSTEMS, CONT'D CORRIDORS 081 & 102 COMPLETE; 024A-030A; 117; 118; 119; 074-077; 107; 112; 002; 003; 070 E WALL; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 12/23/2009
Correction
Partial Correction
12/23/2009
GWB AT UL RATED WALLS S03A 4 WALLS TWO LAYERS; 095 ONE LAYER 4 WALLS OK TO TAPE&MUD; 093; 077; 107; OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
All Rough Inspection - Commercial Partial 12/30/2009
Correction
Partial Correction
12/30/2009
WALL FRAMING + IN-WALL SYSTEMS, CONT'D CORRIDORS 081 & 102 COMPLETE; 024A-030A; 117; 118; 119; 074-077; 107; 112; 002; 003; 070 E WALL; 114; 116; 070A; 001; 001A&B OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 01/08/2010
Correction
Partial Correction
01/08/2010
GWB AT UL RATED WALLS S03A 4 WALLS TWO LAYERS; 095 ONE LAYER 4 WALLS OK TO TAPE&MUD; 093; 077; 107; 118 E,S*,W* WALLS; *: INCL OPPOSITE FACE OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
Above Ceiling Inspection Partial 01/11/2010
Correction
Partial Correction
01/11/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS BORDERS ABOVE CABINETS TO BE INSTALLED @ PATIENT ROOMS 008-014; 015-020; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Rated Assembly Inspection Partial 01/13/2010
Above Ceiling Inspection Partial 01/15/2010
Correction
Resolved
01/15/2010
FRAMING & M/E/P SYSTEMS AT SUSPENDED GWB SOFFITS
Correction
Partial Correction
01/15/2010
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS PATIENT ROOM SHOWERS EXCEPT 018; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Rated Assembly Inspection Partial 01/15/2010
Correction
Partial Correction
01/15/2010
GWB AT UL RATED WALLS S03A 4 WALLS TWO LAYERS; 095 ONE LAYER 4 WALLS OK TO TAPE&MUD; 093; 077; 107; 118 E,S*,W* WALLS; 116* *: INCL OPPOSITE FACE OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
Above Ceiling Inspection Partial 01/19/2010
Correction
Partial Correction
01/19/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS BORDERS ABOVE CABINETS TO BE INSTALLED @ PATIENT ROOMS 008-014; 015-020; CEILINGS COMPLETE @: 004-009; 015-020; 083; 101; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 01/20/2010
Correction
Partial Correction
01/20/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS BORDERS ABOVE CABINETS TO BE INSTALLED @ PATIENT ROOMS 008-014; 015-020; CEILINGS COMPLETE @: 004-009; 015-020; 083; 101; S03A; 086; 089; 095; 097; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Rated Assembly Inspection Partial 01/20/2010
Correction
Resolved
01/20/2010
INFILL & FIRE PROTECTION @ EXISTING SLAB OPENINGS FRAMING @ 3 OPENINGS @ (3.2)/(B.2); FRAMING @ 1 OPENING @ (5.1)/(B.3) SHEET METAL + FRAMING + 2 LAYERS 5/8" TYPE X GWB ABOVE SPACE 070 OK TO COVER WHEN READY COMPONENT DESCRIBED BELOW
Above Ceiling Inspection Partial 01/22/2010
Correction
Partial Correction
01/22/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS BORDERS ABOVE CABINETS TO BE INSTALLED @ PATIENT ROOMS 003-007; 008-014; 015-020; 21; 23-25; CEILINGS COMPLETE @: 004-009; 015-020; 083; 101; S03A; 086; 089; 095; 097; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 01/25/2010
Correction
Partial Correction
01/25/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS BORDERS ABOVE CABINETS TO BE INSTALLED @ PATIENT ROOMS 003-007; 008-014; 015-020; 21; 23-25; CEILINGS COMPLETE @: 004-009; 015-020; 083; 101; S03A; 086; 089; 095; 097; 003-007; 021; 023-025; 076; 077; 080; 082; 082A; 105; 106; 107; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 01/27/2010
Correction
Partial Correction
01/27/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS BORDERS ABOVE CABINETS TO BE INSTALLED @ PATIENT ROOMS 003-21; 23-25; 26-28; CEILINGS COMPLETE @: S03A; 003-009; 015-021; 023-025; 076; 077; 080; 082; 082A; 083;086; 089; 095; 097;101; 105-107; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 02/08/2010
Correction
Partial Correction
02/08/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS S03A; 003-009; 015-021; 023-025; 076-077; 080; 082; 082A; 083;086; 089; 095; 097;101; 105-107; 001B; 002A; 021A; 022; 076; 112; 026A; 027; 027A; 028; 029A; 030; 030A; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
All Rough Inspection - Commercial Partial 02/16/2010
Correction
Partial Correction
02/16/2010
WALL FRAMING + IN-WALL SYSTEMS, CONT'D CORRIDORS 081 & 102 COMPLETE; 024A-030A; 117; 118; 119; 074-077; 107; 112; 002; 003; 070 E WALL; 114; 116; 070A; 001; 001A&B IN WALL: LOBBY & WAITING ROOM AREAS APPROVED. OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 02/22/2010
Correction
Partial Correction
02/22/2010
GWB AT UL RATED WALLS S03A 4 WALLS TWO LAYERS; 095 ONE LAYER 4 WALLS OK TO TAPE&MUD; 093; 077; 107; 118 E, S*,W* WALLS; 116*; 119 W WALL; *: INCL OPPOSITE FACE OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
Above Ceiling Inspection Partial 02/22/2010
Correction
Partial Correction
02/22/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS S03A; 003-009; 015-021; 023-025; 076-077; 080; 082; 082A; 083;086; 089; 095; 097;101; 105-107; 001; 002; 022; 026; 027; 028; 029; 030; 074; 075; 076A; 078; 081 N TO (7.5)*; 084; 085; 096; 102 N TO (8.5)**; 112; 114; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 03/01/2010
Correction
Partial Correction
03/01/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS S03A; 001-009; 015-030; 074-078; 076A; 080; 081 N TO (7.5); 082; 082A; 083-086; 089; 095-097;101; 102 N TO (8.5); 105-107; 112; 114; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 03/18/2010
Correction
Partial Correction
03/18/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS S03A; 000A; 001-009; 015-030; 061; 061A; 062; 074-078; 076A; 080; 081 N TO (7.5); 082; 082A; 083-086; 089; 095-097;101; 102 N TO (8.5); 105-107; 112; 114; CORR TO 117; 119; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 03/18/2010
All Rough Inspection - Commercial Partial 03/31/2010
Correction
Partial Correction
03/31/2010
WALL FRAMING + IN-WALL SYSTEMS, CONT'D CORRIDORS 081 & 102 COMPLETE; 024A-030A; 117; 118; 119; 074-077; 107; 112; 002; 003; 070 E WALL; 114; 116; 070A; 001; 001A&B; 018 IN WALL: LOBBY & WAITING ROOM AREAS APPROVED. OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Corrective Action Required
03/31/2010
WALL FRAMING + IN-WALL SYSTEMS @ ROOM 4A 018A 1) FRAMING INCOMPLETE @ UPPER NE CORNER -- SUPPORT GWB 2) NE CORNER STUD NOTCHED -- NEEDS REINFORCEMENT 3) SEGMENTED 2" C.I. PLUMBING VENT LINE @ E WALL UNSTABLE -- NEEDS LATERAL SUPPORT ISSUES BELOW
All Rough Inspection - Commercial Passed 04/02/2010
Correction
Resolved
04/02/2010
WALL FRAMING + IN-WALL SYSTEMS, CONT'D LOBBY & WAITING ROOM AREAS; CORRIDORS 081 & 102 COMPLETE; 024A-030A; 117; 118; 119; 074-077; 107; 112; 002; 003; 070 E WALL; 114; 116; 070A; 001; 001A&B; 018; 018A OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Resolved
04/02/2010
WALL FRAMING + IN-WALL SYSTEMS @ ROOM 4A 018A
Occupancy Inspection - Codes Commercial Not Ready 04/13/2010
Correction
Corrective Action Required
04/13/2010
Receive Fire Department approval
Rated Assembly Inspection Passed 04/13/2010
Correction
Resolved
04/13/2010
GWB AT UL RATED WALLS S03A 4 WALLS TWO LAYERS; 095 ONE LAYER 4 WALLS OK TO TAPE&MUD; 093; 077; 107; 118 E, S*,W* WALLS; 116*; 119 W WALL; *: INCL OPPOSITE FACE OK TO COVER WHEN READY SPACES/WALLS LISTED BELOW
Above Ceiling Inspection Passed 04/13/2010
Correction
Resolved
04/13/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS S03A; 000A; 001-009; 015-030; 061; 061A; 062; 074-078; 076A; 080; 081 N TO (7.5); 082; 082A; 083-086; 089; 095-097;101; 102 N TO (8.5); 105-107; 112; 114; CORR TO 117; 119; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Correction
Resolved
04/13/2010
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS OK TO COVER WHEN READY
Miscellaneous Inspection Partial 04/14/2010
Correction
Partial Correction
04/14/2010
PRE-FINAL OBSERVATIONS
Above Ceiling Inspection Passed 04/21/2010
Correction
Resolved
04/21/2010
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS ALL INCLUDING 4A018/018A OK TO COVER WHEN READY
Correction
Resolved
04/21/2010
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS
Occupancy Inspection - Codes Commercial Partial 04/27/2010
Correction
Partial Correction
04/27/2010
Receive Fire Department approval 4A061; 061A; 062; 117; 118; 119; OCCUPANCY PER CPT JOE DIR OK @ FOLLOWING SPACES:
Correction
Partial Correction
04/27/2010
PHASED OCCUPANCY OF 4TH FLOOR SOUTH FINISH 4A061; 061A; 062; 117; 118; 119; OK FOR USE/OCCUPANCY AT FOLLOWING SPACES:
Occupancy Inspection - Codes Commercial Partial 05/28/2010
Correction
Partial Correction
05/28/2010
PHASED OCCUPANCY OF 4TH FLOOR SOUTH FINISH 4A061; 061A; 062; 117; 118; 119; REMAINING AREA OK TO SET UP FOR BUSINESS WHEN APPROVED BY L.S. FIRE DEPARTMENT. NO PATIENTS BEFORE APPROVAL. CODES ADMINISTRATION INSPECTION IS ON-GOING. OK FOR USE/OCCUPANCY AT FOLLOWING SPACES:
Occupancy Inspection - Codes Commercial Partial 08/09/2010
Occupancy Inspection - Codes Commercial Partial 08/10/2010
Occupancy Inspection - Codes Commercial Partial 08/11/2010
Occupancy Inspection - Codes Commercial Partial 08/12/2010
Correction
Partial Correction
08/12/2010
PHASED OCCUPANCY OF 4TH FLOOR SOUTH FINISH 4A061; 061A; 062; 117; 118; 119; REMAINING AREA OF 4TH FLOOR SOUTH OK FOR OCCPANCY WHEN APPROVED BY L.S FIRE DEPT OK FOR USE/OCCUPANCY AT FOLLOWING SPACES:
Occupancy Inspection - Codes Commercial Passed 08/17/2010
Correction
Resolved
08/17/2010
Receive Fire Department approval PER CPT JOE DIR 8/13/2010
Correction
Resolved
08/17/2010
PHASED OCCUPANCY OF 4TH FLOOR SOUTH FINISH
Correction
Resolved
08/17/2010
CODES ADMINISTRATION FINAL INSPECTION NO ISSUES REMAINING
Miscellaneous Inspection Passed 08/17/2010
Correction
Resolved
08/17/2010
PRE-FINAL OBSERVATIONS
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home