Permit Application Status

B0801602


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0801602
Building Permit - Commercial
Final Completion
CBL LEES SUMMIT EAST LLC
NEW SHELL BUILDING
SUMMIT FAIR BUILDING B SHELL BUILDING
11/13/2008
01/30/2009
07/29/2009
08/14/2009
Locations
Contacts
VCC, Address:216 LOUISIANA ST  
ARGO PLUMBING, Address:3671 STATE HIGHWAY P  
GEOTECHNOLOGY INC, Address:9136 CODY  
THE PRESTON PARTNERSHIP, LLC, Address:100 ABERNATHY RD NE, BLDG400, STE 550  
WESTHUES ELECTRIC INC., Address:4813 RAYTOWN RD  
CBL LEES SUMMIT EAST LLC, Address:2030 HAMILTON PLACE BLVD STE 500  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/25/2009 10/29/2010
Correction

Fire Department- 2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenat commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Correction

Fire Department- 2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Correction

Fire Department- 2006 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m).
Correction

Fire Department- 2006 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 901.5.1- Occupancy. It shall be unlawful to occupy any portion of a building or structure until the required fire detection, alarm and suppression systems have been tested and approved.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Codes Administration - 2006 IBC 1008.1.4 - Floor elevation. There shall be a floor or landing on each side of a door. Such floor or landing shall be at the same elevation on each side of the door. Landings shall be level except for exterior landings, which are permitted to have a slope not to exceed 0.25 unit vertical in 12 units horizontal (2-percent slope).
Correction

Codes Administration - 2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional.
Correction

Codes Administration - 2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Codes Administration - This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start wth a number representing the floor on which the unit is located.
Correction

Codes Administration - 2006 IMC 306.5 - Equipment and appliances on roofs or elevated structures. Where equipment and appliances requiring access are installed on roofs or elevated structures at a height exceeding 16 feet, such access shall be provided by a permanent approved means of access, the extent of which shall be from grade or floor level to the equipment and appliances' level service space. Such access shall not require climbing over obstructions greater than 30 inches high or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30 inches. 2. Ladders shall have rung spacing not to exceed 14 inches on center. 3. Ladders shall have a toe spacing not less than 6 inches deep. 4. There shall be a minimum of 18 inches between rails. 5. Rungs shall have a minumum 0.75-inch diameter and be capable of withstanding a 300-pound load. 6. Ladders over 30 feet in height shall be provided with offset sections and landings capable of withstanding 100 pound per square foot. 7. Ladders shall be protected against corrosion by approved means. Catwalks instlled to provide the required access shall be not less than 24 inches wide and shall have railing as required for service platforms.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Tenant finish plans shall be submitted to the Codes Administration Department prior to any interior alteration or improvments. Permits shall be obtained prior to any performing any work which requires permits.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

Fire Department- 2006 IFC 903.3.7 Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the fire code official.
Correction

Fire Department- 2006 IFC 914.2.1 Automatic sprinkler system. The covered mall building and buildings connected shall be equipped throughout with an automatic sprinkler system in accordance with Section 903.1.1, which shall comply with the following: 1. The automatic sprinkler system shall be complete and operative throughout occupied space in the covered mall building prior to occupancy of any of the tenant spaces. Unoccupied tenant spaces shall be similarly protected unless provided with approved alternate protection. 2. Sprinkler protection for the mall shall be independent from that provided for tenant spaces or anchors. Where tenant spaces are supplied by the same system, they shall be independently controlled. Exception: An automatic sprinkler system shall not be required in spaces or areas of open parking garages constructed in accordance with Section 406.2 of the International Building Code.
Correction

Codes Administration - Details for the tower roof framing have not been provided.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $4,695.66 $4,695.66 Paid 01/30/2009
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Not Ready 03/24/2009
Correction
Corrective Action Required
03/24/2009
READINESS FOR INSPECTION WORK REQUESTED FOR INSP NOT COMPLETED
Rough Framing Inspection - Commercial Request Complete 3/24/2009 3/24/2009 03/24/2009
All Rough Inspection - Commercial Not Ready 03/27/2009
Correction
Corrective Action Required
03/27/2009
READINESS FOR INSPECTION WORK REQUESTED FOR INSP NOT COMPLETED
Rough Framing Inspection - Commercial Request Complete 3/27/2009 3/27/2009 03/27/2009
Rough Framing Inspection - Commercial Failed 03/30/2009
Correction
Partial Correction
03/30/2009
LIGHT-GAUGE FRAMING PERIMETER ROOF ELEVATION. WEST WALL TO TOWER, EAST OF TOWER TO ROOF ACCESS. ( TOWER FRAMING NOT INSPETED)
Rough Framing Inspection - Commercial Request Complete 3/27/2009 3/30/2009 03/30/2009
Rough Framing Inspection - Commercial Failed 03/31/2009
Correction
Corrective Action Required
03/31/2009
GROUND LEVEL TO ROOF DECK ....
Rough Framing Inspection - Commercial Request Complete 3/30/2009 3/31/2009 03/31/2009
Rough Framing Inspection - Commercial Partial 04/02/2009
Correction
Partial Correction
04/02/2009
LIGHT-GAUGE FRAMING PERIMETER ROOF ELEVATION. WEST WALL TO TOWER, EAST OF TOWER TO ROOF ACCESS. ( TOWER FRAMING NOT INSPETED)
Correction
Resolved
04/02/2009
GROUND LEVEL TO ROOF DECK SEE ALL-ROUGH
All Rough Inspection - Commercial Partial 04/02/2009
Correction
Resolved
04/02/2009
READINESS FOR INSPECTION
Correction
Partial Correction
04/02/2009
LIGHT-GUAGE STEEL EXTERIOR WALL FRAMING TOWER TRUSSES NOT READY FOR INSPECTION OK TO COVER WHEN READY FLOOR TO CORNICE
Rough Framing Inspection - Commercial Request Complete 4/2/2009 4/2/2009 04/02/2009
All Rough Inspection - Commercial Partial 04/15/2009
Correction
Partial Correction
04/15/2009
LIGHT-GUAGE STEEL EXTERIOR WALL FRAMING TOWER TRUSSES NOT APPROVED OK TO COVER WHEN READY FLOOR TO CORNICE
Correction
Resolved
04/15/2009
WALL FRAMING + IN-WALL SYSTEMS @ ELECTRICAL & SPRINKLER ROOM OK TO COVER WHEN READY AFTER SHIELD PLATES DONE
Footing Inspection - Commercial Passed 04/15/2009
Correction
Resolved
04/15/2009
PREPARATION TO POUR FOOTING FOR SERVICE YARD WALL OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Request Complete 4/15/2009 4/15/2009 04/15/2009
Rated Assembly Inspection Not Ready 05/04/2009
Correction
Corrective Action Required
05/04/2009
RATED WALLS @ SPRINKLER ROOM & ELECTRICAL ROOM PVC PENETRATION OF WALL ISSUED NOT RESOLVED
Rated Assembly Inspection Partial 05/07/2009
Correction
Partial Correction
05/07/2009
RATED WALLS @ SPRINKLER ROOM & ELECTRICAL ROOM 1 LAYER BOTH FACES BOTH ROOMS; NOTE: TREATMENT OF PENETRATIONS SUBJECT TO APPROVAL OK TO COVER WHEN READY COMPONENTS BELOW:
Rated Assembly Inspection Partial 05/15/2009
Correction
Partial Correction
05/15/2009
RATED WALLS @ SPRINKLER ROOM & ELECTRICAL ROOM 1 LAYER BOTH FACES BOTH ROOMS; INTERIOR FACE OF ELECTRICAL ROOM; NOTE: TREATMENT OF PENETRATIONS SUBJECT TO APPROVAL OK TO COVER WHEN READY COMPONENTS BELOW:
Underground Electrical Inspection - Commercial Passed 05/27/2009
Correction
Resolved
05/27/2009
BURIED CONDUIT AT SERVICE YARD OK TO COVER WHEN READY
Electrical Service Inspection Passed 05/27/2009
Correction
Resolved
05/27/2009
ELECTRICAL SERVICE FOOTING GROUND G.E.C. CONNECTED TO FOOTING RE-BAR
Correction
Resolved
05/27/2009
ELECTRICAL SERVICE GROUND ROD GRID 3 RODS + G.E.C. IN PLACE
Rated Assembly Inspection Partial 06/11/2009
Correction
Partial Correction
06/11/2009
RATED WALLS @ SPRINKLER ROOM & ELECTRICAL ROOM 1 LAYER BOTH FACES BOTH ROOMS; 2ND LAYER @ INTERIOR FACE OF ELECTRICAL ROOM; PER DESIGN MODIFICATION: SPRINKLER RM S WALL CORR FACE 1 LAYER; ELECT RM N WALL CORR FACE 1 LAYER; NOTE: TREATMENT OF PENETRATIONS SUBJECT TO APPROVAL OK TO COVER WHEN READY COMPONENTS BELOW:
All Rough Inspection - Commercial Passed 06/11/2009
Correction
Resolved
06/11/2009
LIGHT-GUAGE STEEL EXTERIOR WALL FRAMING
Correction
Resolved
06/11/2009
WALL FRAMING + IN-WALL SYSTEMS @ ELECTRICAL & SPRINKLER ROOM
Gas Piping Inspection - Commercial Passed 06/11/2009
Correction
Resolved
06/11/2009
GAS PIPING PRESSURE TEST SINGLE SERVICE PRESSURE HELD STEADY AT >= 10 PSI FOR >=10 MIN
Rough Framing Inspection - Commercial Passed 06/11/2009
Correction
Resolved
06/11/2009
LIGHT-GAUGE FRAMING PERIMETER ROOF ELEVATION.
Rated Assembly Inspection Partial 06/12/2009
Correction
Partial Correction
06/12/2009
RATED WALLS @ SPRINKLER ROOM & ELECTRICAL ROOM 1 LAYER BOTH FACES BOTH RMS; 2ND LAYER @ INT FACE OF ELECT ROOM; PER DESIGN MODIFICATION: SPRINKLER RM S WALL CORR FACE 1 LAYER; ELECT RM N WALL CORR FACE 2 LAYERS; NOTE: BEAM BOX-OUT 2ND LAYER + TREATMENT OF PENETRATIONS SUBJECT TO APPROVAL OK TO COVER WHEN READY COMPONENTS BELOW:
Electrical Service Inspection Partial 06/18/2009
Correction
Partial Correction
06/18/2009
ELECTRICAL SERVICE FOOTING GROUND G.E.C. CONNECTED TO FOOTING RE-BAR
Rated Assembly Inspection Passed 06/19/2009
Correction
Resolved
06/19/2009
RATED WALLS @ SPRINKLER ROOM & ELECTRICAL ROOM 1 LAYER BOTH FACES BOTH RMS; 2ND LAYER @ INT FACE OF ELECT ROOM; PER DESIGN MODIFICATION: SPRINKLER RM S WALL CORR FACE 1 LAYER; ELECT RM N WALL CORR FACE 2 LAYERS; BEAM BOX-OUT 2ND LAYER NOTE: TREATMENT OF PENETRATIONS SUBJECT TO APPROVAL OK TO COVER WHEN READY COMPONENTS BELOW:
Above Ceiling Inspection Passed 06/19/2009
Correction
Resolved
06/19/2009
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS CORRIDOR @ EAST WALL OK TO COVER WHEN READY
Electrical Service Inspection Not Ready 06/19/2009
Correction
Corrective Action Required
06/19/2009
MAIN SWITCHGEAR & SERVICE ENTRY WIRING & EQUIPMENT NOT TO BE RELEASED AT THIS TIME DUE TO TENANT SERVICE EQUIPMENT SHOWN ON DRAWINGS NOT INSTALLED. ONE 800 AMP DISCONNECT + 200 AMP HOUSE SERVICE
Correction
Resolved
06/19/2009
ELECTRICAL SERVICE FOOTING GROUND G.E.C. CONNECTED TO FOOTING RE-BAR
Electrical Service Inspection Passed 06/29/2009
Correction
Resolved
06/29/2009
MAIN SWITCHGEAR & SERVICE ENTRY WIRING & EQUIPMENT TENANT SERVICE SHOWN ON DRAWINGS NOT INSTALLED; NOT TO BE RELEASED AT THIS TIME DUE TO HOLD BY DEVELOPER. ONE 800 AMP DISCONNECT + 200 AMP HOUSE SERVICE
Final Inspection - Commercial Not Ready 07/27/2009
Correction
Corrective Action Required
07/27/2009
Receive Fire Department approval
Final Inspection - Commercial Not Ready 07/28/2009
Correction
Corrective Action Required
07/28/2009
Receive Water Utilities Approval
Correction
Corrective Action Required
07/28/2009
THIRD PARTY INSPECTIONS FINAL REPORT PENDING
Correction
Corrective Action Required
07/28/2009
BACKFLOW PREVENTION DEVICE SCREW-ON TYPE VACUUM BREAKER REQUIRED AT HOSE BIBB SPRINKLER ROOM
Correction
Corrective Action Required
07/28/2009
WALL PENETRATIONS AT EXTERIOR HOSE BIBB ACCESS SEAL GAPS TO WALLS
Correction
Corrective Action Required
07/28/2009
OPENINGS AT PARAPET WALLS AT ROOF FACE UNFINISHED WORK IN PROGRESS
Correction
Corrective Action Required
07/28/2009
FIRE ALARM WIRING BOXES SOME REMAIN OPEN CLOSE ALL
Final Inspection - Commercial Not Ready 08/05/2009
Final Inspection - Commercial Not Ready 08/06/2009
Correction
Corrective Action Required
08/06/2009
THIRD PARTY INSPECTIONS FINAL REPORTS REQUIRED SOILS, CONCRETE, STEEL + EIFS INSTALLATION
Correction
Corrective Action Required
08/06/2009
WALL PENETRATIONS AT EXTERIOR HOSE BIBB ACCESS SEAL GAPS TO WALLS
Correction
Corrective Action Required
08/06/2009
GROUND RESISTANCE TEST AT POINT OF ELECTRICAL SERVICE PER ELECTRICAL DRAWING. FALL OF POTENTIAL METHOD REPORT TO BE SUBMITTED
Correction
Corrective Action Required
08/06/2009
SUPPORT OF WATER PIPING AT SRINKLER RISER ROOM TRAP PRIMER PIPING SUPPORT TO WALL OR FLOOR
Correction
Corrective Action Required
08/06/2009
BACKFLOW PREVENTION DEVICE SCREW-ON TYPE VACUUM BREAKER REQUIRED AT HOSE CONNECTI SPRINKLER ROOM
Final Inspection - Commercial Not Ready 08/12/2009
Correction
Resolved
08/12/2009
Receive Fire Department approval PER CPT JOE DIR 8/11/09
Correction
Resolved
08/12/2009
THIRD PARTY INSPECTIONS SEE DETAIL SUBMITTED TO GC AND DEVELOPER
Correction
Resolved
08/12/2009
BACKFLOW PREVENTION DEVICE
Correction
Resolved
08/12/2009
WALL PENETRATIONS AT EXTERIOR HOSE BIBB ACCESS SEE GENERAL ITEM BELOW RE WALL PENETRATIONS
Correction
Resolved
08/12/2009
OPENINGS AT PARAPET WALLS AT ROOF FACE
Correction
Resolved
08/12/2009
FIRE ALARM WIRING BOXES
Correction
Resolved
08/12/2009
MID-SPAN BOTTOM CHORD BRACING @ TRUSS JOISTS DEVELOPER LEASE CONDITIONS TO REQUIRE UPPER ENDS OF BOTTOM CHORD BRACES BE WELDED BY TENANT FINISH PERMIT HOLDERS AFTER ROOF DECK DEAD LOAD IS IMPOSED. RESOLVED PER A/E LETTER DATED 8/6/09
Correction
Resolved
08/12/2009
GROUND RESISTANCE TEST AT POINT OF ELECTRICAL SERVICE FALL OF POTENTIAL METHOD REPORT SUBMITTED
Correction
Resolved
08/12/2009
SUPPORT OF WATER PIPING AT SRINKLER RISER ROOM TRAP PRIMER PIPING
Correction
Resolved
08/12/2009
BACKFLOW PREVENTION DEVICE
Final Inspection - Commercial Passed 08/13/2009
Correction
Resolved
08/13/2009
Receive Water Utilities Approval PER BEN HASKAMP 8/13/09
Documents & Images
Date Uploaded File Type Document Name
09/19/2017 B0801602summitfairbldgBcomments1
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home