Permit Application Status

B0801281


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0801281
Building Permit - Commercial
Final Completion
CBL LEES SUMMIT EAST LLC
NEW OTHER
PARKING LOT LIGHTING
09/04/2008
09/09/2008
03/08/2009
08/21/2009
Locations
Contacts
RF FISHER ELECTRIC COMPANY LLC, Address:1707 W 39TH AVE  
CBL LEES SUMMIT EAST LLC, Address:2030 HAMILTON PLACE BLVD STE 500  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/07/2009 10/29/2010
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $450.80 $450.80 Paid 09/09/2008
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 09/09/2008
Correction
Resolved
09/09/2008
PRE-CAST CONCRETE LIGHT POLE BASES GROUNDING ONLY INSPECTED SEE RECORDED HEREIN
Correction
Partial Correction
09/09/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING GROUNDS AT + TRENCHED CONDUIT BETWEEN: 8<>9<>10<>11 TRENCHED CONDUIT ONLY BETWEEN: QBOX BETWEEN 6&10<>6<>1<>2 OK TO COVER WHEN READY CONDUIT & GROUNDS LISTED:
Underground Electrical Inspection - Commercial Not Ready 09/10/2008
Correction
Corrective Action Required
09/10/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Underground Electrical Inspection - Commercial Request Complete 9/9/2008 9/10/2008 09/10/2008
Underground Electrical Inspection - Commercial Not Ready 09/11/2008
Correction
Corrective Action Required
09/11/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Underground Electrical Inspection - Commercial Request Complete 9/10/2008 9/11/2008 09/11/2008
Underground Electrical Inspection - Commercial Partial 09/19/2008
Correction
Partial Correction
09/19/2008
None LIGHT POLE BASES AND UNDERGROUND ELECT FOR LIGHT POLE BASE # 1 THRU 6 AND 12 THROUGH 19 APPROVED.
Underground Electrical Inspection - Commercial Request Complete 9/19/2008 9/19/2008 09/19/2008
Underground Electrical Inspection - Commercial Partial 09/25/2008
Correction
Resolved
09/25/2008
None
Correction
Resolved
09/25/2008
READINESS FOR INSPECTION
Correction
Partial Correction
09/25/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING GROUNDS AT + TRENCHED CONDUIT BETWEEN: 1<>2<>3<>4<>5<>6; 8<>9<>10<>11; 12<>13<>14<>15<>16<>17<>18<>19; 21<>22; 20<>19<>24<>23; 24<>25<>26<>27; 25<>28<>29; TRENCHED CONDUIT ONLY BETWEEN: QBOX BETWEEN 6&10<>6<>1<>2 OK TO COVER WHEN READY CONDUIT & GROUNDS LISTED:
Underground Electrical Inspection - Commercial Request Complete 9/23/2008 9/25/2008 09/25/2008
Underground Electrical Inspection - Commercial Partial 09/29/2008
Correction
Partial Correction
09/29/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING 1<>2<>3<>4<>5<>6; 8<>9<>10<>11; 12<>13<>14<>15<>16<>17<>18<>19; 21<>22; 20<>19<>24<>23; 24<>25<>26<>27; 25<>28<>29; 22<>30<>31; 30<>QBOX @ 28; WARD/BLUEPY SIGN TO QBOX @ 28; SIGN: 19<>28 TRENCHED CONDUIT ONLY BETWEEN: QBOX BETWEEN 6&10<>6<>1<>2 OK TO COVER WHEN READY CONDUIT & GROUNDS LISTED:
Underground Electrical Inspection - Commercial Partial 10/06/2008
Correction
Partial Correction
10/06/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 40<>41; 38<>39; 38<>41; 37<>38; 36<>37; 34<>35; 34<>37; OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Correction
Partial Correction
10/06/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING 1<>2<>3<>4<>5<>6; 8<>9<>10<>11; 12<>13<>14<>15<>16<>17<>18<>19; 21<>22; 20<>19<>24<>23; 24<>25<>26<>27; 25<>28<>29; 22<>30<>31; 30<>QBOX @ 28; WARD/BLUEPY SIGN TO QBOX @ 28; SIGN: 19<>28 TRENCHED CONDUIT ONLY BETWEEN: QBOX BETWEEN 6&10<>6<>1<>2 OK TO COVER WHEN READY CONDUIT & GROUNDS LISTED:
Underground Electrical Inspection - Commercial Request Complete 10/6/2008 10/6/2008 10/06/2008
Underground Electrical Inspection - Commercial Partial 10/09/2008
Correction
Partial Correction
10/09/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Correction
Resolved
10/09/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING PARKING LOT AREAS WEST, NORTH & EAST OF BLDG "A" PARKING LOT AREA EAST OF BLDGS "C" & "D" OK TO COVER WHEN READY CONDUIT & GROUNDS LISTED:
Underground Electrical Inspection - Commercial Request Complete 10/9/2008 10/9/2008 10/09/2008
Underground Electrical Inspection - Commercial Partial 10/28/2008
Correction
Partial Correction
10/28/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; GROUND ONLY INSPECTED @ 45; 45 OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Underground Electrical Inspection - Commercial Partial 10/29/2008
Correction
Partial Correction
10/29/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; AWAITING GROUNDS:[74<>75<>76; 71<>72<>73;] 49<>51; 50<>51; 51<>53; 52<>53; GROUND ONLY INSPECTED @ 45; 45 OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Underground Electrical Inspection - Commercial Request Complete 10/28/2008 10/29/2008 10/29/2008
Underground Electrical Inspection - Commercial Partial 10/30/2008
Correction
Partial Correction
10/30/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; 49<>51; 50<>51; 51<>53; 52<>53; AWAITING GROUNDS:[71<>72<>73; 74<>75<>76; 77<>78<>79]; GROUND ONLY INSPECTED @ 45; 45 OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Underground Electrical Inspection - Commercial Request Complete 10/30/2008 10/30/2008 10/30/2008
Underground Electrical Inspection - Commercial Partial 11/05/2008
Correction
Partial Correction
11/05/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; 49<>51; 50<>51; 51<>53; 52<>53; 71<>72<>73; 74<>75<>76; 77<>78<>79; GROUND ONLY INSPECTED @ 45; 45 OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Underground Electrical Inspection - Commercial Partial 11/06/2008
Underground Electrical Inspection - Commercial Request Complete 11/6/2008 11/10/2008 11/10/2008
Underground Electrical Inspection - Commercial Partial 11/18/2008
Correction
Partial Correction
11/18/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; 49<>51; 50<>51; 51<>53; 52<>53; 71<>72<>73; 74<>75<>76; 77<>78<>79; 42<>43 (EXCL GROUND); 55<>57; 3<>85 (EXCL GROUND); OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Underground Electrical Inspection - Commercial Request Complete 11/17/2008 11/18/2008 11/18/2008
Underground Electrical Inspection - Commercial Partial 11/25/2008
Underground Electrical Inspection - Commercial Request Complete 11/24/2008 11/25/2008 11/25/2008
Underground Electrical Inspection - Commercial Partial 11/26/2008
Correction
Partial Correction
11/26/2008
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; 49<>51; 50<>51; 51<>53; 52<>53; 71<>72<>73; 74<>75<>76; 77<>78<>79; 42<>43 (EXCL GROUND); 55<>57; 3<>85; 80<>81<>82<>83; OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Underground Electrical Inspection - Commercial Partial 02/17/2009
Correction
Partial Correction
02/17/2009
INSTALLATION OF LIGHT POLE BASES POLE BASE SET & GROUND ROD + G.E.C. IN PLACE: #84; 85 OK TO COVER WHEN READY POLE BASES LISTED BELOW:
Underground Electrical Inspection - Commercial Request Complete 2/17/2009 2/17/2009 02/17/2009
Underground Electrical Inspection - Commercial Partial 03/04/2009
Correction
Partial Correction
03/04/2009
INSTALLATION OF LIGHT POLE BASES POLE BASE SET & GROUND ROD + G.E.C. IN PLACE: #84; 85; OK TO COVER WHEN READY POLE BASES LISTED BELOW:
Correction
Partial Correction
03/04/2009
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; 49<>51; 50<>51; 51<>53; 52<>53; 71<>72<>73; 74<>75<>76; 77<>78<>79; 42<>43 (EXCL GROUND); 55<>57; 3<>85; 80<>81<>82<>83; 58<>59<>60; OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Correction
Resolved
03/04/2009
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING PARKING LOT AREAS WEST, NORTH & EAST OF BLDG "A" PARKING LOT AREA EAST OF BLDGS "C" & "D" OK TO COVER WHEN READY CONDUIT & GROUNDS LISTED:
Underground Electrical Inspection - Commercial Request Complete 3/3/2009 3/4/2009 03/04/2009
Underground Electrical Inspection - Commercial Partial 04/23/2009
Correction
Partial Correction
04/23/2009
INSTALLATION OF LIGHT POLE BASES POLE BASE SET & GROUND ROD + G.E.C. IN PLACE: #84; 85;1;2;3;4;5; OK TO COVER WHEN READY POLE BASES LISTED BELOW:
Underground Electrical Inspection - Commercial Request Complete 4/23/2009 4/23/2009 04/23/2009
Underground Electrical Inspection - Commercial Partial 04/24/2009
Correction
Partial Correction
04/24/2009
INSTALLATION OF LIGHT POLE BASES POLE BASE SET & GROUND ROD + G.E.C. IN PLACE: #84; 85;7;61;65;66; OK TO COVER WHEN READY POLE BASES LISTED BELOW:
Correction
Resolved
04/24/2009
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING PARKING LOT AREAS WEST, NORTH & EAST OF BLDG "A" PARKING LOT AREA EAST OF BLDGS "C" & "D"; FEED FOR JPC LOT LIGHTS;FEED FOR BUILDING E LOT LIGHTS OK TO COVER WHEN READY CONDUIT & GROUNDS LISTED:
Underground Electrical Inspection - Commercial Partial 07/10/2009
Correction
Partial Correction
07/10/2009
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; 49<>51; 50<>51; 51<>53; 52<>53; 71<>72<>73; 74<>75<>76; 77<>78<>79; 42<>43 (EXCL GROUND); 55<>57; 3<>85; 80<>81<>82<>83; 58<>59<>60;64<>68<>67; OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Correction
Partial Correction
07/10/2009
INSTALLATION OF LIGHT POLE BASES POLE BASE SET & GROUND ROD + G.E.C. IN PLACE: #84; 85;7;61;65;66;64;67;68; OK TO COVER WHEN READY POLE BASES LISTED BELOW:
Underground Electrical Inspection - Commercial Request Complete 7/10/2009 7/10/2009 07/10/2009
Underground Electrical Inspection - Commercial Not Ready 08/10/2009
Correction
Corrective Action Required
08/10/2009
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Underground Electrical Inspection - Commercial Request Complete 8/7/2009 8/10/2009 08/10/2009
Underground Electrical Inspection - Commercial Partial 08/12/2009
Correction
Resolved
08/12/2009
INSTALLATION OF LIGHT POLE BASES POLE BASE SET & GROUND ROD + G.E.C. IN PLACE: #84; 85;7;61;65;66;64;67;68; 62; 63; OK TO COVER WHEN READY POLE BASES LISTED BELOW:
Underground Electrical Inspection - Commercial Request Complete 8/12/2009 8/12/2009 08/12/2009
Underground Electrical Inspection - Commercial Passed 08/20/2009
Correction
Resolved
08/20/2009
BURIED CONDUIT FOR SITE ELECTRICAL LIGHTING, CONT'D 32<>33; 34<>35; 34<>37; 36<>37; 37<>38; 38<>39; 38<>41; 40<>41; 46<>47; 48<>49; 49<>51; 50<>51; 51<>53; 52<>53; 71<>72<>73; 74<>75<>76; 77<>78<>79; 42<>43 (EXCL GROUND); 55<>57; 3<>85; 80<>81<>82<>83; 58<>59<>60;64<>68<>67; OK TO COVER WHEN READY CONDUIT RUNS LISTED BELOW
Correction
Resolved
08/20/2009
READINESS FOR INSPECTION
Final Electrical Inspection - Commercial Passed 08/20/2009
Correction
Resolved
08/20/2009
CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home