Permit Application Status

B0801732


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0801732
Building Permit - Commercial
Certificate of Occupancy
3 CHICKS INVESTING LLC
NEW COMMERCIAL
3 CHICKS INVESTING LLC TENANT FINISH
12/23/2008
01/26/2009
07/25/2009
09/04/2009
Locations
Contacts
LMC MECHANICAL LLC, Address:1203 ALLENDALE DR  
PILGRIM PLUMBING INC, Address:32204 E OUTER BELT ROAD  
GUY GRONBERG ARCHITECTS, PC, Address:113 SE 3RD ST  
WHITESTONE DEVELOPMENT, Address:203 SW JEFFERSON ST  
REDLINE ELECTRIC LLC, Address:11918 A HWY  
3 CHICKS INVESTING LLC, Address:330 SW MAIN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/25/2009 10/29/2010
Correction

Fire Department- 2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenat commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Correction

Codes Administration - 2006 IBC 1009.10 - Handrails. Stairways shall have handrails on each side and shall comply with Section 1012. Where glass is used to provide the handrail, the handrail shall also comply with Section 2047.
Correction

Codes Administration - 2006 IBC 1109.4 - Kitchens and kitchenettes. Where kitchens and kitchenettes are provided in accessible spaces or rooms, they shall be accessible in accordance with ICC A117.1.
Correction

Fire Department- The attic space shall be posted "no storage " as indicated .
Correction

Codes Administration - I am unable to locate an evaluation report on the structure from a licensed engineer.
Correction

Codes Administration - I am unable to locate information on the auxillary and secondary drain system for AHU-2 as required by Section 307.2.3 of the 2006 IMC. These systems are required when overflow or stoppage in the condensate drain from any cooling or evaporator coil that produces condensate can cause damage to any building component.
Correction

Codes Administration - Plumbing Plan Note 4 on Sheet P1 indicates that a double check backflow is to be installed on the domestic service and an RPZ is to be installed on the irrigation system. Actually, an RPZ is required on the domestic and a double check is required on the irrigation system.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $324.90 $324.90 Paid 01/26/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 02/04/2009
Correction
Resolved
02/04/2009
PREPARATION TO POUR PIPE COLUMN FOOTINGS TWELVE PER DETAIL 5/A1 OK TO POUR WHEN READY
Electrical Service Inspection Not Ready 02/09/2009
Correction
Corrective Action Required
02/09/2009
CONFIGURATION OF NEW SERVICE NOT PER APPROVED DRAWING
Correction
Corrective Action Required
02/09/2009
TERMINATION OF GROUNDING ELECTRODE CONDUCTOR NOT BEFORE 1ST FITTING
Correction
Corrective Action Required
02/09/2009
READINESS FOR INSPECTION NO INSPECTIONS PERFORMED ON HOT SERVICES
Electrical Service Inspection Passed 02/19/2009
Correction
Resolved
02/19/2009
CONFIGURATION OF NEW SERVICE RELEASE SERVICE PER REVISED DRAWING TWO 200 AMP PANELS
Correction
Resolved
02/19/2009
TERMINATION OF GROUNDING ELECTRODE CONDUCTOR
Correction
Resolved
02/19/2009
READINESS FOR INSPECTION
All Rough Inspection - Commercial Partial 02/24/2009
Correction
Partial Correction
02/24/2009
None ELECTRICAL APPROVED 1 ST. FLOOR ONLY 1 ST FLOOR ONLY WALLS AND CEILING
Correction
Partial Correction
02/24/2009
None 1 ST FLOOR MECHANICAL APPROVED 1 ST FLOOR ONLY
Correction
Partial Correction
02/24/2009
None SINK DRAIN REQUIRED TO BE VENTED 1 ST FLOOR ONLY
Correction
Partial Correction
02/24/2009
None OK INSULATION AND ROCK 1 ST. FLOOR ONLY 1 ST FLOOR
All Rough Inspection - Commercial Partial 03/03/2009
Correction
Resolved
03/03/2009
None SEE BELOW
Correction
Resolved
03/03/2009
None SEE BELOW
Correction
Resolved
03/03/2009
None SEE BELOW
Correction
Resolved
03/03/2009
None SEE BELOW
Correction
Partial Correction
03/03/2009
ALL TRADES ROUGH-IN AT WALLS & CEILINGS 1ST FLOOR AFTER LEVEL-TO-LEVEL OPENINGS ARE FIRE-BLOCKED; 200-208; 210-213; OK TO COVER WHEN READY WALLS/CEILINGS @ SPACES:
Correction
Corrective Action Required
03/03/2009
FIRE-BLOCKING OF LEVEL-TO-LEVEL OPENINGS VARIOUS LOCATIONS SEAL ALL BEFORE COVERING
Correction
Corrective Action Required
03/03/2009
ATTIC FLOOR JOISTS ABOVE SPACE 209 SEVERELY OVER-NOTCHED THREE SUCCESSIVE JOISTS
All Rough Inspection - Commercial Passed 03/04/2009
Correction
Resolved
03/04/2009
ALL TRADES ROUGH-IN AT WALLS & CEILINGS 1ST FLOOR; 200-208; 209; 210-213 ENSURE ALL HOLES & PENETRATIONS OF TOP & BOTTOM PLATES ARE FIRE-BLOCKED. OK TO COVER WHEN READY WALLS/CEILINGS @ SPACES:
Correction
Resolved
03/04/2009
FIRE-BLOCKING OF LEVEL-TO-LEVEL OPENINGS IN PROGRESS
Correction
Resolved
03/04/2009
ATTIC FLOOR JOISTS ABOVE SPACE 209
Footing Inspection - Commercial Passed 03/06/2009
Correction
Resolved
03/06/2009
PREPARATION TO POUR FOOTING FOR HANDICAPPED RAMP OK TO POUR WHEN READY
Occupancy Inspection - Codes Commercial Failed 04/22/2009
Correction
Corrective Action Required
04/22/2009
Receive Fire Department approval
Correction
Corrective Action Required
04/22/2009
Receive Water Utilities Approval
Correction
Corrective Action Required
04/22/2009
Receive Planning & Development Approval
Correction
Corrective Action Required
04/22/2009
NON-METALLIC ELECTRICAL CONDUIT SECURE TO WALL WITHIN 12" OF ENTRY TO DISCONNECT ENCLOSURE AC CONDENSER WHIPS NOT SECURED TO STRUCTURE
Correction
Corrective Action Required
04/22/2009
SEALING OF EXTERIOR WALL IRC R703.1: SEAL PERIMETERS (MINIMUM TOP & SIDES) OF ALL ENCLOSURES TO WALL BEHIND HVAC DISCONNECTS & ELECT METER ENCLOSURE
Correction
Corrective Action Required
04/22/2009
WATER CLOSET SEATS IPC 420.2: SEATS REQUIRED TO BE OPEN-FRONT NOT COMMERCIAL TYPE ELONGATED BOWL
Correction
Corrective Action Required
04/22/2009
ELECTRICAL RECEPTACLES THREE MISSING PLATES OPEN GROUND @3RD FLR WEST
Correction
Corrective Action Required
04/22/2009
LABELING OF ELECTRICAL CIRCUIT BREAKERS NEC 408.4; IRC E36O6.2. EACH BREAKER MUST BE LABELED. MUST BE LEGIBLE; SPECIFIC. IF PANEL SCHEDULE IS USED NUMBER POSITIONS ON PANEL FRONT PER SCHEDULE. NO DITTO MARKS OR CONTINUATION SYMBOLS EXCEPT @ MULTIPLE POLE BREAKERS. LABEL UNUSED BREAKERS "SPARE" COMPLETE PANEL SCHEDULES MAKE COMPLETE/SPECIFIC
Correction
Corrective Action Required
04/22/2009
RANGE AT THIRD FLOOR NO ANTI-TIP PROVISION
Correction
Corrective Action Required
04/22/2009
STARIR TO THIRD FLOOR NO HANDRAIL
Correction
Corrective Action Required
04/22/2009
ACCESSIBLE RESTROOM @ 1ST FLOOR NO VERTICAL GRAB BAR
Correction
Partial Correction
04/22/2009
USE / OCCUPANCY APPROVAL STATUS OK TO SET UP FOR BUSINESS
Occupancy Inspection - Codes Commercial Failed 04/28/2009
Correction
Corrective Action Required
04/28/2009
Receive Fire Department approval COORDINATE W/ CPT JOE DIR PHONE 816-969-1313
Correction
Resolved
04/28/2009
Receive Water Utilities Approval PER BEN HASKAMP 4/28/09
Correction
Corrective Action Required
04/28/2009
Receive Planning & Development Approval SEE INSPECTION REPORT PROVIDED CHRISTINA ALEXANDER PHONE 816-969-1607
Correction
Resolved
04/28/2009
NON-METALLIC ELECTRICAL CONDUIT
Correction
Partial Correction
04/28/2009
SEALING OF EXTERIOR WALL SEAL REMAINING HOLE FOR SIGN ELECTRICAL CIRCUIT WHEN WORK IS COMPLETED. ONE HOLE STILL OPEN PLANNED FOR USE
Correction
Resolved
04/28/2009
WATER CLOSET SEATS
Correction
Resolved
04/28/2009
ELECTRICAL RECEPTACLES
Correction
Partial Correction
04/28/2009
LABELING OF ELECTRICAL CIRCUIT BREAKERS NEC 408.4: EACH BREAKER AT SUB-PANEL MUST BE LABELED. MUST BE LEGIBLE; SPECIFIC. IF PANEL SCHEDULE IS USED NUMBER POSITIONS ON PANEL FRONT PER SCHEDULE. NO DITTO MARKS OR CONTINUATION SYMBOLS EXCEPT @ MULTIPLE POLE BREAKERS. LABEL UNUSED BREAKERS "SPARE" COMPLETE PANEL SCHEDULES MAKE COMPLETE/SPECIFIC
Correction
Resolved
04/28/2009
RANGE AT THIRD FLOOR ANTI-TIP PROVISION DONE
Correction
Resolved
04/28/2009
STARIR TO THIRD FLOOR HANDRAIL INSTALLED
Correction
Resolved
04/28/2009
ACCESSIBLE RESTROOM @ 1ST FLOOR VERTICAL GRAB BAR
Correction
Partial Correction
04/28/2009
USE / OCCUPANCY APPROVAL STATUS SEE TEMPORARY OCCUPANCY
Correction
Corrective Action Required
04/28/2009
ELECTRICAL WIRING & LUMINAIRE FOR MONUMENT SIGN REQUEST INSPECTION BEFORE COVERING WORK. SUBJECT TO APPROVAL WHEN INSTALLED
Underground Electrical Inspection - Commercial Passed 05/07/2009
Correction
Resolved
05/07/2009
UNDERGROUND FEEDER TO MONUMENT SIGN TRENCHED CONDUIT OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Failed 05/07/2009
Correction
Corrective Action Required
05/07/2009
None COVERED WITHOUT INSPECTION
Underground Electrical Inspection - Commercial Request Complete 5/6/2009 5/7/2009 05/07/2009
Occupancy Inspection - Codes Commercial Failed 05/13/2009
Correction
Resolved
05/13/2009
Receive Fire Department approval PER CPT JOE DIR 5/13/09
Correction
Resolved
05/13/2009
ELECTRICAL WIRING & LUMINAIRE FOR MONUMENT SIGN
Occupancy Inspection - Codes Commercial Failed 07/17/2009
Correction
Resolved
07/17/2009
SEALING OF EXTERIOR WALL
Correction
Resolved
07/17/2009
LABELING OF ELECTRICAL CIRCUIT BREAKERS
Occupancy Inspection - Codes Commercial Passed 09/03/2009
Correction
Resolved
09/03/2009
Receive Planning & Development Approval PER BOB MCKAY 9/2/09
Correction
Resolved
09/03/2009
USE / OCCUPANCY APPROVAL STATUS
Documents & Images
Date Uploaded File Type Document Name
07/31/2017 Todd George House 408 SE 3rd St
09/19/2017 B0801732chicksinvestingcomments1
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home