Permit Application Status

B0900814


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0900814
Building Permit - Commercial
Final Completion
RED SUMMIT FAIR LLC
ALTERATION COMMERCIAL
WHITE BOX FINISH - DEMISING WALL, R/T/U'S, STOREFRONT, ELECTRIC SERVICE AND MISC ELECTRICAL
08/19/2009
09/29/2009
05/22/2010
11/30/2009
Locations
Contacts
BC ENGINEERS INC, Address:5720 REEDER  
MEYER BROTHERS BUILDING COMPANY, Address:200 NE MISSOURI RD  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD  
KLOVER ARCHITECTS, Address:10955 LOWELL AVE  
MEYER BROTHERS BUILDING COMPANY, Address:200 NE MISSOURI RD  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 02/24/2010 10/29/2010
Correction

Fire Department- 2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenat commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Codes Administration - 2005 NEC 210.63 - Heating, air-conditioning, and refrigeration equipement outlet. A 125-volt, single-phase, 12- or20-ampere-rated receptacle outlet shall be installed at an accessible loction for the servicing of heating, air conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 7.5 m (25 ft) of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means.
Correction

Codes Administration - The bottom chord braces at the rtu(s) shall be welded once the units have been installed. This will be verified by the city inspection staff.
Correction

Codes Administration - The shell building structural plans provide for an area for r/t/u location. This area has been designed with an increased live load to handle the weight of the units. Units 1, 2, 5 and 6 are not located within this area.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Details of ceiling height and construction. 4. The interface of fire safety control functions.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $362.88 $362.88 Paid 09/29/2009
0120 Building Permit Fee $0.01 $0.01 Paid 09/29/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 10/15/2009
Correction
Partial Correction
10/15/2009
WALL FRAMING + IN-WALL SYSTEMS PERIMETER WALLS INCLUDING NORTH DEMISING WALL; OK TO COVER WHEN READY WALLS LISTED BELOW:
All Rough Inspection - Commercial Partial 10/16/2009
Correction
Partial Correction
10/16/2009
WALL FRAMING + IN-WALL SYSTEMS PERIMETER WALLS INCLUDING NORTH DEMISING WALL; COLUMN WRAPS @ INTERIOR COLUMNS (ELECTRICAL -- CONDUIT + BOXES ONLY); OK TO COVER WHEN READY WALLS LISTED BELOW:
Electrical Service Inspection Failed 11/10/2009
Correction
Corrective Action Required
11/10/2009
FUSIBLE SWITCH ENCLOSURE LABEL BOTH SWITCH CABINETS NOT UNLOCKED FOR INSP + NOT LABELED PER DRWG
Electrical Service Inspection Passed 11/11/2009
Correction
Resolved
11/11/2009
FUSIBLE SWITCH ENCLOSURE
Correction
Resolved
11/11/2009
ELECTRICAL SERVICE INSTALLATION RELEASE SERVICE 400 AMPS; 3P; 600V
Final Inspection - Commercial Not Ready 11/16/2009
Correction
Corrective Action Required
11/16/2009
ADDRESS LABELING OF GAS SERVICE PIPE (NOT ON METER). PROVIDE IDENTIFICATION PRIOR TO INSPECTION REQUEST APPLY PERMANENT TAG TO LOAD SIDE ENTRY PIPE
Gas Piping Inspection - Commercial Failed 11/16/2009
Correction
Corrective Action Required
11/16/2009
SUPPORT OF RIGID STEEL PIPING IFGC 415; IRC G2423: 3/4" OR 1" PIPE -- 8" MAX SPACING; 1-1/4" OR LARGER PIPE -- 10" MAX SPACING; INCOMPLETE HORIZONTAL RUNS
Gas Service Inspection - Commercial Passed 11/16/2009
Correction
Resolved
11/16/2009
GAS PIPING PRESSURE TEST RELEASE GAS SERVICE. GAS SERVICE PIPE TO BE ADDRESS LABELED NO LATER THAN FINAL INSPECTION. PRESSURE HELD STEADY AT >= 10 PSI FOR >=10 MIN
Final Inspection - Commercial Not Ready 11/17/2009
Correction
Corrective Action Required
11/17/2009
ADDRESS LABELING OF GAS SERVICE PIPE (NOT ON METER). PROVIDE IDENTIFICATION PRIOR TO INSPECTION REQUEST APPLY PERMANENT TAG TO LOAD SIDE ENTRY PIPE
Correction
Corrective Action Required
11/17/2009
TRUSS JOIST BOTTOM CHORD BRACES SUBJECT TO APPROVAL AFTER RTU's ARE SET IN PLACE. WELD TOP END AT BAR JOIST ENSURE BOLT TIGHT @BOTTOM
Gas Piping Inspection - Commercial Passed 11/17/2009
Correction
Resolved
11/17/2009
SUPPORT OF RIGID STEEL PIPING
Correction
Resolved
11/17/2009
PAINTING OF ROOFTOP GAS PIPING SUBJECT TO APPROVAL SEE FINAL BUILDING INSP
Final Inspection - Commercial Failed 11/19/2009
Correction
Resolved
11/19/2009
ADDRESS LABELING OF GAS SERVICE PIPE
Correction
Resolved
11/19/2009
TRUSS JOIST BOTTOM CHORD BRACES
Correction
Corrective Action Required
11/19/2009
PAINTING OF ROOFTOP GAS PIPING TO BE COMPLETED
Correction
Corrective Action Required
11/19/2009
GFCI-PROTECTED ELECT RECEPTS @ RTU's NO BRANCH WIRING INCLUDED IN THIS PERMIT SUBJECT TO TEST/APPROVAL UNDER T/F PERMIT
Correction
Corrective Action Required
11/19/2009
Receive Fire Department approval CONTACT CPT JOE DIR PHONE 816-969-1313
Final Inspection - Commercial Failed 11/23/2009
Correction
Corrective Action Required
11/23/2009
Receive Fire Department approval PER CPT JOE DIR
Final Inspection - Commercial Passed 11/24/2009
Correction
Resolved
11/24/2009
PAINTING OF ROOFTOP GAS PIPING
Correction
Resolved
11/24/2009
GFCI-PROTECTED ELECT RECEPTS @ RTU's NO BRANCH WIRING INCLUDED IN THIS PERMIT SUBJECT TO TEST/APPROVAL UNDER T/F PERMIT
Correction
Resolved
11/24/2009
Receive Fire Department approval PER CPT JOE DIR
All Rough Inspection - Commercial Passed 11/25/2009
Correction
Resolved
11/25/2009
WALL FRAMING + IN-WALL SYSTEMS
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home