Permit Application Status

B0801018


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0801018
Building Permit - Commercial
Certificate of Occupancy
REORGANIZED SCHOOL DIST NO 7
ADDITION COMMERCIAL
LEES SUMMIT NORTH HIGH SCHOOL BUILDING ADDITION & INTERIOR ALTERATION
07/10/2008
09/12/2008
02/13/2010
08/19/2009
Locations
Contacts
ALPHA ENERGY AND ELECTRIC INC, Address:1134 E 34TH ST  
GENERAL PLUMBING CONTRACTORS, Address:2524 MANCHESTER TRFY  
HORST TERRILL & KARST ARCHITECTS, Address:9300 W 110TH ST SUITE 150  
BRUNER CONTRACTING LLC, Address:218 DELEWARE ST STE 211  
TEMP CON INC, Address:15670 S. KEELER  
LEES SUMMIT R-7 SCHOOL DISTRICT, Address:502 SE TRANSPORT DR  
REORGANIZED SCHOOL DIST NO 7, Address:600 SE MILLER  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 02/08/2009 10/29/2010
Correction

Codes Administration - All plans submitted for review on or after July 9, 2007 shall be designed to the requirements of the 2006 International Building Code, 2006 International Mechanical Code, 2006 International Plumbing Code, 2006 International Fuel Gas Code, 2006 International Fire Code, 2005 National Electric Code and the ANSI A117.1-2003 as amended and adopted by the City of Lee's Summit.
Correction

Codes Administration - 2006 IMC 403.2 - Outdoor air required. The minimum ventilation of outdoor air shall be determined in accordance with Section 403.3. Exception: Where the registered design professional demonstrates that an engineered ventilation system design will prevent the maximum concentration of contaminants from exceeding the obtainable by the rate of outdoor air ventilation determined in accordance with Section 403.3, the minimum required rate of outdoor air shall be reduced in accordance with such engineered system design.
Correction

Fire Department- 2006 IFC 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5.1- Occupancy. It shall be unlawful to occupy any portion of a building or structure until the required fire detection, alarm and suppression systems have been tested and approved.
Correction

Fire Department- 2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Codes Administration - ICC/ANSI A117.1 2003 604.5.1 - Fixed sidewall grab bars. Fixed sidewall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located between 39 inches and 41 inches above the floor, and with the center line of the bar located between 39 inches and 41 inches from the rear wall.
Correction

Codes Administration - 2006 IBC 1006.3 - Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the evenet of power supply failure, an emergency electrical system shall automatically illuminate the following areas. 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, exit enclosures and exit passageways in building requried to have two or more exits. 3. Exterior egress componenets at other than the level of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1024.1, in buildings required to have two or more exits. 5. Exterior landings, as required by Section 1008.1.5, for exit discharge doorways in building required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702.
Correction

Codes Administration - 2006 IBC 1210.2 - Walls. Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. Exceptions: 1. Dwelling units and sleeping units. 2. Toilet rooms that are not accessible to the public and which have not more than one water closet. Accessories such as grab bars, towel bars, paper dispensers and soap dishes, provided on or within walls, shall be installed and sealed to protect structural elements from moisture.
Correction

Fire Department- 2006 IFC 1504.4 Fire protection. Spray booths and spray rooms shall be protected by an approved automatic fire-extinguishing system complying with Chapter 9. Protection shall also extend to exhaust plenums, exhaust ducts and both sides of dry filters when such filters are used. 1504.4.1 Fire extinguishers. Portable fire extinguishers complying with Section 906 shall be provided for spraying areas in accordance with the requirements for an extra (high) hazard occupancy.
Correction

Fire department- 2006 IFC 1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities.
Correction

Fire Department- Will the dust collection system be reused?
Correction

Codes Administration - The mechanical plans indicate fire dampers in the ducts penetrating the wall between the I-Tech Lab and the storage area but the wall is not shown to be rated.
Correction

Codes Administration - The exit signage shown on the electrical plans does not match the exiting plan provided on Sheet T1.3.
Correction

Codes Administration - Plans for the pre-cast panels have not been provided.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $2,203.74 $2,203.74 Paid 09/12/2008
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Partial 11/03/2008
Correction
Partial Correction
11/03/2008
None SHEET S1.0 FOUNDATION PLAN #1 PIERS ON LINE 1 - APPROVED PIER ON LINE B AT LINE 4
Piers/Caissons Inspection - Commercial Passed 11/04/2008
Correction
Resolved
11/04/2008
None ALL PIERS COMPLETED
Correction
Resolved
11/04/2008
None SHEET S1.0 FOUNDATION PLAN #1 PIERS ON LINE 1 - APPROVED PIER ON LINE B AT LINE 4
Footing Inspection - Commercial Partial 11/05/2008
Correction
Partial Correction
11/05/2008
PREPARATION TO POUR GRADE BEAM ON (1) FROM (A) TO (B); ON (2) FROM (A) TO (B.2); ON (3) FROM (A) TO (B); ON (B) FROM (1) TO (3.2); OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Passed 11/07/2008
Correction
Resolved
11/07/2008
PREPARATION TO POUR GRADE BEAM ON (1) FROM (A) TO (B); ON (2) FROM (A) TO (B.2); ON (3) FROM (A) TO (B); ON (B) FROM (1) TO (3.2); REMAINDER OF GRADE BEAMS & FOUNDATION, CONTINGENT ON SPECIAL INSPECTION OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Miscellaneous Inspection Partial 06/29/2009
Correction
Corrective Action Required
06/29/2009
UNSOLICTED COURTESY OBSERVATIONS TELECONED TO SUPT RON 6/29/09
Above Ceiling Inspection Passed 07/28/2009
Correction
Resolved
07/28/2009
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS OK TO COVER WHEN READY AFTER MC SECURED W/I 12"
Rough Electrical Inspection - Commercial Passed 07/29/2009
Correction
Resolved
07/29/2009
GROUNDING OF METALLIC ELECTRICAL BOXES
Occupancy Inspection - Codes Commercial Not Ready 07/30/2009
Correction
Corrective Action Required
07/30/2009
ELECTRICAL SYSTEM FINAL INSPECTION SOURCE ELECTRICAL PANELS INSPECTIONACCESS REQUIRED
Correction
Corrective Action Required
07/30/2009
ELECTRICAL RECEPTACLE AT A101 SOUTHWEST NOT SECURE IN BOX
Correction
Corrective Action Required
07/30/2009
ABANDONED ELECTRICAL WIRING NOT CAPPED / ENCLOSED INDUSTRIAL ARTS RM SE
Correction
Corrective Action Required
07/30/2009
READINESS FOR INSPECTION LSCO SEC 7-142; IBC 106: NO INSPECTIONS WITHOUT PERMIT DRAWINGS PERMIT DRAWINGS NOT FOUND ON SITE
Correction
Resolved
07/30/2009
Receive Water Utilities Approval NO ISSUES PRESENTED
Correction
Resolved
07/30/2009
Receive Public Works Approval PER BILL LYON 7/30/09
Correction
Corrective Action Required
07/30/2009
Receive Planning & Development Approval TO RESOLVE OUTSTANDING ISSUES CONTACT CHRIS HUGHEY PHONE 816-969-1617
Correction
Resolved
07/30/2009
Receive Fire Department approval PER CPT JOE DIR 7/29/09
Miscellaneous Inspection Passed 07/30/2009
Correction
Resolved
07/30/2009
UNSOLICTED COURTESY OBSERVATIONS
Occupancy Inspection - Codes Commercial Failed 08/05/2009
Correction
Corrective Action Required
08/05/2009
ENLARGED RESTROOM 1) SIDEWALL VERTICAL GRAB BAR NOT INSTALLED PER ANSI A117.1 2) BOTTOM OF MIRROR REFLECTIVE SURFACE > 40" A.F.F. 3) GROUND ROUGH PLUMBING NOT REQUESTED FOR INSPECTION ISSUES BELOW:
Correction
Corrective Action Required
08/05/2009
RETURN AIR INTAKE AT MEZZANINE AIR HANDLER NOT SCREENED
Correction
Corrective Action Required
08/05/2009
ELECTRICAL SYSTEM FINAL INSPECTION PANEL SCHEDULES REQUIRE UPDATE/SPECIFICS
Correction
Resolved
08/05/2009
ELECTRICAL RECEPTACLE AT A101 SOUTHWEST SECURED IN BOX
Correction
Resolved
08/05/2009
ABANDONED ELECTRICAL WIRING CAPPED / ENCLOSED INDUSTRIAL ARTS RM SE
Correction
Resolved
08/05/2009
READINESS FOR INSPECTION
Correction
Resolved
08/05/2009
Receive Planning & Development Approval PER CHRIS HUGHEY
Occupancy Inspection - Codes Commercial Passed 08/18/2009
Correction
Resolved
08/18/2009
ENLARGED RESTROOM GROUND ROUGH PLUMBING NOT REQUESTED FOR INSPECTION NOW SHOWN IN DETAIL ON AS-BUILT DRAWING DATA.
Correction
Resolved
08/18/2009
RETURN AIR INTAKE AT MEZZANINE AIR HANDLER NOW SCREENED
Correction
Resolved
08/18/2009
ELECTRICAL SYSTEM FINAL INSPECTION
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home