Permit Application Status

B0900137


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0900137
Building Permit - Commercial
Final Completion
CBL LEES SUMMIT EAST LLC
NEW COMMERCIAL
CLOCK TOWER
03/06/2009
03/18/2009
09/14/2009
09/21/2009
Locations
Contacts
SALADINO PLUMBING AND HEATING CO., Address:2210 TELEVISION PLACE  
WESTHUES ELECTRIC INC., Address:4813 RAYTOWN RD  
ARGO PLUMBING, Address:3671 STATE HIGHWAY P  
VCC, Address:216 LOUISIANA ST  
CBL LEES SUMMIT EAST LLC, Address:2030 HAMILTON PLACE BLVD STE 500  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 09/08/2009 10/29/2010
Correction

Fire Department- 2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC 510.1 Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $2,012.52 $2,012.52 Paid 03/18/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 05/05/2009
Correction
Resolved
05/05/2009
PREPARATION TO POUR CLOCK TOWER GRADE BEAM & FOOTINGS OK TO POUR WHEN READY
Footing Inspection - Commercial Passed 05/05/2009
Footing Inspection - Commercial Passed 05/08/2009
Correction
Resolved
05/08/2009
PREPARATION TO POUR PIER CAPS AT TOWER BASE OK TO POUR WHEN READY
Underslab Electrical Inspection - Commercial Not Ready 06/08/2009
Correction
Corrective Action Required
06/08/2009
UNDER-SLAB ELECTRICAL CONDUIT UNDER LOWER LEVEL SLAB COVERED BEFORE INSPECTION
Underground Electrical Inspection - Commercial Request Complete 6/8/2009 6/8/2009 06/08/2009
Underslab Electrical Inspection - Commercial Passed 06/09/2009
Correction
Resolved
06/09/2009
UNDER-SLAB ELECTRICAL CONDUIT UNDER LOWER LEVEL SLAB OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Request Complete 6/8/2009 6/9/2009 06/09/2009
All Rough Inspection - Commercial Partial 06/19/2009
Correction
Partial Correction
06/19/2009
LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS LOWER 1/3 OF TOWER HEIGHT; OK TO COVER WHEN READY WALLS AREAS LISTED BELOW:
All Rough Inspection - Commercial Not Ready 06/22/2009
Correction
Corrective Action Required
06/22/2009
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
All Rough Inspection - Commercial Passed 06/24/2009
Correction
Resolved
06/24/2009
LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS LOWER 1/3 OF TOWER HEIGHT; UPPER 2/3 OF TOWER HEIGHT OK TO COVER WHEN READY WALLS AREAS LISTED BELOW:
Correction
Resolved
06/24/2009
READINESS FOR INSPECTION
All Rough Inspection - Commercial Passed 07/01/2009
Correction
Resolved
07/01/2009
LIGHT-GUAGE STEEL WALL FRAMING + IN-WALL SYSTEMS LOWER 1/3 + UPPER 2/3 OF TOWER HEIGHT OK FOR INSTALLATION OF GWB OK TO COVER WHEN READY WALLS AREAS LISTED BELOW:
Rough Electrical Inspection - Commercial Partial 07/29/2009
Correction
Partial Correction
07/29/2009
LIGHNING PROTECTION PER RFI #0250 CONDUCTORS WELDED TO TWO GROUND RODS DRIVEN N OF TOWER; OK TO COVER WHEN READY FOLLOWING COMPONENTS:
Final Inspection - Commercial Not Ready 08/17/2009
Correction
Corrective Action Required
08/17/2009
READINESS FOR INSPECTION REQUEST INSPECTION WHEN FINIAL IS COMPLETED
Rough Electrical Inspection - Commercial Passed 08/19/2009
Correction
Resolved
08/19/2009
LIGHNING PROTECTION PER RFI #0250 DRIVEN NORTH OF TOWER CONDUCTORS WELDED TO TWO GROUND RODS
Final Inspection - Commercial Not Ready 08/19/2009
Correction
Resolved
08/19/2009
READINESS FOR INSPECTION
Correction
Corrective Action Required
08/19/2009
UL LISTING OF LIGHTED SIGNS & DECORATIVE ELEMENTS IF INTERNALLY LIGHTED, MUST BE UL SHOP-LABELED PER NEC 600.3. 1) "SUMMIT FAIR" SIGN ELEMENTS AT EAST FACE HIGH ON TOWER 2) DIRECTORY CABINET AT NORTH FACE BOTTOM OF TOWER NO UL LABEL FOUND AS INDICATION OF LISTING
Final Inspection - Commercial Failed 09/16/2009
Correction
Corrective Action Required
09/16/2009
UL LISTING OF LIGHTED SIGNS & DECORATIVE ELEMENTS IF INTERNALLY LIGHTED AND >= 12V, MUST BE UL SHOP-LABELED PER NEC 600.3. 1) "SUMMIT FAIR" SIGN ELEMENTS AT EAST FACE HIGH ON TOWER 2) DIRECTORY CABINETS AT E & S FACES @ BOTTOM OF TOWER NO UL LABEL FOUND AS INDICATION OF LISTING
Correction
Corrective Action Required
09/16/2009
GLAZING OF DIRECTORY CABINET FRONTS E & S FACES OF TOWER NOT SAFETY GLASS
Correction
Corrective Action Required
09/16/2009
INSTALLATION OF LIGHTED SIGN ELECTRICAL BOXES MOUNTING ON LADDER SECURE TO BLDG STRUCTURE
Final Inspection - Commercial Passed 09/18/2009
Correction
Resolved
09/18/2009
UL LISTING OF LIGHTED SIGNS & DECORATIVE ELEMENTS E-MAIL STIPULATION TO JB DATED 9/18/09 TO BE RESOLVED PER RED DEVELOPMENT
Correction
Resolved
09/18/2009
GLAZING OF DIRECTORY CABINET FRONTS E-MAIL STIPULATION TO JB DATED 9/18/09 TO BE RESOLVED PER RED DEVELOPMENT
Correction
Resolved
09/18/2009
INSTALLATION OF LIGHTED SIGN ELECTRICAL BOXES E-MAIL STIPULATION TO JB DATED 9/18/09 TO BE RESOLVED PER RED DEVELOPMENT
Documents & Images
Date Uploaded File Type Document Name
09/19/2017 Letter B0900137summitfairclockcomments1
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home