Permit Application Status

B0801046


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0801046
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
ELEVATOR ADDITION BUILDING E
07/15/2008
09/15/2008
03/14/2009
03/10/2009
Locations
Contacts
ACI BOLAND, Address:11229 NALL SUITE 140  
J E DUNN CONSTRUCTION, Address:929 HOLMES  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/24/2009 10/29/2010
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Fire Department-2006 IFC -1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities.
Correction

Fire Department- 2006 IFC 901.4 Installation. Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required systems shall be extended, altered, or augmented as necessary to maintain and continue protection whenever the building is altered, remodeled or added to. Alterations to fire protection systems shall be done in accordance with applicable standards.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

NOTE: The contractor must contact the Missouri Department of Natural Resources at 1-800-361-4827 prior to starting the demolition.
Correction

CA - Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration Department prior to the state insection so that a member of the staff can witness the inspection.
Correction

CA - Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $279.84 $279.84 Paid 09/15/2008
Road and Bridge Escrow $107.69 $107.69 Paid 09/15/2008
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 10/17/2008
Correction
Partial Correction
10/17/2008
FOOTING SLAB AT ELEVATOR SHAFT OK TO POUR WHEN READY
Foundation Inspection - Commercial Passed 10/21/2008
Correction
Resolved
10/21/2008
PREP TO POUR ELEVATOR PIT WALLS OK TO POUR WHEN READY
Footing Inspection - Commercial Passed 10/21/2008
Correction
Resolved
10/21/2008
FOOTING SLAB AT ELEVATOR SHAFT
All Rough Inspection - Commercial Failed 01/30/2009
Correction
Partial Correction
01/30/2009
ROUGH FRAMING ELEVATOR- INTERIOR LIGHT GAUGE FRAMING ONLY-1ST AND 2ND FLOOR OK TO COVER
All Rough Inspection - Commercial Passed 02/05/2009
Correction
Resolved
02/05/2009
ELEVATOR DOOR OPENINGS FRAME/FUR & LINER BOARD ELEV LOBBIES 01A & 168A
Correction
Resolved
02/05/2009
ROUGH FRAMING INT WALLS 1ST & 2ND FLRS LIGHT GAUGE FRAMING
Rough Electrical Inspection - Commercial Passed 02/05/2009
Correction
Resolved
02/05/2009
CONDUIT INTO ELEVATOR SHAFT PENETRATIONS THRU CMU ARE FULLY SEALED WITH MORTAR OR FIRE CAULK NO ISSUES FOUND OK TO COVER AFTER
Rough Plumbing Inspection - Commercial Passed 02/05/2009
Correction
Resolved
02/05/2009
HYDRAULIC PIPING INTO ELEVATOR SHAFT PENETRATIONS THRU CMU ARE FULLY SEALED WITH MORTAR OR FIRE CAULK NO ISSUES FOUND OK TO COVER AFTER
Rated Assembly Inspection Passed 02/11/2009
Correction
Resolved
02/11/2009
FIRE-RATED ASSEMBLY AT ELEVATOR DOOR OPENINGS OK TO COVER WHEN READY LINER BOARD + 5/8" X GWB 1ST FLOOR & 2ND FLOOR
Above Ceiling Inspection Passed 02/17/2009
Correction
Resolved
02/17/2009
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS OK TO COVER WHEN READY 1ST & 2ND FLOOR LOBBIES
Final Inspection - Commercial Partial 02/20/2009
Correction
Corrective Action Required
02/20/2009
INSTALLATION OF EXTERIOR LIGHTING MATERIAL DELIVERY PENDING SUBJECT TO APPROVAL
Correction
Partial Correction
02/20/2009
CODES ADMINISTRATION INSPECTION 1) FIRE DEPARTMENT INSPECTION 2) STATE ELEVATOR INSPECTION NO VIOLATIONS FOUND OK FOR USE CONTINGENT ON:
Correction
Corrective Action Required
02/20/2009
Receive Fire Department approval CONTACT CPT JOE DIR PHONE 816-969-1313
Final Inspection - Commercial Passed 03/09/2009
Correction
Resolved
03/09/2009
Receive Fire Department approval PER CPT JOE DIR 3/9/09
Correction
Resolved
03/09/2009
CODES ADMINISTRATION INSPECTION 1) FIRE DEPARTMENT INSPECTION
Correction
Resolved
03/09/2009
INSTALLATION OF EXTERIOR LIGHTING
Correction
Resolved
03/09/2009
STATE ELEVATOR INSPECTION REPORT RECEIVED DATED 3/3/09
Documents & Images

No documents are currently available for viewing.

Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home